Design for civil construction and augmentation of two sewage pumping stations. Design for installation and commissioning of mechanical and electrical works for the pumping stations.

Description of the project:

The Lerato Park Integrated Housing Project in Sol Plaatje (Kimberly) aims to address the significant housing backlog in Sol Plaatje.  Some 4500 units are expected to be delivered through this project.  The existing link water and sewer infrastructure needs to be augmented/upgraded to cater for the increased demand.  This includes the upgrading/augmentation of two existing sewerage pumping stations.

Services provided:

  • complete the civil-, electrical- and mechanical engineering designs up to approve for construction status including as-built drawings; and
  • Services also include technical site support and supervision.