Sasol Ekandustria Structural Upgrades

Fabrication and installation of a new structure for MMAN Scrubber based on old structure. 3D lidar scanning was used to draw up the design of the new structure based on the old one. Services Provided:

Sudan Defected Pipeline Replacement

Engineering, procurement and construction of the replacement of three 32″ defected crude oil pipelines by means of hot-tap works and by-pass lines Defected pipe replacement at KP 238, KP 362 & KP925 on 32″ waxy crude oil line in Sudan. The replacement was done by hot tap stopple bypass system ensuring the line stays in […]

Impressed Current CP and AC Mitigation System for Greytown Water Scheme

The Supply and Installation of an Impressed Current Cathodic Protection and AC Mitigation System for the 36 km pipeline between Craigieburn Dam and Greytown Water Treatment Works. Services Provided: The Works entail the supply and installation of a Cathodic Protection (CP) and AC Mitigation (ACM) system for the 500mm, 450mm and 400mm NB Craigie Burn […]

Lephalale Coal Bed Methane Opportunity Study

The objective of the project was to explore the opportunity of using the gas from the Lephalale Cola Bed Methane (LCBM) low-pressure gas field as a diesel replacement for the Anglo mining operations within South Africa and Botswana (yellow-plant conversions from diesel to LNG). Further, the aim has been to identify a commercially viable scenario […]

Tiper Tank Farm Pump House and Piping Desing

EPCM performed the 3D scanning of the existing depot space, and completed a detailed 3D model design of a new pump house, piping connections, and piping manifolds to facilitate tank filling, inter-tank transfer and pumping to various other depots. The 3D point cloud was used to do actaul space planning in order to obtain a […]

Augusta Energy Project

Operations required to complete Pipeline Swab Pigging on 1 x 8” x 1km pipeline from near the Petromoc Discharge header towards the CFM Manifold and 1 x 12” x 1.2km pipeline from the CFM Manifold to the 12” – 8” reducer on the jetty. The pigging process will be aimed at removing the current contents […]

AFGRI Due Diligence

Capacity assessment and KPI development for Port Services Agreement AFGRI are planning to enter into a port services agreement with Transnet.  As part of the contract development, AFGRI engaged EPCM to develop the contract KPIs between the participants Services Provided

Foskor Sulpher Burner and Heat Exchanger Replacement

EPCM was awarded the contract to fabricate, deliver to site, install and commission a sulphur burner and 300ton cold-pass heat exchanger after demolishing the old burner and heat exchanger on the Foskor Sulphuric Acid plant. Services Provided:

Transnet Sugar Wagons

EPCM in provided services for the supply and coating repairs to the internals of the sugar wagons applying Corrocoat Plazmet ZF primer for Transnet engineering FFJ-1 Wagons Durban. Services Provided: