Pipeline Current Mapping (PCM) Survey Cathodic Protection (CP) is applied to buried steel pipelines to complement the protection provided by pipe coating. If the coating is damaged, causing holidays, or if there is an electrical contact between the pipeline and another metal structure, the CP current must be increased to compensate for the resulting losses. Note that this is not achievable using Sacrificial Anode Cathodic Protection (SACP).
Excessive current can be detrimental to the pipe. Therefore, the engineer responsible for the pipeline integrity must achieve a fine balance between effective protection and acceptable current consumption.
If the current becomes excessive, the cathodic protection is ineffective, or a new pipeline has been constructed, and the coating quality needs to be assessed. The pipeline must be surveyed to locate all major faults.
The Pipe Current Mapper has been specifically designed to perform this function and is covered under ANSI/NACE SP0502 “Pipeline External Corrosion Direct Assessment Methodology“.
A brief description of the shortcomings of commonly used traditional methods of surveying for pipeline current faults is detailed below :
The potential gradient between two access points is measured, and the current is derived through calculation. This method is lengthy, complicated, and costly and presents a significant risk of error in measurements and calculations.
Two electrodes are placed on the ground to detect the fault current. This method is personnel-intensive and impractical in very dry soil conditions; it does not measure current losses, so it cannot differentiate between minor and major faults.
A traditional pipe locator detects an AC (typically 1 kHz) applied to the pipeline. Large signal losses are assumed to be due to large faults. The losses are also due to capacitance losses along the pipeline, so the natural decay of the signal very often masks faults. This current does not exactly mirror the CP DC. The effect can be particularly misleading at pipeline branches. Capacitance losses also limit the length of pipelines surveyed in one operation.
The PCM has been designed for the pipeline industry with support from Gas Industry leaders. It addresses problems associated with traditional methods of pipeline surveying by providing the following benefits:
The PCM has been designed to overcome the shortcomings of the existing techniques and now provides pipeline engineers with an accurate, cost-effective product that can be used in all weather and ground conditions. An extremely low, “near DC” frequency (4 Hz) mirrors the DC generated by the cathodic protection as closely as possible. It also avoids signal losses caused by capacitance, so nearly all the signal loss is due to coating faults or shorts to other structures. Conventional pipe locators cannot practically detect such a low frequency, so the receiver is fitted with a precision, high-performance magnetometer. This detects and measures the 4 Hz magnetic field. Advanced signal processing techniques filter and amplify the signal so that push-button current measurements (magnitude and direction) of the “near DC” signal can be made. Integral data logging functions enable storing this data to plot the current loss versus distance.
Figure 1: Typical PCM Transmitter Setup at TRU
The PCM system’s high-powered transmitter makes long-range signal detection up to 15 km possible. Therefore, fewer hookups are required. The transmitter’s flexible power requirements enable it to utilize the variety of supplies available. The transmitter has been designed to be compatible with both distribution and transmission networks. The hand-held receiver unit first locates the pipeline, even in heavily congested areas, and then provides the operator with a measurement of the current magnitude and direction of the near DC signal as applied by the system’s transmitter.
The receiver makes the required calculations and displays the results with a single button press. The measurement can be stored in the integral catalogue with a further button press. This provides the operator with a method for quickly troubleshooting the CP system by pinpointing metallic contacts and locating areas of coating defects, as detailed in Figure 2 below. Additional cable location modes allow the unit to be used as a traditional cable and pipe locator.

Figure 2: PCM Location of coating fault
PCM Attachment (magfoot) contains the magnetometer (mag foot) that detects the near DC mapping current. The PCM magnetometer foot is switched on when the PCM current key is pressed for a PCM measurement. When the PCM foot is fitted to the PCM receiver, there will be a confirming “beep” from the loudspeaker. The PCM magfoot also stores the pipeline’s current mapping results in the built-in data logger, and it must be attached to the receiver to upload results to a PC.
Careful use of the PCM will give the location of coating faults within just a few metres. The addition of the A-Frame attachment enables the operator to pinpoint the fault within a few centimetres, keeping excavation costs to a minimum.
A signal entering the ground is detected through the A-Frame spikes (ACVG) and amplified by the receiver electronics. An arrow on the display points to the direction of the fault, enabling quick and easy pinpointing as detailed in Figure 3 below.

Figure 3: A-Frame used to pin-point coating defect
The PCM is provided with a simple-to-operate, Windows-based upload software package. The “Icon” operated software enables the uploading of PCM data and automatic conversion to text format. This is compatible with commercially available spreadsheet software packages. A typical example relating to the pipe graphics is illustrated below in Figure 4.

Figure 4: Example of data output.
The PCM surveying methodology is detailed below :
The AC signal current applied to a coated pipeline in perfect condition will be lost by capacitance as distance increases from the point where the signal is applied. The resulting graph drawn using A/mA will have an exponential slope because there is a greater current loss rate close to the transmitter.
The PCM uses a near DC signal (4Hz) for current measurement, so capacitative losses are minimal.
Example: There was a coated pipeline with three defects of equal electrical resistance: one near the beginning, the next in the middle and one at the end. If the current loss graph is prepared using mA on the vertical scale, the second and third faults would be shown as progressively smaller steps in the graph. This is due to Ohm’s law and the loss of current at the previous fault.
This article has been republished with EPCM with the kind permission from our marine structure pipeline partner – Krah Pipelines.
Despite advancements in tangential extrusion technology for mandrels, many clients, engineers, and contractors still favour conventionally extruded, solid-wall PE pipes for marine projects. This preference often stems from a lack of awareness about Krah Marine Pipes (KMP), which have been successfully utilized in numerous high-profile projects worldwide.

KMP – Outfall pipeline DN/ID 3400 mm
We carried out marine projects for desalination plants, power plants, sewage treatment plants and other intake/outlet pipelines. Here, we used Krah Marine Pipes with structured and solid (pressure) walls.
Nothing speaks against solid wall conventional axially extruded pipes, which have been familiar for many years—as they were the state of the art for many years. “Familiarity” means that, in general, no big effort is needed to design and install this well-known “stuff.”
Unfortunately, Krah Pipe Producers Worldwide still needs to convince engineers that our pipes suit this application. From a cost point of view, we are a very attractive solution—not only for the pipe but for the complete project, including ballasting and sinking. So, we must improve our marketing and technical documentation to move from a niche market player to the main player.
Tangentially extruded pipes, theoretically and practically, should be equally familiar. Companies like KWH, Bauku, Henze (including Chinese copies) and others have been producing several types of ribbed/profiled pipes, low pressure, high ring stiffness, destined mostly for landlines, fittings, manholes and storage tanks applications since the 1970s.
In the 1980s, ribbed or profiled pipes were tested in a few outfall projects, but they proved unsuitable and too costly. The main challenges included inconsistent wall thickness along the waterway, inadequate fusion of the profiles, lack of high-quality jointing methods, and the high costs associated with low extrusion output and the limitations of extrusion technology at the time.
The structural design was continuously developed and covered mostly by the DIN Standards, but until the late 1990s, we were speaking of single-wall pipes with ribs/profiles.
Since the end of the 90s, Krah has developed a new homogenous pipe with correct waterway wall thickness and proper jointing. Together with high production output, the pipe was, and still is, a very successful solution for all kinds of marine pipes. Many large-size projects were realized worldwide by companies like PPA&KRAH, Krah-Pipes, HENZE, FRANK, Krah Estonia, Krah America Latina, Krah Chile, Krah Egypt, Polyplastic, Polypipe, UGPM Oman just to name a few. The largest diameter achieved to date is in Argentina, with an internal diameter of DN/ID 3600 mm, fully joined by electrofusion and successfully deployed underwater. Previously, axially extruded PE pipes were typically used only up to DN/OD 1600, with an SDR17 rating, due to limitations in production and engineering capabilities.
Today, conventional axially produced pipes are manufactured up to DN/OD 3000, and advances in engineering now allow for an SDR of 33. For Krah pipe producers, the updated 2018 DIN 16961 standard remains foundational for technical guidelines. Many other international standards, such as ASTM F894, IRAM 13414, and JIS K 6780, have adopted the older version of DIN 16961 as a national standard. Standard double-wall pipes, regulated up to DN/OD 1200 by EN/DIN 13476 or ISO 21138, are not suitable for marine pipe applications due to the unique demands of these environments.
A few engineers started to implement the possibility of using structured wall pipes for marine applications, using the geometrical and mechanical properties of the structured wall (moment of inertia, waterway wall thickness, buckling resistance).

A closed profile for Krah Marine structured Pipes (double chamber wall, super high stiffness)
For installation in the marine environment, the axial load capacity and bending resistance are more important than the ring stiffness alone. Therefore, it is intuitive why the real double-wall structure (KMP) sections are more suitable for marine use.
A well-calculated double-wall structure can be designed with a requested equivalent SDR (eSDR), and a ring stiffness can exceed the SN values of solid wall pipes with that typical SDR. It is also possible to produce exactly the required ring or pipe stiffness. The waterway wall thickness can be produced exactly according to the applied working pressure. Today, a Krah Marine Pipe (KMP) is a tailor-made solution that can economically realise marine pipelines.
The developments started to follow two directions: pipe wall construction with single—or multi-layer profiles or walls with square or round chambers. Both are extruded on mandrels with spirally applied layers (“tangential extrusion” is the technical term in the standards—here, Krah production technology).
Further details on the various properties and specifications of KPM can be found in DIN/PAS 1065:2007-11, titled “Spirally Wound Pipes Made from Polyethylene (PE 100) – Tangentially Extruded – Dimensions, Technical Requirements, and Tests.” This standard outlines essential dimensions, performance requirements, and testing procedures for KMP pipes.
As the Krah Group, we have decided to proceed in a relatively new way: by defining a structured wall that can be easily dimensioned to obtain the characteristics necessary for marine projects.
The KMP – Krah Marine Pipe – is a “real” double wall pipe, presenting two thick, continuous layers and internal chambers/profiles that are alternatively circular and rectangular (or a combination of both). Today, corrugated pipes (produced on a corrugator, not on Krah production technology) are also called double-wall, but they are not “real” double-wall pipes; they have not the availability to handle internal working pressure, they have no pressure-resistant joint, and their bending characteristic are not homogenous.

KMP – wall structure
The Krah-Marine Pipes (KMP) always have a homogenous and smooth inner layer. It is not a pipe welded by prefabricated square profiles. It always has a socket and spigot and does not end in an open profiled spiral.
The pipe is weldable, and fittings and manholes with the same wall structure are easily produced.

Every pipe has a solid wall electro-fusion socket, a double wall area and a solid wall spigot.
Krah Marine Pipes (KMP) are available from DN/ID800 mm up to DN/ID5000 mm. The standard pipe length is 6 m, but the pipes can be pre-jointed at the production facility to increase the installation speed. Depending on the client, all pipes can have an inspection-friendly inside surface. Krah Pipes, in general, is available from DN/ID300.
Our standard calculations are based mainly on the following approaches, according to existing standards and covered up by references and experiences. A third-party engineering company can and should always check our proposals.
All Krah Marine Pipes are calibrated on inner diameter – so nominal diameter DN is the internal diameter ID. That means the inner diameter does not change if the wall thickness increases. We are often faced with misunderstandings regarding the nominal diameter and the meaning of inner and outer diameter. Our nominal diameter is the hydraulic diameter.

Tangential and axial extruded pipes are the effect on the hydraulic diameter.
For example:
A Krah Marine structured Pipe DN/ID 2000 provides an inner diameter of 2000 mm for all stiffness and pressure classes!
A conventional direct extruded pipe DN/OD 2000 always provides a significantly lower inner diameter than 2000 mm and is related to SDR class/wall thickness:
DN/OD2000, SDR 21, PE 100 (stiffness approx. SN 12, PN 8) => hydraulic diameter of ID 1808 mm
DN/OD2000, SDR 26, PE 100 (stiffness approx. SN 6, PN 6) => hydraulic diameter of ID 1846 mm
That means to be competitive in hydraulics to a Krah Pipe DN/ID 2000, a much bigger DN/OD pipe must be considered:
DN/OD2200, SDR 21, PE 100 => ID 1990 mm
DN/OD2200, SDR 26, PE 100 => ID 2030 mm
A difference in inner diameter directly affects the velocity and flow characteristics. Together with the quality of the inner surface, the diameter defines the pressure loss for the volume flow rate.
Krah Marines Pipe (KMP) are standardized for pressure load capacities according to DIN 16961 and DIN PAS 1065. For decades, Krah Pipes have been used for pressure load applications, and now they are finally respected and described in the standard.
Instead of mentioning only a “design pressure”, we highly recommend differing between operating pressure and real stiffness. The real stiffness must result from technical calculations and not only a “choosing” of stiffness class according to ISO9969. It makes no sense to large-scale old realized projects with small pipe diameters. The price difference is huge; technically, a large scaling has no positive effect. Reduce the project costs by calculating and not by copy-paste!
The inner (waterway) wall of Krah Marine Pipes is designed according to real operating and pressure conditions. We face no inner pressure for intake lines, but for outfall lines, the Maximum Operating Pressure (MOP) is decisive! We can design the Krah Marine Pipes for any inner pressure without limitation. However, the inner wall thickness increases with increasing pressure resistance, making it less efficient.
Remember: The increase in the wall thickness of KMP does not affect the hydraulic diameter of the pipe!
It is commercially and technically recommended that the inner wall be designed according to the real working conditions. Don’t ask for a high “design pressure” when you have special needs for the sinking process or pipe backfilling.

Extract DIN16961:2018, Attachment D
In the past, we have realized many projects where complete pipe systems were installed underground, with a very difficult ground situation and complicated backfilling. We can and do consider the backfilling and installation of the pipeline after the sinking process. We provide a full structural calculation of the pipes according to international standards.

Testing of the pipe stiffness and flexibility (30% deformation)
Concrete ballast blocks are typically used for polyethene pipes to avoid buoyancy.
Of course, this is also available and standard for Krah Marine Pipes. Normally, the concrete blocks are positioned every 6 meters. The slightly profiled outer wall is an advantage to direct extruded pipes, especially at the joint. That reduces the risk of slipping to zero percent, even at big changes in temperature and because of that a shrinking of pipe diameter.

Here, you see concrete blocks mounted in the pipes.
Cheap blocks without any screws can be used; the blocks are linked to the pipe structure by using concrete.

A very cost-effective solution for the blocks
Another smart and patented solution is the partial filling of profiles with concrete/grout. The second spiral fills the Krah Marine Pipe structure with concrete/grout. That means the pipe is still semi-flexible and can be bent easily, but it is heavy to reduce or eliminate concrete blocks. The second “load” spiral can be filled partly. The filling can be done at the factory or in the short term before installation.

A smart solution – a partially filled KMP
The bending radius depends on the wall structure and filling but can reach values of two times the unfilled Krah Marine Pipe profile. If all chambers are filled (one spiral solution), the pipe must be handled as a fixed, rigid beam.
Because it partially fills with the defined distance, the Krah Pipe remains semi-flexible and provides all the benefits of a typical S-curve installation.
Krah Marine Pipes are designed for a 50 x pipe diameter bending radius. We consider the strain of outer fibre and buckling resistance in design. Because of the stiff pipe wall structure, Krah Marine Pipes provide the highest safety against buckling.
Many finite element analyses were carried out – including the bending behaviour of the joints.

FEM – Analysis of a bent Krah pipe
Krah Marine Pipes are produced from high-quality PE 100, which has the best strength and stability characteristics. These proven values are used in all our calculations.

A bent Krah pipe
Our nice combination of flexibility and stiffness will give the Krah Marine Pipeline a perfect response to seismic ground movements, which often happen after installation. Several tests have been done; details and independent test reports can be requested at Krah-Pipes in Germany.
At Krah Pipes, an electrofusion process homogenises the axial wall thickness. The joint is designed for the same load as the pipe wall itself. There is no weak point in the complete pipe string, and no separate reduction factor must be considered. For the pulling force only, the minimum axial connected wall thicknesses are considered, even because a “spiral”—in our case, a double spiral—can handle pulling forces too—so we consider this aspect a special safety to our marine solution.
The real Krah Marine Pipe double-wall structure gets homogeneously jointed by an integrated Krah electro-fusion process. The Krah Marine Pipe electro-fusion joint guarantees a strong connection between the pipes. Because inner and outer wall are joined by electrofusion a perfect load transition is assured for all occurring stresses/loads. Also, the stiffness of the jointing area is higher than the stiffness (requirements) of the pipe itself. Compared to butt-fusion, another large benefit of an integrated electro-fusion joint is that KMP has no NO-sagging of pipe – to provide a better, safer and quicker installation.

Krah welding equipment for large pipes
As you can see in the picture above, the KMP joints need “only” little E-fusion devices and no expensive butt-fusion machines. For every joint made, the machine can print a detailed jointing report to have a full set of QC documents.
It is funny that Krah-Electro-Fusion fittings were used to repair conventional PE pipes when butt–fusion machines weren´t possible. So, it seems even our competitors trust our electro-fusion joint, and they are happy.
Krah Marine Pipes produce all kinds of fittings (bends, reductions, branches, diffusers, etc.) and manholes/intake towers with the same technology and jointing. This has been one of the core businesses for these kinds of pipes since the 1980s. To fabricate these fittings, stronger wall constructions are usually used to handle the welding factors and other properties.

An integrated stub-end for a flange connection
A stub-end (for flanges the pipe strings to each other) can be a direct part of the pipe.

Even the flanges can be tested by FEM.
It is kind of funny that many conventional PE pipe producers are using Fittings, Manholes, and Stub Ends produced by tangential extruded technology—mainly Krah pipes (and they don´t mention this in their specs). So, even our competitors trust the homogenous wall structure of our fittings for sensitive elements of the pipe strings.

Fittings (bend) for an outfall project

Intake chamber design
During the planning and calculation of the sinking process, other effects in the design can occur, like string lengths, waves, currents, wind, speed of installation, using floaters, etc. These will affect the calculation mentioned above conditions and will be considered there.

The photo above shows the floaters used during the deployment by PPA&Krah in a project in Peru
By the way, the same Krah machines can also produce solid wall pipes in maximum diameter of DN/ID 5000mm; with the same normalization – EN12201 – of axially extruded pipes, besides structured wall KMP pipes. It is easy to reach a homogenous solid wall thickness of 200 mm to 300 mm (with no sagging, voids, or blisters). The production technology can be extended to all interested Krah pipe producers who will produce Krah Marine Pipes under Krah’s supervision and license. The latest production line, called KR800-max, continuously controls the homogenous wall structure.

Production line KR800 – MAX – able to produce KMP up to DN/ID 4000mm
The production area needed is only 20m x 30m x 6m– so it is quite easy to move or set up a plant close to the project site. This will increase the speed of the installation, lower transportation costs, and reduce the possibility of “forgotten” parts.
Krah-Marine-Pipes (KMP) are available from DN/ID1000 up to DN/ID4000 mm in the length of 6m. The pipes are produced out of polyethene PE100 and can have a co-extruded yellow inspection-friendly inside surface. An integrated special electro-fusion joint does the joining of the pipes. The pipes can be designed according to the project requirements concerning working pressure, stiffness, bending ratio and pulling force – to guarantee the price and quality optimum for a marine project.
Price- and quality-wise, Krah Marine Pipes (KMP) are a very attractive alternative to other marine pipe materials, like GRP, steel, concrete and, of course, to conventional solid wall PE pipes. The market of large diameter pipes for a marine application is huge, so the Krah Group will concentrate its network (today approx. 50 Krah-Pipe producers worldwide) to provide a good solution for the clients for their desalination-, power-, treatment- plants or any other marine application in the future. Complete design software for Krah Marine Pipes (KMP) should be available in 2019, and we will have a tight and close relationship with several international engineering companies to support the final customer and build a solid foundation of technical experience and documents. We will join the experience and documents from our network partner, and be more present in global projects.
Retail Fuel Station refurbishment, like any other asset, must be upgraded at times to keep up with modern safety standards and changing customer requirements.
Upgrading an existing, established retail fuel station presents different challenges than developing a new (or so-called “greenfields”) station. You must contend with an established layout and flow of vehicles and people and adapt the old infrastructure for new customer requirements.
This article will highlight some challenges we have faced and solutions developed/proposed for our Retail Fuel Station Upgrade projects. These could assist the reader in making their refurbishment project a success.
When planning a fuel retail refurbishment project, it is crucial to engage the station’s owners and assess what currently works, does not work, and what they envisage after the project is completed. In many cases, the owners are unsure themselves as to what they require. In this case, you would need to guide them in understanding what it would take to operate their station efficiently.
With regard to the infrastructure, one of the first things to consider is where to place new tanks. From the ease of construction perspective, it would be beneficial to place them in the location of the current tanks, as removing the current tanks and the void that is created will assist with a reduction in construction time and cost to place the new tanks.
One often underestimates the size of the tanks that are placed in a fuel retail station. A 30m3 tank excavation will be at the absolute limit of what a normal TLB would be able to achieve. Keep in mind that adequate drainage is needed around the tanks. These tanks also sit on a bed of soft soil to aid in compaction and protect the tank’s integrity. Once the tanks are in the ground, it is crucial to fill them with water. These tanks often tend to pop out of the ground if they are empty and the backfilling process begins. Backfilling of the soil should be done in layers of approximately 300mm and compacted throughout. Many fittings, piping, and sump material are attached to the tank, so consider that when determining the excavation depth.
Newer tank manufacturing processes involve making the tank utilizing fibreglass and special plastics. These tanks are double-walled and quite easy to handle. Throughout America and Europe, these tanks have become the gold standard. They are also secured in place, employing special foundation beams on each side and straps holding the tank down.

When the tanks are excavated, the piping trenches should start. One thing to note is that the piping from the tanks to the first dispenser should be free of any bends or unnecessary loops. This ensures that adequate fuel flow is always maintained. The piping trenches between dispensers should be the shortest minimal distance. These trenches also have to be wide enough to accommodate the piping as well as cable sleeving.
At the site of the dispensers, it is advisable to first place the dispenser sumps into the excavation and then align them. The sumps should be properly secured, as there will be a lot of tugging and pulling to get the final pipework in. Be sure about the specific retailers’ requirements for how the final island should look and what position the dispensers should be in. Once your piping is secured and welded together, it is challenging to change positions.

At this stage, the tanks and sumps are in position, and they need to be connected.
It is advisable to install a shutoff valve on each line leading from the tanks. This will facilitate maintenance and fault finding with minimal spillage and increase safety.
The industry standard is to use HDPE piping which will be electrofusion welded. These pipes can be in a single or double-walled variety. The double-walled pipes are usually used between sumps and the single walls on internal piping. The welding process itself is quite easy, but the welder needs to be trained and competent to set up every weld. On every weld, the welder must indicate the following details: the number of welds in sequence, the date, the time, and the welder’s name. This ensures that the welder is cognisant of the time the weld is executed and if the weld has soaked enough. These welds are strong, but the key to them is preparation and leaving enough time to soak and dry. Welding all the pipes, including the ones going into the dispenser, is strongly recommended. It is usually at this point where the system is prone to leaks.

You must pressure test the system before backfilling. If not done, you run the risk of fault-finding later by excavating all piping and dealing with fuel while searching for the problem.
There are four main points on the tank flange that you need to take care of:

If you are refurbishing a fuel station, you might want to use the old vent stacks. This is only advisable if they comply with current regulations. The main problem is that the vents need to be high and far enough to release vapour safely from any electrical supply or human interaction. We have found on occasion that these older vents are blocked or partially blocked. This will cause the overall system pressure to rise and could cause a leak on hotter days.
You can simply attach a compressor on one end and blow them out to clean these vents. For more stubborn blockages, connect a nitrogen cylinder to the piping and blow out any debris that is stuck.
Before backfilling the excavations, ensure the cable sleeving is in place. The electricians connect all the cabling last. The piping and cable sleeving require a layer of soft sand around the equipment to protect them from damage.
The area over the excavations can now be concreted or paved as specified by the client.
Usually, the fuel stations require an aesthetic upgrade as well. This will include painting the canopy, installing new lights and upgrading the branding of the overall site. This is the final item the client and the public will see, so it pays to keep a close eye on the finishing.
Once all the hardware is in and the branding is done, it is just a matter of getting the license to operate from the fire department and welcoming customers to your new station.
Read more about EPCM here.
In an ever-changing world, infrastructure has become more critical than ever. Beyond the traditional infrastructure elements—such as ports, transport (rail, pipeline, and road), and civil and mechanical systems that have existed for many years—society has adopted a transformative approach to the development, implementation, and management of these assets.
In infrastructure project finance, a trained engineer or developer would spot a critical piece of infrastructure around every corner. A well-versed banker would spot an infrastructure funding opportunity in every article on his/her news feed. For laypeople, however, identifying with these critical pieces of “kit” or “assets” or “the things that help us all” is not always as easy.
Think about the following questions:
The answers to the above can always be related to infrastructure. To ensure that we have enough of “the things that help us all,” the world has adopted a specific way of developing them: planning and implementing projects.
A project can be defined as “an individual or collaborative enterprise that is carefully planned to achieve a particular aim”.
In its simplest form, the development and implementation of an infrastructure set relate directly back to the definition of a project: People, Organisations and Regulatory Bodies (such as Governments) collaborate to plan and implement a project to achieve a specific outcome, establishing the infrastructure.
Not only has our society adopted a specific method for ensuring the rollout of critical infrastructure, but we also have a unique method for funding it, called project finance.
Project finance focuses on individual projects. It is differentiated from traditional corporate finance in that it aims to fund the project, instead of a business, in a way that suits the risks and circumstances accompanying it.
Project finance follows a specific set of underlying rules or “elements” that must be implemented to work effectively. This piece aims to educate the reader on these elements and to better understand and apply this to future projects.
Infrastructure project finance is predominantly ring-fenced in a separate legal entity, commonly referred to as a Special Purpose Vehicle (SPV), established for project implementation.
This enables separation between the project (its finance) and external variables that may affect it further down the line. In other words, project finance is raised and intended for a specific project, and ring-fencing ensures the specific allocation and usage of funds for the project’s implementation only.
These parties consist of a mix of the following players, all of which end up having vested interests (through the way of shareholding or contract holding) in the project:
Sponsors are individuals, organisations or a combination of the two that originate and drive project development. They often start a project’s development process and are mainly the “jockeys” backed to make it successful.
This comprises a combination of Engineers, Built Environment Professionals, EPC and/or Construction Contractors. These parties are engaged throughout the Project’s development process to identify capital expenditures and implementation costs. All contractors are tied in based on contracts that are developed to incorporate the various areas of implementation and construction. These contracts can often be a deal killer in the project finance world, as details of funder requirements may be overlooked.
Equipment suppliers also play a big role during a project’s development and “construction” phases. They contribute their equipment in exchange for an economic benefit, which adds to the project’s capital expenditure. Solid contracts, which fall in line with funder requirements, should always be put into place for the supply of equipment, with specific attention given to items such as lead times on orders placed, bonds and guarantees required and possibilities of the vendor.
These contractors usually start delivering their services once the construction or implementation of a project has been finalised. They participate in ensuring the operations of the project are performed and may include services such as maintenance, the supply of operational capability and resources, logistical management and maintenance, etc. Again, funders usually focus on the contracts for these guys to evaluate the overall bankability of the project.
Although the main players in a project finance environment have been listed above, SPVs often incur expenses for the services of various consultants for successful development. These may include environmental-, legal-, financial- and other advisors, insurance brokers and companies, logistical partners, clearing agents, etc. These are the essential service delivery agents required to stitch together the main elements for project finance to succeed.
Stability and supply security contribute to the effectiveness of a project, and obtaining supply at the right price and terms will almost certainly boost the project’s bottom line. Supply can take various forms; it can be the fuel which is stored and transported through a tank farm, grain which takes up capacity in a silo, electricity and fibre optic connectivity to a data centre or water, yeast, grain and hops into a brewery.
As supply is a key element in the optimal functioning of a project, financiers emphasise the terms, practicalities and circumstances surrounding supply (in the form of supply agreements) in the project. Supply is a key element not only for the implementation and operation of a successful project but also for obtaining project finance.
Any business functions on revenue generated. In a project environment, revenue is derived from an off-taker. This can take the form of a tenant paying to utilise office space, a client paying to transport gas through a pipeline, or even a farmer leasing hydroponic planting space. Without an off-take/rs, no revenue will be derived. Thus, without an off-take/rs, required returns, expected for funding provided, will not see the light of day.
Project finance generally leverages off-take (viewed in conjunction with the free cash flow generation capability that originates from it) as a pillar for the serviceability of required returns. It is often the starting point of any project evaluation by a project financier, and the terms surrounding the off-take (and thus the flow of cash) often drive the investment decision.
Any legitimate business is governed by legislation, rules and regulations. Whether enforced by the government, local or international agencies, associations or other third parties, laws and regulations significantly impact a business’s operations. A project is no different. Compliance with laws and regulations is a must for the optimal functioning of any project. Even more so, with infrastructure Projects, compliance with environmental laws and regulations has become very topical nowadays.
Infrastructure often impacts the environment. Generally, governments and international associations have specific rules and regulations to help protect the environment, which are continuously enforced. In most instances, authorisation is required from specific bodies to implement infrastructure projects in specific areas. For this, project owners or sponsors need to do environmental impact assessments before implementing their projects to satisfy the relevant bodies and ensure that their projects will not detrimentally affect the environment.
Furthermore, other laws and legislation may significantly impact projects. Think anti-money laundering legislation, anti-competitive behaviour prohibitive legislation, tax legislation, trade legislation, stock exchange legislation, banking and credit regulatory legislation, etc.
Very often, project financiers commit to complying with relevant legislation. If they do not, they may be at risk of fines, penalties and possible retraction of committed funds from underlying investors. Compliance with relevant laws and legislation is thus a crucial element in successfully implementing projects and raising project finance.
Any business needs to be covered in the event of things going wrong. This principle applies throughout a Project Finance environment. Essential mitigation against risks that can’t be hedged on a natural or operational basis can, in most circumstances, only be implemented through insuring against losses that arise from circumstances that are out of the control of project owners. Similarly, project Financiers often require security or insurance for project investments. This protects them against unforeseen circumstances that may lead to the required returns on investment not being realised.
These types of loss inhibitors or protection can take various forms, depending on the nature of the Project. Physical security usually takes the front stage in a Project Financier’s books (as with any other funder). Thus, if you put up your owned assets (physical and non-physical) as security against non-settlement of required returns, your Project is more de-risked in a project funder’s eyes.
The aim of project finance, however, is to see whether the risks related to a project can’t be successfully mitigated through alternative forms of security. Normal insurance practices often play a big role in mitigation, i.e., insurance against theft, bad debts, etc. In more complicated circumstances, insurance for cross-border transactions (export credit insurance), the cession of income and off-take agreements, performance and operational guarantees and hedges can be put into place to bring investment-associated risks down to an acceptable level. These services and instruments usually require input from specialised service providers who understand the intricacies around them.
An array of funders exist in the project finance world. Normally, project finance consists of a combination of efforts from these funders. In general, debt and equity funders join forces to make project finance dynamics work. This means that one would usually encounter two different main kinds of funders in a project finance environment: equity funders, who buy a stake in the shares of the project (usually through acquiring an equity stake or share in the SPV), and debt funders, who borrow funds into the Project and its operations in exchange for repayments.
The main difference between these two is that equity funders take on more risk. This is because they stand behind debt providers when it comes to waiting in line for required returns. I.e., debt providers borrow funds into the project (usually through the SPV), have specific rates of return (interest rates and cost of debt) and usually link these returns to specific events or timelines. They get preference above any other project creditors and often take up all of the security available from the Project.
Equity providers, on the other hand, invest in the project’s share capital (or SPV) and share in the profits generated by the project. Their returns are less guaranteed than debt providers but often more lucrative if a project works. The simple economic principle of risk and return is often clear when these two kinds of funders, the risks they take and the returns achieved, are weighed against each other.
These funders use various financial instruments to structure and implement project finance, tailoring these tools to suit specific projects. Instruments such as preference shares, ratchets, and mezzanine/hybrid financing can impact the returns generated for Project financiers, which is why project finance dynamics often vary significantly across projects. These strategies help mitigate investment risks uniquely for each project, enabling effective funding across different project types.
The above elements are key considerations when developing a Project to secure project finance. While much more can be said about each element, its effects and impacts can vary depending on the specific project. Nevertheless, project owners or sponsors who rigorously address each of these elements are more likely to succeed in raising project finance provided that the project is fundamentally sound.
Read more on the EPCM topic here.
In this guideline, we take you through everything you need to know about the SPM calm Buoy System.
A Single Point Mooring (SPM) Calm Buoy System is an offshore mooring point used to facilitate tankers loading or discharging various forms of liquid product cargo near onshore storage or production fields.
There are various types and configurations of SPMs used in different locations and for different purposes, such as Turret Buoys, Single Anchor Leg Mooring (SALM), Single Point Mooring Towers, Spars, and Articulated platforms.
This article will only focus on theSPM Catenary Anchor Leg Mooring (CALM). Also, commonly called Single Buoy Mooring (SBM) – although this is technically referred to as a proprietary name. We will use the term interchangeably throughout.
The SPM CALM philosophy consists of a tanker mooring securely to a single buoy in open waters offshore. After which the free ends of floating hoses connected to the buoy are connected to the tanker, and product is pumped through the hoses, buoy, subsea risers, manifolds and subsea pipeline. Either from the tanker to onshore storage or vice versa, depending on whether it is an import or export facility.
These buoys can be designed and fabricated to handle large-capacity tankers, including very large crude carriers (VLCCs).
The SPM calm buoy system is typically used nearshore to eliminate the need for larger marine mooring infrastructure, such as ports, jetties, and marine loading arms. It also offers an improvement over the fixed-position Multiple Buoy Mooring (MBM) methods, in which tankers are typically more adversely affected by wind and wave loads.
SPM calm buoy systems are also used further offshore, in deep waters, to facilitate the transfer of product between floating production facilities and tankers. In these instances, the buoys have a different design and are moored in place with composite legs, often containing high-tech synthetic materials and steel wire rope.
The owners and operators of SPM systems should adhere to a special offshore operation standard, established by the Oil Companies International Marine Forum (OCIMF).

Figure 1: Tanker moored to an SPM CALM buoy with mooring hawser arrangements, and floating hoses connected to the midship manifold
SPM CALM buoy systems are most effective where conventional marine terminals are either impractical or economically inefficient. They are commonly selected when shoreline access is constrained, environmental permitting for jetties is complex, or rapid project execution is required.
Ideal use cases include locations with limited natural harbour protection, where dredging volumes would be excessive for a fixed jetty, or where seabed conditions allow reliable anchoring but do not favour piled marine structures. CALM buoys are also well suited to remote sites with limited construction infrastructure, where offshore installation using marine spreads is simpler than onshore heavy civil works.
They are particularly attractive for import terminals that require flexibility in tanker size, as well as for export facilities tied to floating production units or offshore pipelines. When metocean conditions are moderate and predictable, CALM systems offer high operational availability at a lower capital investment than traditional berths.
However, CALM buoys are not suitable for all environments.
Locations exposed to long-period ocean swell, strong cross-currents, or highly variable wave climates can experience excessive tanker motions and reduced operating windows. Very shallow water sites may not provide sufficient under-keel clearance for large tankers, while congested shipping lanes can complicate safe approach and exclusion zone management.
Poor seabed conditions can also be a limiting factor. If the anchor holding capacity is inadequate and alternative solutions, such as suction piles or driven foundations, are not feasible, the overall system reliability can be compromised.
For these reasons, early metocean studies, geotechnical investigations, and marine traffic risk assessments are critical in determining whether a CALM buoy solution is technically and operationally viable.
Since their introduction, SPMs have facilitated economies of speed and scale in the international transport of petroleum. As the market for these SPM systems developed rapidly, N.V. Industrieele Handels Combinatie Holland (IHC) decided in 1969 to create a separate business to market and further develop the products, called Single Buoy Moorings Inc. (SBM). Their success has become eponymous: SPM CALM types are now common but are technically incorrectly referred to as SBM (Single Buoy Mooring).
The history of single-point mooring in the oil and gas industry started in the late fifties with loading/ discharging terminals using single-point mooring systems. In particular with:
An empty or fully loaded tanker approaches the SPM and moors to it using a hawser arrangement with the help of a mooring crew. The floating hose strings, attached to the SPM buoy, are then hoisted and connected to the tanker manifold. This creates a fully closed product transfer system from the tanker hold, through the various interlinked components, to the onshore buffer storage tanks.
Once the tanker is moored and the floating hose strings are connected, it is ready to load or discharge its cargo, using either the onshore pumps or the tanker’s pumps, depending on the direction of flow. As long as the operational cast-off criteria (i.e. when the environmental conditions are too rough – see table at end of the article) are not exceeded, the tanker can stay connected to the SPM and floating hose strings, and the flow of product can continue uninterrupted.
During this process,s the tanker is free to weathervane around the SPM, meaning it can move freely throughout 360 degrees around the buoy, always orienting itself to take the most favourable position in relation to the combination of wind, current, and wave climate. This reduces the mooring forces compared to a fixed-position mooring. The worst weather hits the bow rather than the side of the tanker, reducing operational downtime from excessive tanker movements. The product swivels inside the buoy, keeping it flowing through the buoy as the tanker weathervanes.
This type of mooring requires less room than a tanker at anchor because the pivot point is much closer to the tanker – typically 30m to 90m. A tanker at a mooring buoy is much less prone to fishtailing than a ship at anchor, although fishtailing oscillations can still occur at a single-point mooring
The following three steps explain the process in more detail:
Every SPM CALM buoy operates within a defined operational envelope. This envelope represents the environmental and mechanical limits within which a tanker can safely approach, moor, remain connected, and transfer product.
The primary factors that define this envelope are wind speed and direction, significant wave height and swell period, surface and subsurface current velocity, visibility conditions, tugboat bollard pull capacity, and the allowable working loads of the mooring hawsers and anchor system. In addition, tanker-specific limitations such as bow thruster capability, engine response time, and manoeuvrability also influence safe operating limits.
Operational limits are not defined by a single parameter alone. A moderate wave height combined with strong cross-current and limited tug power may create a higher risk than a higher wave height under favourable alignment. For this reason, operational criteria are normally established using combined metocean thresholds rather than individual values.
Cast-off criteria define the environmental or operational conditions at which product transfer must be stopped and the tanker disconnected from the SPM. In practice, this is the point at which continued connection would increase the risk of excessive mooring loads, hose overstressing, or loss of vessel control.
Typical cast-off triggers include rapidly rising wind speeds, increasing swell approaching hose or hawser design limits, abnormal tanker movement behaviour, tug capability being exceeded, or loss of critical systems such as power, steering, or communications. These limits are defined during the design phase and formalised in terminal operating procedures.
Clear definition and strict enforcement of operational and cast-off criteria are critical for safe SPM operations. Delayed disconnection decisions are a common contributing factor in offshore mooring incidents.
At first light, the pilot and mooring team would board a launch (smaller support tanker) and depart out to the waiting tanker at a close anchorage location. The team and tool basket are transferred on board, and as the pilot gets the tanker underway, the mooring crew will prepare their tools and equipment for the connection. Sometimes the pilot and mooring crew will be transferred to the tanker by helicopter, depending on the area, risk and operational need.
During mooring manoeuvres, the tanker will approach the buoy into the prevailing environmental conditions, ensuring maximum control while minimising the need for constant tugboat assistance. Although a tugboat must always be available in case the weather deteriorates, the tanker has a mechanical breakdown or any event requiring assistance. The tanker can cause significant damage to the SPM Buoy, even with minor contact. Likewise, a tanker that drifts from an SPM can quickly end up on the beach, as it takes quite some time to get the engines ready.
As the pilot slowly brings the tanker to the buoy, its crew will pass down a smaller messenger line to the launch, which is run towards the SPM mooring hawser. When close enough, the launch crew will connect the messenger to the mooring hawser pickup rope and the tanker will moor bow to the buoy by means of one or two mooring hawsers hauled in by the tanker crew. The tanker holds on to a chafe chain at the end of each mooring hawser.
During mooring, the tug will help keep the floating hoses clear of the tanker’s bow.
After passing the hose pickup ropes to the tanker team, the tug moves to the tanker’s stern, where its towing wire is connected. The tug will static-tow (the term for a tug towing a tanker moored onto an SPM) away from the buoy under the direction of the mooring master on the tanker. This maintains the nominal tension on the mooring hawsers to prevent contact between the tanker and the buoy structure, as the tanker’s response time is often substantially slower than the rapid change in weather direction.
The constant tension on the mooring hawser also reduces wear and tear on the mooring hawser components and the SPM main bearing, and assists with the weathervaning of the tanker.
The SPM operates in an exclusion zone around the buoy, with the radius of this zone consisting of the sum of the length of the mooring hawser + tanker + static-tow line + tugboat + safety distance behind the tug.
Mooring and unmooring operations are quick, and oftentimes all connection points are equipped with quick-release mechanisms (not to be confused with quick-release hooks).
Once the tanker is securely moored, and before connecting floating hoses, a formal safety and operational readiness check is normally performed. This step is critical to ensure all parties are aligned and that the system is prepared for controlled product transfer.
Clear communication links must be established between the mooring master on board the tanker, the pilot, the tug master, and the terminal control room. Agreed handover points, emergency signals, and primary and backup communication channels should be confirmed before proceeding.
The exclusion zone around the SPM buoy must be actively enforced. No unauthorised vessels should be permitted inside this zone during hose handling or cargo operations. Support craft must maintain agreed stand-off distances and remain clear of mooring lines, hose bights, and anchor leg footprints.
All quick-release arrangements should be verified as operational. This includes mooring hawser release systems, hose emergency-release couplings, where installed, and emergency shutdown valves at the PLEM, buoy, and terminal. Functional testing of shutdown logic and confirmation of valve status are typically part of pre-transfer checklists.
Operational incidents during SPM operations most commonly arise from a small number of recurring causes. These include floating hose strings snagging or misaligning during pickup, tug towing-line failures or incorrect tow angles, sudden weather shifts exceeding forecast conditions, and delayed tanker engine readiness during emergency manoeuvres.
Strict adherence to pre-transfer checklists and conservative operational decision-making significantly reduces the likelihood of escalation once product flow has commenced.
Once securely moored to the SPM, the free ends of the floating hose strings are pulled around to midship and hoisted up by the tanker’s crane or derrick and connected to the tanker’s midship manifold. This establishes a closed product transfer system from the tanker to onshore storage. Manifold connections are usually flanged, and their installation can be expedited with a cam-lock system. In some cases, where a specific tanker is the only tanker to visit a particular SPM, they may even install an engineered cargo coupling solution,s which makes the connection task almost autonomous.
With the hoses connected and the necessary valves on the Pipeline End Manifold (PLEM) and Buoy open (hydraulically or manual by maintenance crew/divers prior to tanker calling) the product is then transferred either to or from the tanker, depending on whether the tanker is loading or discharging.
Once the transfer is complete, the line should still be filled with product. This remaining product is then either pushed out with the next product transfer, with the receiving end handling the product interface slug, or separated with an interface pig.
Sometimes the product is also pushed out with treated seawater. The filtered, treated seawater is chemically treated with a biocide, an oxy-scavenger, and a corrosion inhibitor, and filtered to remove all particles down to 50 microns.
In general, SPM CALM buoys cannot be pigged through the whole system due to the swivel mechanism in the buoy. However, there are examples of complete pigging of the system through the SPM and pipelines. Mostly, the pig will have to be inserted at the tank farm and received at the PLEM. In some oil SPMs with two pipelines,s the pig is pushed through one pipeline via the PLEM and back to the tank farm via the other pipeline.
Once loading or discharging is complete, the above mooring tasks will be reversed, and the tanker will be free to proceed, subject to formalities such as cargo acceptance and a few other quality and procedural checks.
Below – This SPM was converted into a mooring point only for a unique offshore bulk cargo transfer operation, where smaller Panama-sized trans-shippers fed the bulk carrier via an STS mooring arrangement.
This video serves only to show the SPM approach and mooring, not any cargo handling – liquid or bulk
Although suppliers each design their own buoys with various pros and cons, SPM CALM Buoys come mainly in two variations:
The difference between them is that, in the case of the turntable, the anchor legs are connected to the buoy, and the turntable atop it turns around. With the turret, the anchor-legs are connected to a spider turret arrangement below the water (which typically has no buoyancy), and the buoy that sits on the spider turret can rotate around.
Both have advantages and are commonly used. See below for some key advantages of both.
The SPM buoy, regardless of turret or turntable arrangement, has two primary functions:
The main bearing is the pivot around which the static and rotating components turn. The load of the anchors holding on the seabed and the tanker pulling in the current are borne by the main bearing. Typically, the bearings are slow-rotating slew bearings with multi-race cylindrical rollers, similar to the ones you will find in a large construction crane.
The bearing is robust, but a failure will require dry-docking the SPM, with possible bearing replacement and all associated work.
This is not to be confused with the Product Bearing, also known as the Product Swivel (see further below)
Holding the tanker to the buoy is an incredibly durable, high-strength synthetic fibre nylon rope capable of withstanding the enormous forces of moored VLCCs, sometimes over 1,000 metric tons. This mooring arrangement is called a Mooring Hawser.
These synthetic fibre ropes are manufactured by only a handful of companies worldwide in near-sterile conditions. Manufacturing is guided by international best practices, with ongoing input from end users, SPM operators, oil majors, and contractors to ensure new data is considered and improvements are implemented.
The hawser arrangement usually consists of nylon rope, which is shackled to an integrated mooring uni-joint on the buoy deck. At the tanker end of the hawser, a chafe chain is connected to prevent damage from the tanker fairlead. A load pin can be applied to the mooring uni-joint on the buoy deck to measure hawser loads.
Hawser systems use either one or two ropes, depending on the largest tonnage of the vessel, which would be moored to the buoy. The ropes would be either single-leg or grommet-leg type. These are usually connected to an OCIMF chafe chain on the tanker side (type A or B, depending on the tanker’s maximum tonnage and mooring loads). This chafe chain would then be held in the chain stopper on board the tanker.
A basic hawser system would consist of the following (working from the buoy outwards):
Buoy-side shackle and bridle assembly for connection to the pad eye on the buoy; Mooring hawser shackle; Mooring hawser; Chafe chain assembly; Support buoy; Pick-up/messenger lines; Marker buoy for retrieval from the water.
Under OCIMF recommendations, the hawser arrangement would normally be purchased as a full assembly from a manufacturer.
The mooring hawser is a single point of failure for the SPM CALM system, and the quality of the hawser is crucial, considering the consequences of failure if a fully loaded VLCC breaks from its mooring.
Mooring hawsers typically last up to 2000 hours of use (tanker moored to the SPM) before replacement is needed. This is because every time the mooring hawser undergoes tension, there is internal friction that wears the rope down and places a limit on its operational lifespan.
In order to prolong the hawser’s life, operators will often remove the ropes from the SPM during extended periods of disuse. Exposure to UV, saltwater, wave movement, and getting tangled around the buoy are all factors that would prematurely age the rope.
The buoy is secured to the seafloor and held in position by an array of anchor chains and a seabed anchoring system. The anchor chains will take the shape of catenaries, from where the name of this buoy arrangement, Catenary Anchor Leg Mooring (CALM).
The principles of anchoring a ship remain the same when employed under an SPM. There is a subtle change, though, as your anchor needs to hold the buoy in a local, specific position so as not to over-tension the subsea hoses. It also has to be able to hold the tanker with a tug boat hanging off the stern. To do so, SPMs are held in position utilising multiple anchor points. They terminate in a suitable type based on local soil conditions and the required holding force.
Typical type conventional anchors used in SPM moorings are drag or plate anchors. Where this is not suitable or economical, then driven piles, concrete blocks or suction pile anchors can be used.
Between the Anchor Points described and the SPM Buoy itself are the anchor legs. In shallow waters up to 150m, they typically consist of marine or offshore-grade stud-link chain, similar to that used in large tanker anchors or floating oil rig chains.
The forces required to keep the buoy in position increase with water depth; therefore, larger and heavier chains are needed. In deep-water systems, the size increase would be impractical, so composite-material legs are used. This may contain any combination of Dyneema ropes, steel wire ropes, stud link chain, etc.
Dyneema is a UHMWPE (Ultra High Molecular weight Polyethene) or HMPE (High Modulus Polyethene) fibre developed by DSM in the Netherlands some 30 years ago. Known as the world’s strongest, lightest fibre – 15 times stronger than steel, yet floats on water.
For shallow water SPMs, you will typically find 200m to 400m long anchor chains. The design should account for the buoy remaining in place solely on the weight of the mooring chains, and the anchor points should keep the chain endpoint in place.

The figure above shows a typical Stevshark-type anchor used in CALM Buoy systems
The mooring and anchoring system of an SPM CALM buoy is continuously exposed to cyclic loading, saltwater immersion, UV radiation, and abrasive contact. Most failures do not occur suddenly, but develop gradually through progressive degradation mechanisms.
Mooring hawsers primarily degrade due to internal fibre abrasion and heat generation during cyclic tensioning. Each load cycle causes microscopic fibre movement inside the rope structure, which produces frictional heating and a gradual loss of tensile strength. External wear at fairleads and chafe points further accelerates deterioration. Chafe chains are subject to localised wear at contact points with tanker chain stoppers and buoy pad eyes, where repeated movement can lead to ovalisation and material loss.
Anchor chains experience their highest wear rates at fairlead interfaces and seabed touchdown zones. At these locations, chains are exposed to combined bending, tension, and abrasion against steel surfaces or seabed material. Over time, this leads to section loss, corrosion pitting, and elongation of individual links. In high-energy environments, chain twist and uneven loading between anchor legs can further accelerate fatigue damage.
Main bearing and swivel assemblies are sensitive to lubrication quality and water ingress. Loss of lubrication film thickness increases metal-to-metal contact and accelerates raceway wear. Water ingress can cause corrosion of bearing components and seal degradation, compromising both structural integrity and product containment.
Routine inspections focus on identifying early indicators of these degradation mechanisms. Typical inspection findings include external abrasion on synthetic hawsers, broken or fused fibres, corrosion pits on chain links, deformation or flattening of links at high-load zones, coating breakdown on steel components, and abnormal grease contamination in bearing systems. Early detection allows targeted maintenance and component replacement before operational limits are exceeded.
The fluid transfer system includes, proceeding from the tanker manifold to the onshore storage:
Reliable product transfer through an SPM CALM system depends not only on mechanical integrity but also on effective flow-assurance practices. These measures ensure that fluids move through the system safely, predictably, and without creating conditions that could damage equipment or contaminate product.
Flushing is a critical part of offshore transfer operations. After cargo operations, residual product remains in hoses and pipelines. If left unmanaged, this can lead to product degradation, internal corrosion, wax deposition in crude systems, or cross-contamination between different cargo grades. For this reason, systems are designed to allow flushing using water, displacement fluids, or the following cargo batch. Proper flushing also reduces the risk of stagnant zones forming inside low points of the system.
Interface management becomes important when transferring multiple products through the same infrastructure. The interface slug between different products must be controlled and accounted for to prevent the delivery of off-spec cargo. Terminals typically manage this by directing interface volumes into dedicated slop tanks, blending systems, or controlled disposal routes. Accurate volume tracking and flow metering are essential to minimise losses and contamination.
Surge pressure events represent one of the highest mechanical risks to hose and piping systems. Rapid valve closures, pump trips, or emergency shutdown activations can generate transient pressure spikes that exceed steady-state design loads. To mitigate this risk, valve closure times are carefully engineered, and surge analysis is performed during the design phase. In some systems, pressure relief devices or controlled ramp-down procedures are incorporated into operating protocols.
Pigging through an SPM system is inherently limited by swivel assemblies and complex buoy-piping geometries. As a result, operators typically pig only the subsea pipeline section between the tank farm and the PLEM. Product remaining in hoses and buoy piping is managed through flushing, displacement, and controlled drainage procedures rather than full mechanical pigging.
Effective flow assurance planning reduces unplanned downtime, limits product losses, and extends the service life of hoses, seals, and internal piping components.
Floating hoses transfer the fluid product from the tanker manifold to the SPM. They are permanently connected to the buoy at one end. The loose end is picked up by the tanker crane/ derrick and connected to the tanker’s midship manifold during operation. The loose ends are not tied back to the buoy between operations but float freely.
Each hose string consists of many individual hoses (typically 9m to 12m in length) flanged together to form a string of adequate length for operations, taking into account the buoy design, metocean conditions, and the size of tankers visiting the SPM. String lengths are typically from 150m to 250m, but they can be made up to any required length. Usually, an SPM has connections available for 2 floating hose strings, but it can have fewer or more.
During operation, the hose strings need to float and stream in a specific bight, as shown in the opening SPM image next to the tanker, and an incorrect-length hose string will have undesirable consequences.
The hose strings need to be leak-free, flexible, positively buoyant, and robust for harsh open-sea conditions. Like the mooring hawser, hoses are subject to strict international standards and requirements for manufacturing and operational use. Typically, they yield 3 to 5 years of fluid transfer, but it is not uncommon to see end users extend this by a year or two. Although the hoses will come with usage and lifespan recommendations from the OEM.
When storing flexible hoses, it’s crucial not to leave them in the sun, as UV light can cause deterioration.
Product handling through the buoy involves piping similar to that found in any tank farm or liquid plant. There are elbows, spools, expansion joints, floating flanges, valves, etc.
However, one unique component of these buoys is the product swivel, which allows the system to weathervane while the product is flowing. This is also called a Product Bearing and has multiple seals between the inner and outer races to prevent product from seeping into the bearing or out.
Some buoys have a complicated bearing called Multiple Product Distribution Unit (MPDU), which, as the name suggests, allows simultaneous pumping of different products without intermixing.
The flexible marine subsea hose risers connect the underside of the buoy to the PLEM. They are installed in a few basic configurations, all designed to accommodate tidal depth variations and lateral displacement caused by mooring loads. In all cases, the hose curvature changes to accommodate lateral and vertical movement of the buoy within an acceptable footprint, while the hoses are supported at near-neutral buoyancy by floats along their length.
Some common subsea hose string arrangements:

The image above shows a Steep-S riser arrangement, along with the PLEM and its frame.
On deepwater buoys (typically deeper than 60m), risers are often used instead of subsea hoses. They are lighter and have a different lifespan than the flexible marine hoses.
These subsea hose risers are installed and changed out by divers. To save on mobilisation and expenses, operators and owners will often have their subcontractors perform a complete service of the buoy, including all flexible hoses and other wet components in one project. This may sometimes fall within the scheduled dry-docking of the buoy itself.
Marine Breakaway Couplings (MBCs) provide an identifiable safety fuse/separation point for inflexible parts of offshore fluid transfer systems. Commonly, in the floating hose string, but there are instances of them deployed in the subsea hose/ risers.
When the flexible hose string experience undue pre-determined tensile loads or a surge inflow the MBCs automatically activate; shuts down product flow and separates the hose string or riser. This activation relieves tension and pressure in the transfer hose system before it ruptures. In the event of such a breakout, the device will operate without any outside intervention by personnel or the system.
Events such as tanker movement, loss of Dynamic Positioning (DP), storms and pressure surge (such as an inadvertent downstream valve closure elsewhere in the system) could compromise hose transfer systems, and MBCs minimise risks in offshore liquid transfers. Such as product loss, asset damage, environmental contamination, workforce injuries, and extended downtime.
The MBC consists of flanged ends of the same size and classification as the hose in which it serves. It is assembled from two pieces, held together with calibrated bolts that will only separate within a specific pre-set range of tension. The mechanisms with which this MBC valve closes are either flaps (similar to a butterfly valve) or petals that will close with the aid of flowing product.
The PLEM facilitates the subsea termination of the pipeline and the connection to the marine hoses. A PLEM comprises a structural base supporting a piping manifold. The PLEM base structure is secured to the seabed as a gravity base (being heavy, or weighted down with concrete or chains), but may also be piled, depending on the soil, loads and installation preferences. Perimeter skirts can improve lateral stability and provide scour protection, especially in sandy seabed conditions. Typical PLEM footprint dimensions range from about 3×5 to 8×10 metres. The PLEM height should be kept to a minimum in shallow-water areas to ensure maximum clearance for passing tankers and other marine traffic. Although in the case of an SPM, this is less of an issue as the PLEM sits directly underneath the buoy and, theoretically, should not see overhead marine traffic. A protection frame is fitted over the manifold to protect the piping from falling objects or fouling ropes.
The PLEM design should be compatible with the pipeline size, pipeline class and the hose configuration. The PLEM should be designed in accordance with relevant structural, mechanical and geotechnical design codes. The pipeline end anchorage could be achieved using gravity anchors. Where the seabed has a deep layer of mud, a piled foundation may be required to support the pipeline above the mudline.
In its simplest form, the PLEM may consist of a valve, preferably a ball valve, a spool piece incorporating a water injection point, and a hose connection flange. More sophisticated systems may incorporate pigging facilities, remotely operated valves, multiple hose connections and emergency shutdown functions. Where surge pressure and the setting of the appropriate valve closure times.
Whatever the design, a method for flushing the hoses before removal for routine inspection and testing should be provided. It is preferable to clear the hoses by injecting water at the system’s low point, and the PLEM design should accommodate this requirement. Sufficient rigging points and pad eyes should also be provided on the PLEM to facilitate hose installation.
The PLEM design should account for pipeline and hose flange loads arising from operational conditions and any credible accidental conditions. The PLEM should also be able to accommodate the expansion from long subsea pipes’ thermal expansion.
The PLEM design shall facilitate the subsea termination of the pipeline and the connection to the subsea hose risers.
Corrosion protection to the PLEM is usually provided through a coating system supplemented with sacrificial anodes.
The PLEM piping may include branches to connect multiple hoses with diameters smaller than the pipeline. The hose connections should be angled to provide a favourable alignment for the hose excursion when connected to the buoy. The PLEM piping should include valves to facilitate replacement of the subsea hose risers and may be configured to connect a pig receiver/launcher to facilitate pipeline pigging.
The PLEM branch lines may also incorporate small-diameter connections to facilitate flushing of the submarine hoses.
Figure: Typical PLEM Layout
Operators have a few ways to operate the PLEM Valves:
Apart from the major items listed above, the SPM has many smaller, but essential, ancillary items needed for efficient operations:
As a result of the advantageous aspects described above, both the operational and maintenance costs of the turret buoy are substantially lower than for turntable buoys. More important to the user is the greater reliability and higher availability of the turret buoy system, thereby reducing costs for demurrage and delays in fluid transfer.
The advantages of the Turntable system may seem limited, but that does not mean a Turret is a better solution. There are many factors that go into selecting a suitable buoy type and supplier.
Selecting between a turret or turntable CALM buoy and defining the overall system configuration is not driven by a single technical factor. It is the result of balancing environmental conditions, operational philosophy, risk tolerance, and lifecycle cost.
Key criteria typically considered during concept selection include:
A structured multi-criteria evaluation during early project phases is essential to avoid selecting a buoy configuration that is technically feasible but operationally suboptimal.
The total downtime (when the tanker cannot moor, load, or discharge product) of an SPM needs to be assessed to determine the feasibility of this type of infrastructure. If it exceeds the facility’s capacity, another solution or location might be needed.
The maximum downtime a facility can tolerate depends on the number of berths per year required to meet the minimum needed operational throughput. Ideally, you want a storage facility that can be turned over three times a month to operate efficiently. However, many facilities need far fewer transfers.
To determine this downtime, the following basic steps are needed
Hurricane/Cyclone modelling needs to be done separately, depending on the facility’s location, to determine the impact on operations.
An SPM CALM system is exposed to some of the harshest open sea conditions. Maintenance of the system is crucial to ensure continued, smooth, efficient, and controlled-risk operations.
The full spectrum of the maintenance of SPM CALM systems is guided by the Single Point Mooring Maintenance and Operations Guide, 3rd Edition (SMOG).
The maintenance crew (often a band of divers) will undertake tasks such as closing subsea valves, inspecting and removing subsea hoses, and removing mooring hawsers. They will grease bearings, clean solar panels, check batteries, cycle deck-valves, and remove flaking rust and touch up with new paint.
SPM CALM buoys operate without permanent human occupancy, and with no electricity or fresh water, they get damaged by the severe elements. It is needed to wash the entire buoy with fresh water as often as is possible.
Periodic diving maintenance is also carried out through inspections. With the various levels of checking details for daily, weekly, monthly, etc., inspections. This will be laid out in an approved maintenance and inspection plan developed by the Operators and Client.
Typical activities during inspections would include inspecting and reporting on wear on anchor chains and replacing anodes. For major maintenance, you would look to replace subsea and floating hoses every 3 to 5 years.
When SPM buoys receive the prescribed OEM maintenance and the owner/operator’s additional points of care, they can achieve a 30-year service life with ease.
Depending on Classification Society and Insurance requirements, the SPM would need to be dry-docked periodically. Typically, this is once every 5 to 10 years. In special cases, permission may be granted for UWIILD (Underwater Inspection In Lieu of Drydock). This exercise can include a major overhaul of the bearing and product swivel, replacing the winch and ancillary gear, and blasting, followed by a fresh coat of paint.
Because the buoy shares many characteristics with tankers at sea, it is managed as strictly as any other tanker in the Oil and Gas fleet. Classification societies such as Bureau Veritas, the American Bureau of Shipping, and Lloyd’s Register all have guidelines to ensure these buoys are kept in safe condition.
There are three main groups of installation that typically need to take place:
Firstly, the pipeline is installed. This typically involved a shore-crossing section in which the pipeline must be buried below the lowest natural level of the beach and adequately covered to prevent waves from damaging the pipe.
Sometimes the PLEM is installed separately from the pipeline, either by floating it out and sinking it into position or by lifting it from a barge/ support vessel and placing it on the seabed. A diving team would be involved with the PLEM connection or securing.
After this, an anchor-handling tug and marine crew would lay anchors (or jet in piles, depending on the design) and lay down the stud link chains, referred to as anchor legs. These anchor legs would then need to be pre-tensioned by the installation vessel to ensure that all slack is out, the chains are not twisted, and they lie in straight lines from the anchor to the buoy centre position.
The buoy is then installed. Typically, SPM buoys are deployed to the water in the closest harbour, after which they are towed into position by a tugboat. In a process that takes a few days to a week, the anchor legs are pulled into the chain stoppers, and the buoy is moored to the seabed.
The final step would be to use a diving team to install the subsea/floating hoses and ancillary items, such as mooring hawsers and navigation aids.
SPM CALM systems are provided by a handful of OEMs worldwide. Large buoys typically cost between $15m and $20m USD when purchased new.
The following items (material and installation) will typically be priced for an SPM job to determine the CAPEX:
OPEX is linked to the size of tankers calling at the SPM CALM buoy and to the prevailing environmental conditions. A study is conducted to ensure that the support tug boat(s) have sufficient bollard pull and manoeuvring capability to tow the tanker out of trouble in the worst weather conditions expected.
The cost will consist of market rates for a tugboat with sufficient bollard pull, plus consumables (fuel, lubricants, etc.). Pilot and crewing also need to be priced.
If the client is prepared to charter for longer periods, i.e. 10 years, it may be more financially feasible to purchase a dedicated tug.
In early project cost estimates, several supporting cost components associated with SPM CALM buoy developments are frequently underestimated or excluded altogether. Metocean data acquisition, long-term hindcasting, and numerical modelling required to define operational envelopes and downtime expectations can represent a meaningful portion of front-end engineering effort. Regulatory permitting, marine traffic risk assessments, and installation of navigational aids compliant with local authority and IALA requirements are also often treated as secondary considerations despite their potential schedule and cost implications.
Operational readiness planning introduces additional lifecycle costs. Establishing a spare parts strategy for floating hoses, subsea hoses, and mooring hawsers requires upfront capital allocation, particularly given manufacturing lead times and limited global suppliers. Logistics associated with periodic dry docking, including towage, tug availability, port slot access, and lifting arrangements, can also be substantial depending on regional marine infrastructure constraints.
Finally, ongoing inspection and maintenance contracts should not be overlooked. Diver or ROV inspection programmes, classification compliance surveys, and specialised marine support services are recurring operational expenditures that materially influence total cost of ownership. Proper inclusion of these elements during early budgeting improves financial predictability and reduces the likelihood of mid-project scope adjustments.
Despite their widespread use and relatively straightforward visual appearance, SPM CALM buoy systems are often misunderstood. Several recurring misconceptions can lead to unrealistic expectations during early project planning or operations.
One common assumption is that an SPM is simple infrastructure. While the buoy itself appears uncomplicated, safe operation requires coordinated marine logistics, environmental monitoring, specialised equipment maintenance, and strict procedural discipline. The operational complexity is comparable to that of a small offshore terminal rather than a passive mooring point.
Another misconception is that SPMs function effectively in any sea state. In reality, all systems are designed within specific metocean envelopes. Wave height, swell period, wind, and current combinations directly affect tanker motions, hose loads, and mooring forces. Exceeding these limits results in downtime and may require disconnection.
It is also sometimes assumed that tug assistance is optional once a tanker is moored. In practice, tugs play a critical role in maintaining controlled tension, assisting vessel positioning, and providing rapid response capability. Removing or undersizing tug support significantly increases operational risk.
Finally, floating and subsea hoses are occasionally viewed as long-life static components. These systems are consumable assets subject to fatigue, environmental exposure, and internal wear. Their service life is finite and managed through inspection, testing, and scheduled replacement programmes.
Recognising these realities early improves planning accuracy, operational safety, and lifecycle cost forecasting.
| CRITERIA | SPM |
| Tanker size | Tanker sizes unlimited, including the Ultra Large Crude Carriers |
| Operating water depth | 4 to 8 mooring chains (most common are 6-8). On deepwater buoys, you will typically find 9, 12 or 16 |
| Mooring chains | Mooring time (after arriving at the mooring position) |
| Tanker Approach | Can approach from any position – and therefore can choose to approach into prevailing weather conditions |
| The function of tanker storage, pump capacity, line size and distance | Typically 15 min. |
| Hose connection time | Typically 1.0 h |
| Offloading time | Product offloading is possible with wind up to 40 knots and head waves of 3.0 m to 4.5 m |
| Hose disconnection time | Typically 1.0 h |
| Mooring disconnection time | Typically 15 min. |
| Net total time difference with Multi Buoy Mooring | Typically 2.5 h quicker compared to CBM or MBM |
| Mooring conditions | Able to moor with winds up to 30 knots and head waves of 2.0 m to 2.5m |
| Offloading steps | Steam from anchorage, moor, connect hoses, pump product through, disconnect hoses, disconnects mooring, steams away |
| Operating limit | The tanker has to leave the berth with winds of 60 knots and waves higher than 3.5 m to 5.0 m |
| Mooring disconnection | Approximately US $15m to $20m for the SPM CALM buoy alone (excluding installation) |
| Cost | Required for mooring. Tug required full-time during mooring to assist with weathervane movements and to keep tanker from colliding with buoy |
| Tuggage | Required for mooring. Tug required full-time during mooring to assist with weathervane movements and to keep the tanker from colliding with the buoy |
| Under Keel Clearance | The function of the tanker, metocean conditions and local operational guidelines. Must be calculated. |
| Suppliers | Proprietary technology and limited suppliers |
| Track record | Since 1959 successfully installed around the world |
| Weather impact | Less prone to adverse conditions and swell delays than a CBM or MBM |
| Night operations | Possible limitation on night-time mooring depending on local operational, safety and environmental procedures. Can disconnect from moorings 24 h a day |
| Maintenance | Additional complex maintenance activities compared to a CBM or MBM – swivel, bearings, mooring line tensions, classifications, etc. |
Don’t Delegate Like an Engineer! In most engineering project companies, graduate engineers are appointed and groomed to become senior engineers, project managers or even directors. Companies all have different cultures, and this plays a major part in the development of personnel. One of the critical skills that all engineers need to master is delegation.
It’s an unwritten rule in the business world that you would never get promoted from your current management position if you are the only person that can do your job. Thus, you are responsible for preparing other employees to take over from you. Once they are ready to take over from you, you are ready to move up the corporate ladder.
Delegation plays a major role in running any project or business. Engineers or inexperienced project managers often work very long hours and always seem swamped with work. It’s not to say you should not work long hours, but you need to measure how effectively you work during these hours. The only way to get a lot of work done without sitting in the office until midnight every night is to master the art of delegation.
Often, when especially engineers are asked about delegation, they respond with the answer that they would rather do their work and know it correctly than have to fix the delegated work when they receive it back. It might be that this gets drilled into engineers during their education, but it’s a big problem in engineering companies.
Don’t Delegate Like an Engineer! Although it can be very frustrating when the team you delegate to doesn’t deliver, it’s your responsibility to take the extra time you have from delegating work to give feedback and work with your team. When the team members you delegate understand exactly what you need from them, they will improve, and frustration will decrease. It’s important to understand that this is an iterative process and will get better the more times the team works together with constructive feedback.
When reviewing work produced by the team members you delegated to, it’s important to think about the bigger picture. Every person has a different writing style, and it’s in your nature to change every word to match your writing style. You should, however, focus on the outcome or message rather than the writing style. You could give guidance on a better way of writing certain things to help improve the message, but avoid re-writing and changing large sections of the work as it will get you back to not delegating but doing.
Several activities can be delegated, although the common perception is that only deliverables can be delegated. A good example is approvals; you could delegate authority to employees under you to approve them to a certain level, reducing a lot of your workload without increasing the risk if managed correctly. Another example of optimizing your time by delegating is meetings; as a project manager, senior engineer or director, you don’t necessarily need to sit in every meeting or interview. You could delegate most of the meetings to your employees and only be involved when it’s important or have a feedback meeting covering several other meetings.
As a professional engineer, you often have to sign off on certain engineering solutions or reports and take responsibility for it. This process frightens most engineers as the documents often get produced by junior engineers, and you only have a few minutes to look at them before they are issued. Although it’s very important that the professional engineer understands the logic behind the problem and covers himself by doing a few checks, the professional engineer can’t review every single item in detail. This leads to professional engineers not wanting to delegate but rather do all their work themselves. The correct process, however, is to continue to delegate the work but ensure you have the correct checking processes in place before you do the final sign-off. If there is a complex engineering problem, ensure that you have an experienced person look at it before you do the final sign-off. Squat checks and peer review processes also work well to get more eyes on the problems and solutions before they go out the door. This technique can reduce many risks without losing efficiency in the company.
With the latest technological advancements, delegation and outsourcing have become much easier. You could delegate your work to a dedicated person or team in India or China and get an expert in Germany to review the work before you approve the final work. By sharing screens and LinkedIn resources, making use of video calls and meetings, and using cloud-based document storage systems, the whole world is connected and could be part of your team as you need them.
Trust plays a major role in the delegation process, and trust must be established as soon as possible in these teams. Trust, however, does take time to establish, and both the team members producing the delegated work and the person delegating the work should work towards building this relationship. It’s often difficult and risky to delegate a large amount of work to new team members where the trust relationship is not established yet, a good way to get around this is to start with smaller less significant portions and build the trust relationship this way. If the team member performs well with the smaller packages, the size and complexity levels of work increase until a solid trust relationship is built.
Another important part of delegation is communication, which engineers worldwide battle with. The first step is to communicate exactly what you need from the party you are delegating to and ensure you keep the message clear and basic with milestones and deliverables you can measure against. The next step is to ensure that the team member doing the work is meeting his or her milestones without micromanaging them. Thus, set up feedback sessions to ensure the deliverables and milestones are met and communicate any changes or alternations during this session so that everybody understands the direction. Once the task has been completed, ensure you have another communication session to discuss the previous task and lessons learnt during the process.
Micro-management and delegation do not go together. If you plan to delegate a task and then micro-manage the person doing the task for you, you are better off just doing the task on your own. At least when you do it alone, you will only waste one person’s time. Although it might be very hard to let go at first, you must allow the team members you have delegated the work to grow in the process and swim in the deep end while they do it. You should always be there for guidance if they ask, but don’t force yourself and your comments on them, as they will never improve.
In the age we are living in, tasks do not only have to be delegated to humans but can also be delegated to computers and machines. Even automation of certain processes in an office or factory environment is a form of delegation. A good example is when you have a lot of repetitive activities that need to be done, and you write or buy a software program that does this for you. Another good example is Siri or Alexa, which works like a personal assistant and can even book a haircut by phoning the hairdresser and speaking to the receptionist to align schedules and book the appointment. Both Android and Apple have some apps that can be downloaded or even developed to help you delegate and manage your daily tasks. This should be embraced and can greatly improve your efficiency as an individual.
Although most of this article has focused on the person delegating the tasks to other team members, it’s as important for the person doing the work that’s delegated to understand the importance of the relationship and realize that it’s difficult for the person delegating to let go and trust them. It’s up to the person doing the work to show the other party they have it under control. Once the trust is established, it will be a much easier process.
The best way to start delegating effectively is to start doing it and get feedback from the rest of your team members. Once you have received positive or negative feedback, you must embrace it without getting upset and strive to improve it continuously. Before you know it, you will be a great delegator and allow your team and business to achieve greater heights.
Read more about EPCM Culture here.
In coastal infrastructure design, this article discusses key considerations and best practices. Tropical cyclones (hurricanes or typhoons) are among the most catastrophic natural phenomena. These large-scale rotating storms form over the warm waters of tropical oceans and have the potential to produce intense rain and abnormally high winds. The strong winds and associated low atmospheric pressures drive ocean responses, including extreme waves, storm surges, and currents, which can lead to coastal erosion, infrastructure damage, and coastal inundation. This article outlines the challenges faced by engineers tasked with designing coastal infrastructure to withstand such events and presents some best practice approaches for addressing this task.
The first task in designing coastal infrastructure to withstand tropical cyclones is determining the return period for which the event will be designed. The n-year return period event is the event that is expected to occur once every n-year on average. ‘Event’ in this case refers to any parameter which needs to be designed for, e.g. winds, waves, water levels, currents, erosion, forces on piles, etc. While estimating design events is common in many engineering projects, this task is complicated in the case of tropical cyclones largely due to the lack of historical data. Tropical cyclones occur relatively infrequently, and when they do occur, the damaging winds are confined to a relatively small area (generally within 100 km of the eye). The frequency of storms at a given site is typically less than one storm per year, leading to small sample sizes and, consequently, large errors in the extrapolation of the historical records to return periods of interest.
To illustrate this point, consider two hypothetical locations on the Mozambique coastline, as shown in Figure 1. Given the proximity of these two locations, one would expect the true physical risk exposure to tropical cyclones to be similar. However, suppose one simulates the wind fields for all of the shown historical events and carries out an extreme value analysis (EVA) on the modelled winds. In that case, the results are significantly different, as shown in Figure 2. The northern location has, by chance, been exposed to two particularly strong events in the historical record. In contrast, the southerly location happened to be relatively lucky and was ‘missed’ by these events.
Engineers may take a conservative approach when faced with such uncertainty, resulting in over-designing coastal structures. This can have severe consequences on the project’s cost, which may be deemed unfeasible. Alternatively, not taking the risk seriously can lead to the under-design of coastal structures and their consequent premature failure. Probabilistic tropical cyclone risk modelling is a means to reduce the uncertainty associated with quantifying design parameters for these events.

Figure 1: Historical tropical cyclone best track data (1980 – 2012) in the vicinity of two hypothetical project locations on the Mozambique coastline. The colour of the track denotes the intensity of the cyclone.

Figure 2: Extreme value analysis of modelled wind speeds at two hypothetical locations on the Mozambique coastline. The large discrepancy highlights the error induced by small sample sizes of historical data.
The historical records’ inability to provide a robust basis for quantifying extreme tropical cyclone wind speed estimates has led to much research into the development of probabilistic tropical cyclone risk models. These models aim to generate a database of tropical cyclones that is statistically consistent with historical events but has a sufficiently long duration to avoid errors associated with small sample sizes. Figure 3 shows the typical components of probabilistic tropical cyclone risk models. Each of these components is discussed in the following sections.
Figure 3: Overview of typical components of probabilistic tropical cyclone risk models.
Best track data provide the most complete historical record of tropical cyclone activity worldwide and consequently form the most appropriate basis for quantifying tropical cyclone risk exposure. Global best track data from meteorological organisations tracking cyclone activity are available online from the International Best Track Archive for Climate Stewardship (IBTrACS- https://www.ncdc.noaa.gov/ibtracs/). The best track data off southern Mozambique for the period 1980 – 2012 is shown in Figure 1. Although different organisations provide varying levels of detail for each tropical cyclone event, the following data are commonly available at six hourly intervals:
Pc and Vmax are metrics that classify storm intensity and are inversely related through the so-called wind-pressure relationship (WPR). As Pc decreases, the atmospheric pressure gradient driving the winds becomes steeper, increasing Vmax. These metrics for storm intensity are used to classify storms into predefined categories, providing a useful tool for issuing public warnings. Although several classification systems are in use, the one most widely referenced is the Saffir-Simpson scale, as shown in Table 1.
Table 1: Saffir-Simpson scale for categorising storm intensity
Best track data provide estimates of the location of the eye and the intensity of a given tropical cyclone, but rarely does it provide any information on the spatial arrangement of wind speeds around the eye. Generating reasonably realistic tropical cyclone wind fields from best-track data is a vital component of any risk assessment model. Fortunately, the relative uniformity of the intense vortex of a tropical cyclone lends itself to a simplistic parametric representation of the wind field. The basis for all parametric models is estimating a wind speed profile (i.e. the profile from the centre of the eye outwards). Although several parametric wind field models have been proposed, one of the most commonly adopted models is the analytical model proposed by Holland (1980). A promising alternative to the Holland (1980) model is an empirical model that best fits nearly 500 measured wind speed profiles from aircraft reconnaissance data (Willoughby et al., 2006). While details of these models are beyond the scope of this article, Figure 4 provides a comparison of the wind speed profiles of Holland (1980) and Willoughby et al. (2006) for a range of intensities. Note that the radius to maximum wind speed (Rmax) is not always available in best track data and must be estimated using empirical relationships (e.g. Willoughby & Rahn, 2004). Figure 4 highlights the physical phenomenon that higher-intensity tropical cyclones tend to have the highest wind speeds concentrated more locally around the eye. This can be likened to a figure skater drawing in her arms and spinning faster.

Figure 4: Comparison of wind speed profiles from Holland (1980) and Willoughby et al. (2006) parametric wind field models for various intensities.
To generate a realistic two-dimensional wind field from parametric profile models, the wind speed profile is first applied radially around the eye of the storm. Adjustments to the wind field are then applied to allow for planetary boundary layer corrections, forward motion asymmetry, wind inflow angle and correcting for the wind speed averaging period. Figure 5 shows a satellite image of a historical tropical cyclone off the east coast of Madagascar and the estimated surface wind vectors resulting from a parametric wind field model. Also shown are the locations of the storm intensity metrics (Pc and Vmax).

Figure 5: Estimated surface vectors from a parametric wind field model for a historical event off the east coast of Madagascar.
The validation of any wind model is important to ensure that the model is producing reasonably realistic wind fields. Figure 6 compares the measured and modelled wind speeds for Tropical Cyclone Geralda (1994) at Tromelin Island (54.52˚E, 15.887˚S), located in a particularly exposed area of the southwest Indian Ocean. Tromelin Island is particularly small, with a land area of approximately 1 km2. The island is flat and sandy, free from any notable land-based features. Therefore, wind measurements on the island are likely to be fairly representative of open ocean winds.

Figure 6: Modelled vs measured wind speeds at Tromelin Island during Tropical Cyclone Geralda (1994).
Probabilistic track models use statistical distributions of best-track data parameters to augment the historical archive of many thousands of years of data. This can be done using either site-specific models or basin-wide synthetic track models. Figure 7 gives an overview of the simulation approach for site-specific models.

Figure 7: Overview of the simulation approach for site-specific probabilistic models (Vickery et al., 2009)
The various components of site-specific probabilistic models (labels 1 to 5 in Figure 7) are described individually below:
With the described approach, it is possible to generate thousands of years of tropical cyclone-induced wind speeds at any site of interest, from which extreme wind speeds at return periods of interest can be derived.
In a pioneering study, Vickery et al. (2000) extended the techniques used in site-specific probabilistic models by developing a basin-wide synthetic track model. Rather than generating track parameters at a given site, entire tracks are synthesised over large areas (often entire basins) from their genesis to termination. This process effectively produces synthetic best track data in the same format as historical best track data but throughout thousands of years. Figure 8 presents an example of the output of a synthetic track model compared to historical best track data for the North Atlantic Ocean (Emanuel et al., 2006). Using synthetic tracks in this way remains the current state-of-the-art technique for quantifying extreme tropical cyclone-induced wind speeds (Vickery et al., 2009; Zhang & Nishijima, 2012). However, it is noted that the accuracy of this approach is largely limited by the ability of the model to reproduce the statistical properties of the underlying historical data. However, areas with particularly low occurrence rates may still be problematic, as estimated distributions from sparse data may not accurately represent the true distributions.

Figure 8: Sixty random tracks from a synthetic track model (a) and a historical dataset (b) over the North Atlantic Ocean (Emanuel et al., 2006).
Having generated a database of synthetic tropical cyclone tracks via either site-specific or basin-wide approaches as described above, a parametric wind field model can then be applied along each track (as per steps 4 and 5 of Figure 7) to generate thousands of years of modelled wind speeds at any location of interest. Given the length of the synthetic record, there is no need to apply theoretical extreme value distributions to estimate wind speeds at return periods of interest for engineering design (e.g. 200 years). Design wind speeds can be determined directly from the synthetic wind record (Vickery et al., 2000). Applying calculations on a regular grid over the domain allows the estimation of extreme wind speed maps over large areas.
Figure 9 estimates the 200-year return period of tropical cyclone wind speed map for the southwest Indian Ocean. This study employed a novel synthetic track model to produce 5,000 years of tracks. It employed the Willoughby et al. (2006) parametric wind field model to estimate extreme wind speeds on a 1˚ geographical grid. Extracting model results along the east coast of the southern African coastline provides estimates of extreme wind speeds, which could be adopted for the design of coastal infrastructure along this stretch of coastline, as shown in Figure 10.

Figure 9: 200-year return period 1-min average wind speeds due to tropical cyclones for the South-West Indian Ocean (Fearon, 2014).

Figure 10: 50, 100, 200 and 500-year return period 1-min average wind speeds due to tropical cyclones as a function of latitude along the Southeast African coastline (Fearon, 2014).
In addition to extreme wind speeds, the engineering design of coastal structures in regions prone to tropical cyclones requires the estimation of extreme waves, water levels and currents due to these events. This is typically carried out by applying an ocean response model (coupled hydrodynamic and spectral wave model), using space and time-varying tropical cyclone wind and pressure fields as input to the model. The coupling of hydrodynamics with wave generation can be particularly important as increased storm surge (due to low atmospheric pressure near the eye and wind setup due to onshore winds) leads to reduced depth-induced wave breaking and, therefore, higher wave heights at the structure of interest. Higher wave heights, in turn, lead to increased water levels in the form of wave setup. The approaches to defining extreme ocean response parameters can be classified as deterministic and probabilistic.
In the deterministic approach, the extreme wind speeds (estimated from a probabilistic approach as described above) are used to select “design storm” parameters, which are the required input to an ocean response model. This approach uses extreme wind speed estimates (Vmax) to estimate the other storm parameters. While deterministic relationships are available for the estimation of the associated minimum central pressure (Pc) and radius to maximum wind speed (Rmax), the parameters of track speed (c) and direction (θ) are, however, less well correlated with storm intensity. As it is not possible to define a unique design storm from extreme wind speed estimates alone, a small set of candidate design storms is defined so that the sensitivity of the model results to these candidate storms can be ascertained. These storms are often called “screening storms” (Resio et al., 2007).
The probabilistic approach to modelling ocean response is analogous to that used to calculate extreme wind speeds. In this approach, a coupled hydrodynamic and spectral wave model is applied, with each synthetic track passing within a defined threshold distance of a given site of interest. Saving the modelled waves, water levels and currents at the site due to each synthetic track, it is possible to generate thousands of years of synthetic ocean response parameters from which extreme values can be derived. An example of the application of this methodology – to the Australian east coast – is provided by Harper et al. (2004). This approach is, however, limited by the significant computational requirements of modelling ocean response due to thousands of years of synthetic tracks.
The design of coastal infrastructure to withstand tropical cyclone events is complicated by the lack of historical events and the catastrophic consequences when they do occur. Much effort has been invested in alleviating the uncertainty in estimating tropical cyclone risk exposure via probabilistic approaches. While these methods have limitations, they can go a long way to improving estimates of design parameters and ensuring that coastal infrastructure is neither under-designed nor over-designed.
Read more about EPCM Offshore experiences
Emanuel, K., Vivant, S. & Risi, C., 2006. A statistical deterministic approach to hurricane risk assessment. American Meteorological Society, pp.299-314.
Fearon, G., 2014. Extreme wind speeds for the South-West Indian Ocean using synthetic tropical cyclone tracks. Master’s thesis. Stellenbosch University, Faculty of Civil Engineering.
Harper, B., Hardy, T., Mason, L. & Astorquia, A., 2004. Queensland climate change and community vulnerability to tropical cyclones, ocean hazards assessment. Stage 2. Tropical cyclone induced water levels and waves: Hervey Bay and Sunshine Coast. Queensland Government.
Holland, G., 1980. An analytical model of the wind and pressure profiles in hurricanes. Monthly Weather Review, 108, pp.1212-1218.
IBTrACS, 2014. International Best Track Archive for Climate Stewardship. [online] Available at: http://www.ncdc.noaa.gov/oa/ibtracs/index.php?name=ibtracs-data-access [Accessed 10 March 2014].
Resio, D., Boc, S., Borgman, V., Cardone, A., Cox, W., Dally, R. et al., 2007. White paper on estimating hurricane inundation probabilities. U.S. Army Corps of Engineers, ERDC-CHL.
Vickery, P., Masters, F., Powell, M. & Wadhera, D., 2009. Hurricane hazard modelling: The past, present and future. Journal of Wind Engineering and Industrial Mechanics, 97, pp.392-405.
Vickery, P., Skerlj, P. & Twinsdale Jr., L., 2000. Simulation of hurricane risk in the US using an empirical track model. Journal of Structural Engineering, 126(10), pp.1222-1237.
Willoughby, H.E. & Rahn, M.E., 2004. Parametric representation of the primary hurricane vortex. Part I: Observations and evaluation of the Holland (1980) model. Monthly Weather Review, 132, pp.3033-3048.
Willoughby, H.E., Darling, R. & Rahn, M.E., 2006. Parametric representation of the primary hurricane vortex. Part II: A new family of sectionally continuous profiles. Monthly Weather Review, 134, pp.1102-1120.
Zhang, S. & Nishijima, K., 2012. Statistics-based investigation on typhoon transition modeling. In: The Seventh International Colloquium on Bluff Body Aerodynamics and Applications, Shanghai, China.
Willoughby, H. E., Darling, R., & Rahn, M. E. (2006). Parametric Representation of the Primary Hurricane Vortex. Part II: A New Family of Sectionally Continuous Profiles. Monthly Weather Review, 134, 1102 – 1120.
Zhang, S., & Nishijima, K. (2012). Statistics-Based Investigation on Typhoon Transition Modeling. Shanghai, China: The Seventh International Colloquium on Bluff Body Aerodynamics and Applications.
We introduce the consideration of LNG as Vehicle Fuel. For a number of decades, oil-derived products have led the way for vehicle fuel. Infrastructure for fuel distribution in mature markets is very established and developing rapidly in Africa.
Although several new options exist to fuel vehicles, replacing the infrastructure for alternative fuels will take a long time. Mature countries have started transitioning their vehicles to natural gas, electricity, and hydrogen as alternatives to petrol and diesel. Green economies and cost savings largely drive this shift for the end-user.
There’s no denying that electric vehicles are advancing rapidly, with figures like Elon Musk and his Tesla brand revolutionizing public perception of electric cars. A significant advantage of electric vehicles is their ability to utilize existing infrastructure for recharging. Users can recharge at home and use charging points while travelling.
The main limitation for electric vehicles is not the recharging infrastructure but the technology itself. Most current electric vehicle options require users to sell their existing cars and invest in new electric or hybrid models. With millions of petrol and diesel-powered vehicles on the road, transitioning to electric cars will take several years. While first-world countries offer many incentives to support this green shift, such incentives are largely absent in Africa, which still struggles to establish petrol and diesel infrastructure to service the growing market.
Fortunately, another option exists that could assist Africa in its transition to greener fuels: LNG (Liquid Natural Gas). When methane gas is cooled to -161 °C, it transitions from gas to liquid. In its liquid state, the volume is reduced by 600 times compared to gas at atmospheric conditions, allowing for storage similar to how petrol and diesel are stored. The energy density of LNG is also comparable to that of diesel, with 1.6 litres of LNG equivalent to 1 litre of diesel.
Several options exist to create a stable supply of LNG for the African market. The first option involves importing LNG via large vessels from existing LNG plants worldwide. The LNG would then be transferred through cryogenic pipelines from the vessel to an LNG storage facility, where trucks can be loaded for distribution.
The second option is to liquefy methane gas from a pipeline or wells. This is done with an LNG liquefaction plant that cools the gas to the required temperature. Small-scale liquefaction plants work very well to produce LNG for the vehicle fuel market. LNG liquefaction plants work very similarly to ASUs (Air Separation Units) used to liquefy oxygen, nitrogen and argon.
When LNG is heated, the liquid changes back into methane gas. Thus, it’s very important that the LNG is stored and transported in insulated tanks. It’s common practice to have 0.5% boil-off gas per day when transporting LNG. In many cases, the trucks transporting the LNG will run on the boil-off gas from the LNG.
Once the gas is liquefied, insulated tanker vehicles transport the LNG to the end-users. LNG can be supplied to existing retail fuel outlets for vehicle fuel as well as industrial users for heating and power purposes. The LNG can be stored in the liquid phase and only re-gassed at the end of the process before being injected into vehicles or re-gassed into existing gas infrastructure for industrial and power purposes.
Once the LNG reaches the retail fuel outlet, it is transferred to the LNG fuel tanks at the retail fuel station in the cryogenic phase. The LNG stays in the liquid phase during the vehicle refuelling process and is only re-gassed directly before being used in the engine.
Although vehicles need to be converted from diesel or petrol-fueled vehicles to run on methane gas, it’s not a major conversion, and existing vehicles can be used. For petrol engines to be converted to run on methane gas, no major changes need to be made except for the gas storage and injection system. Petrol vehicles can run on 100% methane gas, a complete change from petrol to gas. If the vehicle runs out of gas, it can continue running on petrol by only switching between storage tanks. Diesel-powered vehicles can be converted to dual-fuel by injecting methane gas into the diesel fuel mixture. However, diesel cannot completely be replaced as it’s still needed to create an ignition using the diesel. With the latest engine management systems developed by companies like Caterpillar, up to 85% of diesel can be replaced by methane gas. When a diesel engine converted to duel fuel runs out of methane gas, it continues on diesel without any changes needed to the engine.
Thus, vehicles can be converted to run on methane gas (LNG) without changing their engines completely and using existing fuel retail station infrastructure. This creates an environment where vehicles can be economically converted to green fuels over time. Once gas infrastructure improves and vehicle owners get used to using methane to fuel vehicles, they can start procuring new gas-fueled vehicles.
A good example to look at is China. They started the process by converting existing vehicles to run dual-fuel methane systems on CNG and have now moved over to complete LNG and CNG-fueled vehicles. They could make this transition because the country’s infrastructure caught up, and vehicles can now refuel using diesel, petrol, CNG or LNG.
When looking at the business case for LNG as a vehicle fuel, the cost of methane gas, diesel, petrol, electricity, and liquefaction technology must be considered. As a rule of thumb, the cost of methane gas from the pipeline should be less than one-third of the cost of petrol or diesel in the country. Once the cost of capital for liquefaction technology and electricity is taken into account, an additional 50% should be added to the cost of the methane to get it into the liquid phase. To sell the LNG at a price that makes sense for the end-user, it should be sold between 15-30% less than the price of petrol or diesel. Even at this reduced price of LNG, the margin involved in LNG is much higher than that of petrol or diesel, and some projects have IRRs in the range of 40%.
LNG burns very cleanly and reduces emissions and maintenance costs significantly. Vehicle maintenance can be reduced by up to three times compared to existing maintenance philosophies.
In Africa, fuel theft is a major concern, and trucking companies lose a lot of money annually. Since petrol and diesel are well known in Africa, an informal market exists to sell stolen petrol and diesel. With LNG being stored at -161deg C, nobody will attempt to steal the LNG fuel. If the LNG gets removed from its LNG container, it will re-gas and disperse into the atmosphere. It’s thus a great means for trucking companies to reduce fuel theft in their fleets.
Small-scale LNG is the future of the fuel industry for the next decade or two, with hydrogen and electricity to follow. Even though Africa is far behind with infrastructure, it’s very possible that small-scale LNG can replace petrol and diesel in certain industries in the very near future.
Innovative oil retail companies are already investing a lot of money into LNG and seeing great returns from being first movers. LNG technology keeps getting cheaper, and the prices of methane gas are reducing as more gas is discovered. This will all contribute to LNG penetrating the African and global markets.
Read more about EPCM LNG here.
DNV’s excellent Energy Transition Outlook (ETO) Report Energy Outlook on Oil and Gas provides an outlook and forecast on the world’s energy mix to 2050. The full report can be requested from https://eto.dnvgl.com/2018. This summary focuses on the oil and gas sector report.
EPCM breaks down the Energy Outlook—Oil and Gas (DNV Report Notes): In efforts to make the world’s energy system cleaner and more efficient, the oil and gas value chain is changing. There is a focus on transitioning to a lower-carbon energy mix, which is seeing companies diversify from oil and increasingly include gas in their portfolios.
In the oil and gas industry, energy is measured in million tonnes of oil equivalent, whilse the power industry uses terawatt hour. The International System of Units uses joules, or exajoules (EJ).
One EJ is
For regions described, the following abbreviations are used: NAM (North America), LAM (Latin America), EUR (Europe), SSA (Sub-Saharan Africa), MEA (the Middle East and North Africa), NEE (North East Eurasia), CHN (Greater China), IND (Indian Subcontinent), SEA (South East Asia), OPA (OECD Pacific).
Gas is forecasted to be the primary energy source by the end of 2050, followed by oil.

It is forecast that there will be a steady increase in oil demand over the coming years, reaching the peak demand in 2023. A steep decline will follow this. Although the oil demand will decrease, new resources must be developed to replace depleted reserves.
Demand growth in emerging economies is expected to continue until 2030, notably in China, India and Southeast Asia. However, the shift to cleaner fuel sources will result in a decline in oil demand in Europe, North America, OECD Pacific and Latin America.
Demand for oil used in transport will reduce by two-thirds between 2022 and 2050, from 106 EJ/year to 34 EJ/year. Non-oil energy sources will account for over 60% of transportation energy use by 2050, compared with 7.3% in 2017. This will result in refineries having to shift their product slates from liquid fuels to petrochemical products, particularly in India and Sub-Saharan Africa.

Gas demand will continue to increase by 30% for the next 15 years and peak in 2034 at 186 EJ/year. From there, it will decline to 148 EJ/year in 2050.
With the decarbonisation of the gas supply, biogas, hydrogen, and syngas will gain more prominence.
Peak demand for gas has already reached various regions, including Europe (20 EJ/year in 2010), OECD Pacific (9 EJ/year in 2015) and North East Eurasia (24 EJ/year in 2011). Peak gas demands are still to be reached in China (41 EJ/year in 2035), North America (39 EJ/year in 2021) and Southeast Asia (10 EJ/year in 2035). The Indian subcontinent and Sub-Saharan Africa will see a continuation of gas demand through 2050.
The demand for gas will be driven by power generation, which will see the demand for gas rise for the next 15 years, before declining towards 2050 as wind and solar start to dominate power supply.
Gas use in transport will increase in the form of compressed natural gas (CNG) and liquefied natural gas (LNG). By 2050, gas will meet 5% of transportation fuel needs.

Conventional onshore oil will provide the majority of total oil production but will see a steady decline in production levels. Unconventional onshore oil production (horizontal drilling and hydraulic fracturing) is set to double to 17 million barrels per day (Mb/day) by 2023.

The Middle East and North Africa will yield more than half of conventional oil production by 2050. North East Eurasia production will decline from 2026 but will remain the second-largest producing region. Latin America will move into third place as output from China declines. China will shift its focus to decarbonisation and focus on gas and renewables.
The world’s need for new conventional onshore oil capacity will continue to decrease, and by 2045, only mature fields will be in operation. North America will not see new additions to conventional onshore production due to the rise of unconventional oil production there.
Beyond 2020, oil supply will increasingly come from unconventional sources due to increasing volumes being accessible. It is interesting to note that unconventional oil producers are not bound by OPEC agreements and can be profitable at oil prices of USD 50-55 per barrel, circumventing OPEC’s efforts to raise prices by cutting production.

North America and Latin America dominate unconventional oil production, but other regions, such as China and North East Eurasia, will become more prominent. Peak production of unconventional oil will be 17 Mb/day in 2034, with North America accounting for 50%, Latin America 42% and China 5%. New production capacity will, therefore, double from 1.5 Mb/year in 2015 to 2.1 Mb/day per year in 2031.


Offshore production will drop by more than two-thirds from 27 Mb/day in 2017 to 9 Mb/day in 2050 due to cost increases from operating in challenging environments. Most regions will see a large reduction in production, with only the Middle East and North Africa maintaining high production levels due to low development costs. Sub-Saharan countries will see annual additions to capacity, but only until the mid-2020s.
International oil companies are shifting their focus to building broader energy portfolios that include batteries, hydrogen, and renewable energy. This may result in less appetite for developing deepwater sources or resources in harsh environments. However, the cost of deepwater developments did drop from USD 75 per barrel in 2014 to USD 45 in 2017, making them more viable at lower oil prices.
New gas production capacity will increase from 52 Gm3 added annually in 2017 to 64 Gm3 per year in 2022. This surge will mostly come from developments in Northeast Eurasia (including Russia), the Middle East and North Africa. While China’s addition of new capacity will taper off from 2020, the Indian Subcontinent and Sub-Saharan Africa will add new capacity until 2035.

North America, Latin America, the Middle East, North Africa, and China are estimated to have the largest recoverable shale gas resources. Production of unconventional gas in North America will peak in 2035 at 1031 Gm3/year. By 2050, this is expected to account for 91% of the US domestic gas supply.
North America leads the way in developing unconventional gas resources. Other regions are lagging either because they do not need to develop new sources or because of environmental concerns, with some countries banning hydraulic fracturing. Technological advancements are set to reduce the cost and environmental impact of unconventional oil and gas production.

Offshore gas production volumes will grow mainly from the Middle East, North Africa, and South-East Asia. Production will increase by 26% by 2031, after which it will slowly decrease. Europe will remain a large source of offshore gas.

The new capacity will be added at a rate of 87 Gm3/year in 2036, up from 68 Gm3/year in 2017. New additions will then reduce to about 26 Gm3/year in 2050. This is half of the reduction expected for offshore oil capacity additions. The Middle East and North Africa will see the newest production capacity by 2050.
New floating LNG (FLNG) production technology offers a solution to unlock offshore gas assets that can be exported by LNG carriers rather than uneconomic pipelines.
Costs for deepwater developments have reduced from USD 75 per barrel of oil equivalent in 2014 to USD 50 in 2017. Overall, development and production costs have reduced by 30-40%. Additionally, demand for gas in domestic appliances has increased in emerging markets, notably in African nations. The demand for natural gas in residential and commercial buildings will grow nine-fold to 1 EJ/year in 2050 in Sub-Saharan Africa.
There will be a large increase in gas demand in countries with less established gas infrastructure, such as India and China. Between 2017 and 2035, China’s gas import demand will increase from 160 Gm3/year to 760 Gm3/year in 2035. Gas trade by sea from North America to China will treble to more than 100 Gm3/year. A substantial increase in gas trade from Sub-Saharan Africa to India and South East Asia is expected to reach 25 Gm3/year in 2050.

Overall, there will be a 2.5% annual increase in the global seaborne natural gas trade (LNG and LPG combined). The maritime industry’s demand for LNG as fuel will increase from 16 Mt/year in 2017 to 85 Mt/year in 2050. The increase in demand could drive the construction of cross-border and national transmission pipelines, LNG terminals, LNG bunkering and LNG carriers. Gas transport, such as LNG, is expected to grow faster than pipeline transport. This could underpin a stronger global market for trading gas since consumers aren’t dependent on pipeline routes.
Refiners have to adjust to changes in demand for petroleum and diesel products, changes to fuel quality specifications (e.g., sulphur limits for ship fuel) and the switch to electric vehicles. A peak refinery output of 29 000 Mb/year is forecast in 2025, followed by a 50% decline in global production by 2050. Refinery demand growth is the only forecast for Sub-Saharan Africa and the Indian Subcontinent. Improvements in the energy efficiency and technical configuration of refineries will be required.
There will be ongoing demand for petrochemical products driven by product innovations in the agricultural, pharmaceutical and industrial chemical markets. There will be significant market growth in the Indian Subcontinent and Sub-Saharan Africa. The industry’s feedstock mix is forecast to change from 56% oil/36% gas in 2016 to 48% oil/42% gas in 2050, also showing the prominence of gas over oil in the global energy mix in the future. There will be a focus on optimising lifecycle performance and efficiency for existing and new facilities.
The increasing demand for natural gas will require investment in production, processing and transportation services. Trade in LNG hit a global record of 258 Mt in 2017, caused by additional supply from the Pacific Basin, exports from the Gulf of Mexico and increased demand in Asia (notably China, India and Pakistan). This led to the development of new processing capacity; now, over 1,800 processing plants are operating globally. Europe is unlikely to see growth in processing capacity due to declining gas production.
Carbon capture, utilisation and storage reduce emissions from large industrial sources of CO2. Carbon can be captured and stored permanently or be utilised in manufacturing processes or other industrial applications. Currently, 22 carbon capture and storage facilities are in operation worldwide, with 12 of those located in North America, where the carbon is used in enhanced oil recovery (EOR). EOR projects largely have viable business cases, but other forms of CCUS generally require government subsidies. The uptake of these technologies is heavily reliant on the carbon price, which is driven by policy. It is estimated that an increase of 33% in the carbon cost will increase the uptake of CCUS technologies by sevenfold.
Biogas largely consists of methane (50-60%) and CO2 (35-50%) and can be used to generate electricity and heat. If the CO2 is removed, the resulting pure biomethane can substitute natural gas in power plants and residential gas appliances. It can also be used in the transportation sector as fuel.
Biomass transportation is costly, so the generation of biogas is most feasible when it is located close to the source.
Europe is the main location for biomethane production due to its well-developed natural gas infrastructure. This infrastructure lends itself to utilising biomethane to supply industry and provide fuel to existing gas-fired power plants. The industry there also benefits from a public policy that encourages the use of biogas.
The global cap on sulphur emissions in the marine industry is driving the uptake of LNG as a marine fuel. The use of gas as fuel in vehicles is also seeing a large uptake, most notably in heavy goods vehicles, where battery solutions are unsuitable. Vehicles that can use biogas, CNG, hydrogen or LNG as fuel are being produced. Aviation is the most difficult sector to decarbonise in this way, but progress is being made, with hybrid diesel/hydrogen fuel cell engines in development.
Hydrogen has a high energy storage capacity and does not emit greenhouse gases when burned. Hydrogen is expected to have a growing share of the energy demand in some regions, with a 0.5% share of the global energy mix expected in 2050.

It will mostly be used in the transport and building sectors. The drive for decarbonisation is expected to boost the market for multi-fuel burners and engines suited for hydrogen. Small fuel cells and domestic appliances can also be modified to run on hydrogen.
Introducing HDPE Retail Fuel Tanks. Fuel stations have been erected in South Africa for many years. It used to be infrastructure that only the oil majors owned and operated.
Oil majors write many rules and regulations into their design manuals to specify exactly what they want and ensure a standardized design for each station.
South Africa recently changed its regulations, and anybody or any brand can now open a filling station in South Africa if they get approval and a license from the DOE (Department of Energy).
This has led to several new brands opening retail fuel stations with less stringent design codes and regulations while still following international practices and ensuring safety at all times.
The new entrants in the retail fuel market have also started challenging certain practices that have been followed for many years. This has led to them exploring different equipment suppliers, material selections and layouts for retail fuel stations.
Driven by innovation and commitment to the industry, a lot of effort has gone into optimizing the retail fuel station market and providing better value to existing and new clients. One area of specific improvement is material selection for underground fuel tanks.
For many years, retail fuel tanks were single-wall carbon steel tanks installed below the ground surface with no cathodic protection. Although these tanks are cheap to build and install, we find many instances where they have rusted through, and the fuel that was supposed to be stored in them contaminated the soil around them.
Most of the old fuel stations in South Africa still have these tanks installed, but as stations get refurbished, the latest design tanks with a double wall get installed. These double-wall tanks are a lot better than the single wall tanks, they have an inside carbon steel wall and an outside layer of GRP (glass reinforced plastic). They also measure the pressure in the cavity and can indicate when one of the layers starts leaking. With the outside layer of GRP, cathodic protection is unnecessary, although it can still be installed as a backup system.
South Africa has several companies manufacturing these types of tanks, and most international retail tank manufacturers can manufacture and supply them. China manufactures most of these retail fuel tanks worldwide, and competition from imports is very stiff.
The fact that retail sector clients are cost-sensitive, combined with cheap imports from China and mature technology, creates a dog-eat-dog market where price plays a major role in the supply of these retail fuel tanks.
This has led to the EPCM team exploring new designs and working with one of the world’s best High-Density Polyethylene (HDPE) large-diameter pipe design and manufacturing companies from Germany. A new HDPE retail fuel tank was born, which will change how retail stations procure and install tanks in the future.
This fuel tank will have a capacity of 50m3 (50 000 l) and weigh only 1.4 tons. This is in comparison to the 40m3 (40000l) double-wall tank weighing more than 7 tons.
Installation techniques will change completely, as large cranes will no longer be needed to move the tanks into position. This will also improve site safety and reduce logistics costs.
The cost of materials will be considerably less than the steel fabrication of these tanks, which will be a big cost savings for the client.
Corrosion will also be a thing of the past, as the 2-layer tank will have an HDPE outside layer and a Pipelon/PE inside layer. The outer layer will prevent corrosion on the tank, and the inside layer will stop fuel diffusion and prevent static loading. A core tube will be integrated between the two layers to ensure the correct stiffness is obtained. The combined layers should be antistatic, fuel-resistant and corrosion-resistant.
The dome will be produced using the same process and having the same layers without the core tubes needed for stiffness. The dome ends will be welded to the tank shell with the electrofusion welding process.
The new retail fuel tanks have undergone two years of testing in Germany, and the results have been a big success. The tanks are now ready to enter the market and be certified in accordance with local codes and standards.
As part of the optimization process of retail fuel stations in Africa, EPCM will drive the design and supply of these tanks. The outcome of installing one of these HDPE fuel tanks at your depot would improve your CAPEX during construction, your OPEX during operations and environmental challenges and potential liabilities in the future.
The design life of one of these tanks would be 100 years, compared to the normal tanks, which usually have to be replaced every 20 years. This will also have a big impact when retail stations change hands, as the current norm is to replace tanks and pumps when stations are sold or refurbished. This means that oil companies can see their tanks as assets rather than an environmental liability when selling to another company.
The EPCM team also constructs many large API 650 storage tanks and is currently investigating the use of HDPE in different layers to construct these tanks. This will also be a market-disrupting technology, as the current method of constructing API 650 storage tanks is to weld steel plates together on-site. This leads to many logistical problems in Africa and quality problems when welding the steel plates together.
By switching to HDPE storage tanks to store fuel, most of the material and machines needed to construct these tanks could be loaded in a few containers and shipped to the site. HDPE also does not have a long lead time, and construction periods would be shortened considerably.
The challenge when constructing above-ground storage tanks is selecting the material that will give the tank its structural integrity. Many options exist, with the core tube being the most basic solution and a mesh-like layer being a bit more complex. This is currently in the development stages, and more refinement is needed to produce a final product.
The extrusion and potentially 3D printing solutions are currently evaluated to determine the best options for the HDPE fabrication on site. Site conditions will also play a big role and should be closely monitored to ensure they do not affect the quality of the application. Creating a controlled environment would also work similarly to a welding hut on a pipeline that controls humidity and temperature.
Although a lot of hard work still needs to be done to get these products to the market, it’s a giant leap for tank fabrication globally, and in the next few years, the way tanks are built and installed will completely change.