Determining Construction Project Progress: How can a project be 90%, 0%, and 20% complete in terms of progress, all at the same time? You may think I’ve gone completely mad, yet I can show you that all three figures were simultaneously accurate at the time! Here’s what happened—let’s see if you can work it out.
The contract’s value was 10 million and its duration was 10 months. It involved 1 million in building works and 9 million in equipment.
The equipment was delivered in month 2 of the project, but building work hasn’t started yet. The 9 million has been certified and paid to the contractor.
What is the progress % complete on this project?
I hope you didn’t take too much time out of your day to work it out.
Based on the wide-ranging opinions on the certification of material on site (MOS), the project is 90% complete regarding value. It is 0% complete in terms of effort and 20% complete in elapsed time.
Let’s look at each of these variables in isolation:
What ruins a lovely project meeting for me is when someone proclaims: “The time elapsed, Mr Contractor, is already 50%, and yet we have only spent 20% of the budget! Explain this variance! “
It begs the question, what does time-elapsed measure or tell us?
Well, it’s amazingly simple. Take a look at your watch or computer clock for a moment. It ticks by with due regularity. When you tell someone that 50% of the time has elapsed on a project, you are, in fact, stating, to my sheer amazement, I must add, that time goes by with due regularity on a project. Thank you. Now that we have a firm grasp of the obvious, let’s move on.
Time elapsed is not an effective project performance measurement tool. It has no direct relationship to progress on a construction site whatsoever except at the start and finish of the project’s duration.
It’s like having a broken watch. Your time will read correctly twice during a 24-hour cycle. Is it an accurate watch? No, of course not. Can you use it effectively to arrive on time for meetings? Definitely not.
A contractor can decide to dilly-dally for 9 months of a 10-month project and complete everything in the last month. If, at this 9-month point, we have a metric that says 90% of time has elapsed, yet progress is 0% on site, it is nonsensical and imprudent. Why? Because it’s two different variables with no comparative value (except at 0% and 100%). It says nothing about variance. Also, the harm here is that external stakeholders assume it says everything about variance and that’s usually the inference drawn. Stakeholders assume that the project is 90% behind schedule as they measure variance between time elapsed and actual progress.
What is the variance between planned and actual in this example? The answer is 0%. The contractor planned to dilly-dally for 9 months and complete 100% of the work only in month 10. Therefore, our planned progress in month 9 was 0%. Our actual progress is also 0%. Therefore, we have a variance between planned and actual of (0%-0%=0%) 0%. This would inform us that this project is 100% on time as planned!
In this instance, our lovely and amicable project meeting is again turned into a shouting match when someone, usually the QS, proclaims: “We’ve only spent 3 million on the project, which is 30% of the value, but the contractor claims they have progressed 50% on programme. Explain the variance!”
Let’s get something clear—the Actual value of work certified and the actual effort on site (manhours) are also two completely different variables. We are again fooled into believing they are somehow comparable due to the broken watch theory—at 100% value certified, we should be about 100% complete. But for everything in between 0% and 100%, these two metrics can follow vastly different paths.
To prove the point, consider our initial example. The value certified on this project is 90% (9 million of 10 million budget). The manhours expended are 0. Therefore, progress on the schedule will be 0%. Although the example is theoretical, it simply proves the disconnect between the two variables and anyone assuming they are connected is setting themselves up for trouble.
Yes, we have to agree that value and manhours could have some relation to each other under normal project circumstances, and comparing them can possibly raise a flag in terms of progress. However, it needs to be done with careful consideration as there are numerous factors which influence this connection:
Many bills of quantities are riddled with provisional sums, budgetary allowances, and contingency amounts. Doing a quick calculation on five of our current projects, these amount to an average of 42% of the Contract sum! Contingencies and Budgetary allowances alone account for 5-10%.
Standard systems of measurement and contractual provisions that drive the valuation of interim payment claims sometimes differ significantly from the project’s operational implementation. Think advanced payment provisions, payment milestones, etc., which are completely removed from the actual work achieved on site.
What is the solution? We still have a project that is 20%, 90%, and 0% complete simultaneously, and we have to agree that all three variables are correct in isolation. How do you explain to the lawyers, accountants, and external stakeholders that their project is 20%, 90%, and 0% complete in month 2?
The answer to this conundrum is not that difficult.
When we look at the following variables of our project, what is the missing link?
Time elapsed = 20%
Value completed = 90%
Effort completed = 0%
We are only considering three actual values. What is missing is the planned equivalent of each of these.
Once we quantify the planned for each, we can make sense of the data as shown below:

We now have meaningful data. The idea is to compare horizontally each variable’s planned and actual performance.
The moment you try to make a vertical comparison, trouble starts. For instance, we cannot compare the actual value with the actual effort, nor the actual time elapsed with the actual effort, and so on. This is like trying to compare apples with pears.
If you never fully understood Earned Value, now is your chance. Earned value creates a link between the Value and Effort variables. It essentially assigns a monetary value to the effort. A cost-loaded construction schedule on a project will achieve this. Once you’ve created a cost-loaded schedule, you can connect value with effort and measure both in one go.
Be careful with comments about a perceived connection for projects without a linked construction schedule. You are tampering with the doorknob to a room full of criticism, mockery, and scorn.
I apologise for any professionals who got hurt while reading this article.
Kobus le Roux is the Managing Director of Le Roux Consulting (Pty) Ltd, a boutique construction consultancy specialising in project scheduling, forensic delay analysis, construction dispute assistance and MS project training.
JBCC Instruction to Accelerate: Acceleration is a sticky concept in the building industry, especially within the scope of the JBCC contract. Contractors, employers, and principal agents habitually find themselves in heated disputes after acceleration deals go wrong.
It’s only late in the day when parties realise that acceleration is an artificial arrangement and doesn’t exist in the JBCC.
In this article, we will look at the concept of acceleration and what you need to know, to protect your interests as a contractor or principal agent. We also ask the fundamental question: Can the principal agent issue an instruction to accelerate work under the JBCC Contract?
In a JBCC questions-and-answers session, one contractor sketched a scenario that should be quite familiar to many professionals in the building industry.
This particular contractor suffered delay and provided a notification and later a claim regarding the JBCC.
The principal agent responded and refused the extension of time claim (EOT).
The reason for refusal was that after scrutinising the programme, the principal agent identified opportunities for acceleration. Some of these opportunities required additional resources, but the principal agent also pointed out some opportunities in the programme, where a sequence change could lead to faster completion. The principal agent felt the contractor could implement these sequence changes and resource additions to accelerate work, benefit the project, and recoup the claimed delay.
The principal agent also acknowledged that a portion of the proposed acceleration may require additional expense and cost, which the employer was willing to reimburse the contractor for.
The principal agent then formally instructed the contractor to accelerate work and keep the practical completion date fixed.
The principal agent’s instruction may sound very cordial in this instance. You may even wonder why a contractor would not simply follow this amicable arrangement?
But experienced contractors would know we are stepping into a contractual minefield:
As you can see, once we step beyond the JBCC’s intended bounds, we are in trouble. Or, as my Namibian clients would always say, ” We have hit some thick sand.”
There is no contractual definition for acceleration found in JBCC. The word doesn’t even exist in the contract. As a result, the parties are lost in a vast expanse of subjective opinions and common law pitfalls.
It thus begs the question:
The fact is, a principal agent (PA) does not enjoy unlimited powers to issue contract instructions.
There is a definite limitation on the powers of a PA to issue contract instructions and the JBCC agreement and common law impose this limitation.
From these restrictions it follows then that the PA is not entitled to issue certain instructions such as:
The contractual limits are set out under sub-clause 17.1 of the JBCC agreement.
From a practical standpoint as mentioned earlier, acceleration is sometimes impossible. So, acceleration cannot be a contractual provision at the PA’s disposal on which a binding instruction can be given.
The PA simply cannot issue instructions to force the contractor to carry out work in a particular order, even if there are opportunities in the programme for fast-tracking or changing sequences in a bid to accelerate.
If the employer wishes for work to be carried out in a preferred sequence, it can only be enforced contractually at the tender stage.
This could then form part of the agreement’s terms and conditions early on. The contractor would be under an obligation to adhere to these terms as they could have considered its workability, risk, and cost as part of their tender.
If no such provisions existed at the tender stage, then, under the essence of common law, contractors are entitled to programme and execute the work in a manner and order that they prefer and for which they have priced.
Another important point to remember is that contractors cannot lose their right or entitlement to claim for an EOT only because acceleration options are being considered. In other words, the PA cannot unilaterally dispose of the contractor’s right to claim a delay, on the grounds of possible acceleration options. This would require a firm amendment of the standard provisions of the JBCC to enforce as we don’t find any such limitations or conditions under clause 23.
Contractors should reject an acceleration instruction formally in writing. But, make sure there are no amendments to your agreement where such an instruction is allowed.
If no such provision exists, contractors must inform the principal agent that it is not a valid instruction in terms of the JBCC and make clear they have no obligation or intention to proceed with it. If the principal agent disagrees, the parties can refer the matter to dispute resolution.
This does not mean that acceleration is prohibited as an option in a JBCC agreement. Parties can still negotiate and agree on a form of acceleration. This can sometimes be a positive negotiation to the project’s benefit. Many contractors also prefer to quote on acceleration rather than claim and EOT, and if handled correctly, it can therefore provide a win-win opportunity for both parties.
However, it is important that principal agents appreciate the contractual boundaries. If an acceleration negotiation is contemplated, it is strongly advised to get legal help in drafting an amendment to this effect.
The amendment needs to protect everyone’s interests and clearly stipulate the rules, terms, and conditions that would apply if the intended acceleration were to proceed.
Kobus le Roux is the Managing Director of Le Roux Consulting (Pty) Ltd, a boutique construction consultancy specialising in project scheduling, forensic delay analysis and construction dispute assistance.
Technologies to Decarbonise the Marine Industry: Maritime shipping is a pillar of our modern worldwide economy, involved in 80 to 90% of international trade. Ships transport everything from raw material to industrial products, goods, feedlots, and transformed food. Despite this omnipresence, maritime shipping “only” produces 3 to 4% of global greenhouse gas emissions (GHG) compared to about 15% for road transportation.
Yet, the general public associates the marine industry with dirty pollution, probably because it only hits the news after a catastrophic oil spill. Or through eye-catching headlines such as “Shipping produces more carbon emissions than most countries” or “If the maritime industry were a country, it would be the 6th largest CO2 emitter worldwide”. Following the Paris agreement on climate, there has been a strong push for the marine industry to reduce both its pollutant emissions (sulphur dioxides (SOx), nitrogen oxides (NOx), particulates) and its greenhouse gas emissions.
The International Maritime Organisation (IMO) has established a 3-step strategy to decarbonise the marine industry:
In this race for a green image, a new sort of competition has started involving technology development, business and economy strategy, media coverage, and political argumentations. All actors in the marine industry must be seen as busy developing disruptive approaches that comply with future policies and are financially viable. Several companies are already working on reaching a greener image, such as Maersk, which has announced its intention to become net-zero carbon by 2050, with carbon neutral vessels on the sea by 2030.
The present article reviews various technologies that the marine industry is currently exploring to reduce CO2 emissions. For each option, we will discuss the GHG reduction potential, technical feasibility, and existing demonstrator. We will also try to evaluate the economic viability of such technologies and their probability of development in the future.
Nearly 90% of international trade uses maritime transport at some point, be it to import raw materials or export finished products. Despite this large implication, maritime transport’s GHG footprint is “only” about 3%.
Currently, there are more than 53,000 ships for international shipping of goods and passengers. Altogether, they represent more than 500 GW of engine power output. As an order of comparison, 500 GW is equivalent to 10 million entry-level Volkswagen Polo cars. At first glance, this might not seem so impressive, but shipping boats run 24/7, and are always quite close to rated power. On the other hand, an average car is on the road for only about 300 hours per year and rarely reaches rated power. Therefore, A maritime shipping engine runs for about 30 times longer than a car engine each year, so the 53,000 ships are arguably equivalent to 300 million entry-level cars. Knowing that there are approximately 1.4 billion cars in the world today, the impact of marine transportation cannot be neglected.
Shipping emissions depend on the length of journeys (explaining why container ships and oil tankers are considerable pollution sources and GHG contributors), but also on fuels and efficiency. Globally, CO2 emissions (Fig. 1) are mainly due to container ships, bulk carriers, and oil tankers (but these three ship classes accounted for 84% of total shipping capacity).

Figure 1- Share of CO2 emissions by ship class.
When comparing transportation modes in CO2 emitted per tonne-km, maritime shipping is much cleaner than other modes. As detailed CO2 emissions vary with ship size and payload, only average numbers are comparable. For a large ship, the order of magnitude is about 5g/tonne-km (with best-in-class delivering less than 2g/ton-km), while it is about 50g/tonne-km for trucking and about 20g/tonne-km for the railway.
Of course, the tonnage of large container ships is the main advantage when comparing per tonne transported, but it is not the only one. Large engines used in marine are much more efficient than their on-road homologue for two reasons:
Contrary to the automotive and truck industries that have faced pollutant emission legislation for many years, such constraints are relatively new for the maritime industry. However, because various technologies have been progressively introduced in road transportation, the general public and politicians assume that a broad range of options, such as new fuel sources, engine technologies, and electric propulsion, are ready to be introduced. Each option offers decarbonisation and green credit but also involves reliability questions and financial costs. Furthermore, boats’ lifespan is much longer than trucks and cars, meaning a wrong choice would have long-lasting consequences.
The challenge for shipbuilders and large carriers is to evaluate each option and balance the technological cost with other strategic options such as slow steaming (slowing down the ship to reduce fuel consumption at the expense of longer delivery times). The large variety in ship design and end-use (cargo, tanker, ferry) implies different ways to operate with multiple engine technologies and compliance with emission legislation. Consequently, there is no unique solution for maritime decarbonisation; rather, there is a range of solutions to combine smartly.
For more than 60 years, heavy fuel oil (HFO) has been the dominant marine fuel. Viscous, dirty, widely available, and inexpensive, HFO supported the maritime shipping business model. If HFO is an awful fuel to burn, it is essential to keep in mind that it is so cheap and readily available because it is the by-product of the other crude-based industries that have no other use.
Pollution and climate concerns impose an evolution of marine fuels towards cleaner energy sources, renewable if possible. Yet, changing fuel creates several challenges, not only technical or economic but also from the distribution point of view.
One potential fuel to comply with SOx, NOx and CO2 reduction is LNG (natural gas that has been liquefied to optimise storage). The first dedicated LNG vessel was built in 2000, and about 120 commercially-running LNG vessels are today. They mainly operate in Europe and North America, where emissions legislation is the most stringent.
LNG is generally cheaper than other alternative marine fuels. Still, its price fluctuates a lot, and it requires a specific infrastructure, increasing its cost on international trade routes where it has not yet been widely adopted. Only vessels running most of their time in Emission Controlled Area (ECA) zones get an economic advantage to use LNG, while there is no strong incentive in other parts of the world.
From a composition point of view, LNG contains less carbon per unit of energy than conventional marine fuels. Less carbon content means less CO2 emissions, with a theoretical gain of about 20% compared to HFO. However, because LNG is mainly methane, there are other GHG emissions to consider. A recent detailed analysis published by ICCT (International Council on Clean Transportation) suggests that the LNG benefit on GHG emissions is much smaller because of:
The supply chain is out of control in the shipping industry, and leakage can be minimised so that the technically challenging reduction in unburnt fuel is the critical axis for improvement. The mechanism is well-understood: a part of the fuel is pushed into the smallest crevices of the combustion chamber (head gasket, piston rings, valve seats) during the compression stroke, escaping the combustion. Additionally, wall heat losses prevent the flame from touching the walls, leaving a thin layer of unburnt fuel. The same phenomenon is responsible for unburnt hydrocarbon emissions in road transport applications. Still, it becomes more critical when methane is the fuel as it is a greenhouse gas, impeding the positive impact of LNG on climate change.
A generalisation of LNG impact on GHG emissions is made even more complicated by the large variety in engine technologies used to propel ships:
Each setup has a different operating strategy, efficiency, pollutant emission and cost. Generally speaking, Lean-Burn approaches with Low-Pressure injection are cheaper and more efficient but release more unburnt methane than the High-pressure injection counterparts.
There is also a compromise between NOx reduction and methane slip because a higher fuel conversion requires a higher combustion temperature, increasing NOx emissions. Therefore, without any additional after-treatment device for NOx, reducing GHG emissions with LNG is restricted by NOx emissions limits.
Whatever the engine technology and operating strategy, LNG is a much cleaner fuel than HFO in terms of pollutant emissions. SOx and particulate emissions can be decreased by 90 to 99% compared to HFO, while NOx emissions can also be reduced mainly by more than 70% and up to 90% by leaning the mixture (at the expense of methane emissions).
If crude oil could be replaced by “recycled” CO2, net CO2 emissions could be drastically reduced. This simple idea is the foundation for the use of biofuels and e-fuels. Biofuels recycle CO2 through plant growth, while e-fuels use excess renewable electricity. Furthermore, such fuels are all synthetic; they contain negligible amounts of sulphur, simultaneously solving the SOx emission issue.
Depending on raw material and the synthesis process, some advanced biofuels can reduce CO2 emission by up to 90% (especially using waste oils). Biofuels can be used pure or blended with conventional fuels, allowing their distribution through the existing infrastructure and compatibility with existing engines.
Today, are available relatively large quantities of the first generation of biofuels, such as Fatty Acid Methyl Ester (FAME), bio-ethanol, Hydrotreated Vegetable Oil (HVO), Straight Vegetable Oil (SVO), Di-Methyl-Ether (DME), or Fischer-Tropsch Diesel. Nevertheless, the use of biofuels is internationally restricted because of trade-offs in utilising resources that involve human essentials such as food and water. This explains the interest in waste oils because:
In the absence of incentive or clear policies, biofuels remain relatively expensive compared to their fossil counterparts (about twice the price). For instance, usage costs can ramp up due to maintenance costs induced by corrosion issues or lubricant degradation.
E-Fuels are the next step in synthetic fuels, theoretically allowing the tailoring of fuel to requirements and suppressing raw material handling. Underlying benefits are:
By using excess renewable electricity when production exceeds demand, e-fuel production could become a smart way to control electricity networks while producing sustainable fuels at a relatively low cost.
Methanol is a low-carbon-content synthetic fuel that can be produced from renewable sources (mainly biomass) or fossil resources (natural gas or coal). Gains in CO2 emissions are therefore mainly dependent on its production process, while the reduction in SOx emissions is always significant. Methanol is more expensive than conventional fossil fuels and LNG, so its usage depends on incentives or any public image strategy. There are currently multiple ships running on methanol as demonstration exercises.
Ammonia is a recent development intended to provide a carbon-free hydrogen source without the related safety and handling issues. Its production is similar to e-fuel synthesis minus the introduction of CO2.
Ammonia can be used in combustion engines or fuel cells (see next section). It is still at a very early stage of development for marine applications. Still, five major companies (Imabari, MAN Energy Solutions, Mitsui E&S Machinery, ClassNK, and ITOCHU ENEX) have recently agreed to develop ammonia-fuelled engines for their ships.
Fuel cells are a promising technology, but there is no clear path to industrialisation today. Yet, a few developmental hydrogen fuel cell ships are already sailing.
The critical advantage of fuel cells is the efficiency with gains of up to 30% compared to Diesel generators and micro gas turbines for the same power output. When running on hydrogen, they also suppress any CO2 emission. Yet, gains in GHG emissions depend on the feedstock used for hydrogen production: electrolysis based on renewable electricity is cleaner than coal gasification, with biomass gasification and natural gas reforming sitting in-between. Orders of magnitude for hydrogen production are 110 equivalent gCO2/kWh for renewable electrolysis versus 1000 equivalent gCO2/kWh for natural gas reforming without Carbon Capture System.
Hydrogen properties introduce specific stumbling blocks. Its low density and safety issues require handling the fuel in liquid form, i.e. at temperatures below -100°C, which introduces specific constraints:
Electrification is a significant trend of e-mobility across the transportation sector. Electricity can be used on-board ships through shore power connections, supplying auxiliary power when the vessel is in port. This is sometimes referred to as ‘cold ironing’. Energy can also be stored in batteries and restored later at sea, reducing the ship’s CO2 emissions per load handling.
As for hydrogen-based propulsion, the net GHG gains are linked to the electricity production method. Producing electricity from renewable sources such as wind or sun produces very low CO2 emissions, while non-decarbonised electricity sources can negate the benefits.
Some demonstrators are currently testing this technology in the marine industry. For example, the Norwegian Electric Systems company is developing a hybrid engine for ships that combines a conventional internal combustion engine and an electric propulsion system based on lithium-ion batteries. Benefits and costs cannot be evaluated yet as the demonstration is at a very early stage.
Several new technologies can help reduce CO2 emissions from shipping, such as wind propulsion assistance, low-resistance hull coatings,…
Wind power includes many options: soft sails, kites, wind turbines, etc. If they lack the power to serve as an independent propulsion method, they can be used to assist in fuel savings.
Wind propulsion is more effective for small ships (< 10 tonnes). As they represent about 20% of world cargo ships, it could still play a significant role in reaching GHG emission targets. Several shipping companies have trialled sails on cargo vessels, but it remains an immature option that requires more safety and reliability developments.
Conversion of wind energy into electricity is also at an early development stage. Implementing wind turbines in the small power range is already used in some vessels to power lighting systems. However, introducing more powerful wind turbines for ship propulsion is more challenging because of the additional safety issues and the need for thermal management.
Several carriers also tested solar assistance, including hybrid sail systems that combine wind and sunlight. Nevertheless, the erosion of solar panels by the salty marine environment is a new topic on which no data are available. Consequently, the potential CO2 savings are difficult to estimate because the real-life efficiency loss with time is unknown.
Due to public perception and political restrictions, nuclear vessel propulsion is unlikely to develop, but from a purely technical point of view, nuclear is a zero-CO2 emission technology.
It can be achieved via a small on-board nuclear plant heating water to raise steam, which drives steam turbines and turbo generators. It has been extensively used for military applications, ranging from warships to submarines and estimations indicate that there are still about 150 naval nuclear reactors in operation. So far, there have only been four commercial nuclear vessels, and only one is still active: the Russian icebreaker Sevmorput.
Nuclear propulsion is highly unpopular due to safety concerns. Its implementation in commercial vessels would require specific training of highly qualified sailors and specific maintenance procedures, which are likely to impede commercial viability.
Although new propulsion methods will be introduced, internal combustion engines will remain a significant portion of maritime shipping in the coming decade(s). And despite their higher efficiency than their on-road counterparts, marine engine efficiency improvement still remains (Fig. 2). It will not be a simple technology transfer from on-road applications. Still, some general trends are likely to be reproduced. Future engines will undoubtedly be more complex, increasing maintenance cost and challenging equipment reliability. A vast array of new solutions, such as Common Rail injection systems, 2-stage turbocharging, Variable Valve Train or heat recovery, could be introduced to save fuel and comply with pollutant emission legislations. Yet, the actual operating conditions will affect their benefits, so specialisation concerning end-use is expected.

Figure 2- Global engine efficiency from the energy contained in the fuel toward useful work to move a ship
Combustion speed and timing are critical to the global efficiency (green and blue arrows in Fig 2) of fuel conversion into propulsion capacity. The laws of thermodynamics define a preferred timing for heat release, ideally through an instantaneous fuel conversion. However, actual fuel/air mixing and chemical conversion require a few milliseconds, reducing efficiency. Engine developments, therefore, notably aim to increase the speed of heat release up to limits drawn by safety, engine reliability, and control.
The core components for controlling mixing are the injection system and the turbulence inside the combustion chamber (determined by the chamber design). Increasing injection pressure is a simple way to accelerate fuel/air mixing and, subsequently, combustion. Lower fuel consumption can, therefore, be achieved up to the point where additional energy consumption for fuel pressure creation overcomes combustion benefits. The potential fuel consumption savings of increasing injection pressure are about 3-4 g/kWh.
Yet, injection pressure might also be dictated by pollutant emissions. Higher injection pressure reduces particulate emissions through better fuel/air mixing, but quicker combustion increases NOx emissions. Therefore, the selection of a specific after-treatment approach (see below) might push engine development towards a specific injection pressure strategy.
Modern Common Rail injection systems further allow splitting injections into multiple events, giving additional control on heat release and pollutant emissions. All modern on-road and off-road Diesel engines use this technology to optimise efficiency.
Increasing peak in-cylinder pressure provides efficiency gains but increases failure risks. Such an increase can be related to multiple technological approaches: compression ratio, boosting, and valve strategy. Yet, some marine engines already have peak firing pressures well above those of other vehicles, so it is unclear if a further increase is still worthy.
Engine power is defined by the amount of air and fuel that can be forced into the engine on the rated power operating point. Increasing efficiency and reducing pollutant emissions further emphasise airflow management and might require precise control over a broader set of conditions.
More air can be forced through the engine with turbocharging, which is widely adopted in marine engines. Further refinement with 2-stage turbocharging, including intermediate air cooling between compression stages is gaining interest. Yet, exclusive focus on rated power can lead to setups that inefficiently spool up to these rated conditions or struggle to operate under part-load conditions properly. Consequently, more advances in turbocharging systems such as Variable Geometry Turbine (VGT) that can adapt their operation to the engine demands might have a bright future.
Increasing the pressure of air fed to the engine with a turbocharger is not the only way to increase power output and efficiency. The valve opening strategy, which controls the timing of gas flow, has been kept relatively simple in marine engines. Introducing some variability in the valve opening profile would allow a high-efficiency Miller cycle at part load and a more conventional strategy for rated power. However, experience over the past 20 years in the automotive industry shows that significant gains in efficiency are obtained at the expense of reliability.
Interestingly, such approaches can be combined, as shown by the current development of high boost pressure and Miller cycle at various engine manufacturers. These approaches should significantly increase fuel consumption and CO2 reduction while maintaining or increasing the rated power.
About half the fuel energy released during combustion is lost rather than converted into propulsion work (Fig 2). A large portion is directly lost to the atmosphere through hot exhaust gases, often denoted as waste heat. The rest is mainly lost in the cooling and the lubricant systems.
Waste heat recovery converts such heat into further mechanical work or electricity. Two main approaches are under development:
While most approaches are feasible for any internal combustion engine, hydraulic recovery in turbochargers only targets large engines and is, therefore, more specific to marine applications. The latest version of Mitsui E&S Machinery Turbo Hydraulic System (THS) claims 2% fuel savings.
Fuel energy conversion into mechanical work includes sliding and rotating contacts, hence friction that increases fuel consumption and CO2 emissions. Lubricants are used to minimise contacts and reduce friction, with a trend towards lower and lower viscosity. Yet, lubricants also have additional roles, such as ensuring part cleanliness or protecting against wear. New fuels and new combustion strategies will change the lubricant operating conditions so that evolution of lubricant technology will be required.
Generally speaking, the best engine efficiency does not correspond with the lowest pollutant emissions. The most obvious example is NOx emissions: the best efficiency requires quick high-pressure combustion, which induces high in-cylinder temperature, while reducing NOx emissions requires low combustion temperature. There will, therefore, always be a trade-off between efficiency and NOx emissions.
NOx emissions can be reduced with alternative methods, such as recirculating burnt gases from the previous combustion or using exhaust after-treatment. Yet, even if this gives more flexibility, it does not suppress the trade-off. Recirculating burnt gases reduces NOx emissions quicker than efficiency, so there is an optimum to find. However, there will be a slight loss in efficiency to accept. Furthermore, recirculating burnt gases negatively influences particulate emissions, requiring further combustion degradation or dealing with an additional after-treatment device.
It is possible to choose a minimal degradation of combustion efficiency and mostly rely on flue gas cleaning to reduce NOx emissions. The most common NOx after-treatment technology is Selective Catalytic Reduction (SCR). A catalytic converter promotes a reduction reaction of NOx by a reducing agent. The reducing agent is generally urea or ammonia blended with water. In marine applications, the standard solution is AUS40, made of 40% urea blended with demineralised water.
SCR is not a simple technology as it relies on heat from exhaust gases to promote catalytic reactions. Therefore, the after-treatment unit needs to be located close enough to the engine, which might prevent easy retrofitting in some cases. SCR is also highly sensitive to catalyst poisoning by sulphur, a critical issue in marine fuels.
In addition to technological complexity and fuel restrictions, SCR also introduces the additional cost of AUS40 consumption. Investing in SCR is only economically viable at high fuel prices. Under cheap fuel circumstances, operators might prefer sacrificing some efficiency to reduce NOx emissions without an SCR system.
Marine after-treatment also includes a control device for particulate matter emissions, called a scrubber. Exhaust gases are forced through an alkaline scrubbing material that neutralises acidity and removes particulate matter. The collected material is stored and disposed of later.
There is current research to expand the realm of scrubbers by coupling them with the carbon capture storage (CCS) method, further reducing the CO2 emissions. Because such a process releases heat, it could be coupled with a heat recovery method to gain power and/or enhance fuel efficiency.
Not all fuel-saving methods are brand new technologies. Old sayings and recipes still hold: speed, size, beam, draught and length of a boat have a significant influence on fuel consumption and CO2 emission. While these have been used in the past to quantify economic benefits, they might be critical to future GHG emission management.
Large ships tend to be more energy-efficient per freight unit than smaller vessels because when the cargo capacity doubles, the required power only increases by two-thirds. Also, ship speed largely influences fuel consumption, as the required engine power output relates to speed with an exponent of 3 to 4. Slowing down a large ship is a simple way to reduce overall fuel consumption (CO2 emissions) per freight unit.
A 10% reduction in shipping speed is expected to result in a total average emissions reduction of 19%. The slow steaming advantage varies with the shipping category, routes, and duties. The best savings are obtained for vessels on long trade routes.
If slow steaming allows reducing CO2 emissions, it does not without consequences for vessel maintenance and reliability. The change in engine operating conditions gives rise to various problems such as deposits, cleanliness, and corrosion due to low temperatures and poor combustion (when applied to engines not initially designed for this purpose).
Speed reduction is covered via the EEDI and might be encouraged if emission reduction does not reach targets fast enough. Yet, mandatory shipping derating would be very unpopular with cargo owners, as they would have to reduce their turnover.
Bacteria attached to the underwater surface of ships attract seaweed, mussels, and other marine life. This attached marine life increases the ship’s drag coefficient and, therefore, fuel consumption. It is estimated that slime can add 2% to drag and weed 10%, which translates into 2% of fuel consumption per year.
Paints and hull coatings can reduce skin friction, and research is being done to prevent bacteria from developing on the hull. For many years, tin-based coatings have been used, but they are toxic to the environment, so they have been banned. Today, there are more eco-friendly options, such as epoxy, vinyl ester, and silicone elastomers. Nevertheless, these new materials are relatively expensive.
The marine industry has recently deployed digital tools mainly for financial optimisation, safety, and sustainability. Digitalisation also has excellent potential for reducing GHG emissions.
CO2 reduction is possible by optimising cargo capacity, shipping routes and cargo handling in a port. For example, Just-In-Time (JIT) arrival to port minimises time at anchorage, allowing optimisation of travelling speed and CO2 savings.
Nevertheless, digitalisation is developed by independent actors for their benefit without any global optimisation. There is room for more gains if worldwide GHG emission becomes the primary issue to tackle.
The marine industry needs to urgently reduce its CO2 emissions to align with the global concern for climate change. IMO has set objectives and provides guidelines for marine engine manufacturers and shipping companies. But the marine industry involves many different actors with an extensive range of vessel sizes, technologies, and ways of operating that need to comply with various constraints and policies. A unique solution is unlikely to emerge, but rather, a combination of solutions will need to be developed in parallel.
There is no shortage of technologies to reach such an objective. Still, a careful evaluation of each is required to ensure pollutant and GHG emission reduction at an economically-viable cost. Fuel selection is a real brainteaser with many possible business strategies. Shipping companies must decide between retrofits or massive investments in more advanced technologies for their marine engines. Such decisions must balance short-term operations with long-term planning of future steps as shipbuilding is a long-term investment.
In general, mobility and the global economy are currently at the edge of dramatic changes with many uncertainties and risks. It is time to take risks, invest smartly, be agile, and move quickly. Marine is a relatively risk-averse and very traditional business, and this transformation will be challenging. Only the companies with the best strategies can survive the new order in which green-branding will definitively be a key element.
Dr Cecile Pera- Automotive professional recognised and featured many times on LinkedIn as trendy in Automotive, e-mobility and many more. Dr Cecile Pera has more than 8,000 followers and generates original technical and business content with a global visibility of 1.5 million views/year.
You can view her professional website here: www.orovel.net/drcecilepera
Accurate energy measurement is a complicated and essential function in trade markets – gas being a compressible fluid; its measurement is more intricate. Metrology provides solutions to all gas measurement problems under three basic categories:
Metrology is the scientific study of measurement rooted in the political motivation to standardize units of measurement under CGPM (General Conference on Weights and Measures). CGPM is an intergovernmental treaty organization created under a diplomatic treaty called the Meter Convention, Signed in Paris in 1875. The Convention, modified slightly in 1921, remains the basis of all international agreements on units of measurement. Under the same convention, the BIPM (International Bureau of Weights and Measures) was incorporated in France to ensure the worldwide unification of physical measurement under the exclusive supervision of the CIPM (International Committee for Weights and Measures). The CIPM Mutual Recognition Arrangement (CIPM MRA) is the framework through which NMIs demonstrate the international equivalence of their measurement standards and the calibration and measurement certificates they issue. The outcomes of this arrangement are the internationally recognized (peer-reviewed and approved) Calibration and Measurement Capabilities (CMCs) of the participating institutes.
CIPM has recognized various RMOs (Regional Metrology Organizations as associations of NMIs) for implementing CIPM MRA as follows:

Geographical Distribution of Regional Metrology Organizations
International Standards Applicable to Commercial Gas Metering
Fiscal metering implies concern for finance, and policy is taken to mean the best accuracy in terms of international best practices. Gas Fiscal metering and Custody Transfer applications are covered under legal metrology and International Standards, as stated in this section.
ISO Standards
IEC Standards
(International Electrotechnical Commission for electronic instrumentation)
AGA – Reports
The following reports from the American Gas Association apply to various types of meters used to measure gas flow quantities:
API Standards
Commercial gas meters are required to accurately measure gas flow from one process system to another. A complete gas measurement, recording, and archiving system consists of Primary, Secondary, and Auxiliary elements.
Primary and Secondary elements are usually mounted on a Metering Skid fabricated per site requirements under ASME B 31.3. Auxiliary elements (except Transmitters and Calibration gas cylinders) are installed in a purposely built climate-controlled room under ISO Vibration Criteria. Such a climate-controlled room is designed and fabricated for equipment and operators’ safe operations under guidelines provided in ISO 11064 (also refer to ISO 10418:2019-Chapter 6). The following are important control parameters in the design of a climate-controlled room:
The primary element is a meter’s main flow-measuring component. Based on primary element classification, commercial meters are available in the following types.
a. Orifice Meter
An orifice meter generates a pressure differential when gas flows through a concentric (mostly used) orifice plate. The differential pressure signal and other data input from secondary and auxiliary elements are processed in the flow computer to calculate gas volume and energy content.
b.Turbine Meter
The turbine meter generates pulses when gas flow passes through the rotating turbine. These pulses, along with other data input from secondary and auxiliary elements, are processed in the flow computer to calculate gas volume as well as energy content.
c. Rotary Positive Displacement Meter
The rotary positive displacement meter passed the calibrated volume of gas in one rotation. The number of rotations thus provides the basis for the computation of gas flow through the meter at line conditions. The flow and energy content of the gas are corrected to standard measuring conditions through the processing of data input from secondary and auxiliary elements.
d. Coriolis Meter
Coriolis meter works on the principles of motion mechanics. Gas is split as it enters different sensor tubes of the meter, which get oscillations from a drive coil. Each tube oscillates in opposition to and at natural resonant frequency. Tube oscillations cause the generation of voltage sine-wave at its pickoff. Each tube generates a different voltage sine-wave, indicating the motion of one tube relative to the other. The difference in the period of each sine wave (Delta-T) is directly proportional to the mass flow rate through the meter. The Coriolis meter generates an inferential pulse train (electronically generated from a processor), which provides time-tagged gas flow snapshots. This data is processed in the meter processor to calculate the gas mass flow rate. The standard volume flow and energy rates are calculated by processing other data inputs from secondary and auxiliary elements.
e. Ultrasonic Flow Meter (Multi-Path)
The ultrasonic flow meter works on the principle of change in sound velocity in gas as the sound waves move IN or OPPOSITE to the direction of gas flow. Numerous sound wave transmitters and receivers are installed on the inner diameter of UFM (at the upstream end of the meter), with corresponding receivers and transmitters installed at the downstream end of the meter. Each pair of sound wave transmitters and receivers constitutes a single sound wave path. Multi-path meters have up to 12 pairs of transmitters and receivers. Difference (Delta-T) in the time the sound wave travels along the gas flow and opposite the gas flow is obtained. This delta-T is directly proportional to the gas flow rate through the meter. UFM generates an inferential pulse train (electronically generated from a processor), which provides time-tagged gas flow snapshots. This data is processed in the meter processor to calculate the gas volume flow rate at line conditions. The standard volume flow and energy rates are calculated by processing other data inputs from secondary and auxiliary elements.
Secondary elements are the components of a meter that provide additional information about flowing gas conditions in the pipeline to correct the measured flow rate to standard conditions. Following are the various types of secondary elements used in gas meters:
f. Flow conditioner
Used to create laminar flow for improved meter accuracy
g. Meter Tubes (for use with Orifice, Turbine and Ultrasonic meters)
Necessary lengths of tubes are required upstream and downstream of the meter to ensure laminar gas flow as it reaches the primary element.
h. Pressure Tap with Pressure Sensor
For sensing line pressure and differential pressures
i. Temperature well and Temperature Sensor
For sensing gas flowing temperature
j. Line Sample Tap with Chromatograph Sample Collector / Stinger & Hose
For continuous sampling of gas for online analysis by a chromatograph
k. Line Sample Tap with Water Analyzer Sample Collector / Stinger & Hose
For continuous sampling of gas for online analysis by water analyzer
l. Line Sample Tap with H2S / TS Analyzer Sample Collector / Stinger & Hose
For a continuous sampling of gas for online analysis by H2S / TS Analyzer
Auxiliary elements are the components of gas measurement, recording and archiving systems which are necessarily required to classify a meter as fit for “Fiscal Metering Applications”. For smaller-sized fiscal meters (used for commercial or domestic gas flows), data input requirements from various gas analyzers are key-punched into the meter’s flow computer. All auxiliary elements should be rated as Class-1 Compatible and NEMA 4 with IP 4 ingress protection during normal operations.
When used to generate financial statements or transactions, commercial meters are termed fiscal meters. There can be various fiscal applications, including:
All types of fiscal gas metering systems should be able to perform the following functions:
Fiscal metering systems that are used for Custody Transfer applications for gas service have the following additional considerations:
More on EPCM Gas
In a Heat exchanger, heat flows from the hot stream to the cold one. So, the hot fluid coming out of the exchanger is a little colder, and the cold stream gets a little hotter at the exit point without mixing. That is why heat exchangers are widely used to heat up or cool down a fluid stream in a processing plant.
Heat exchangers are classified as indirect and direct contact based on the heat transfer process.
In an indirect-contact heat exchanger, the fluid streams remain separate, and the heat transfers continuously through an impervious wall. Thus, there is no direct contact between thermally interacting fluids. This heat exchanger, also called a surface heat exchanger, can be further classified into direct-transfer, storage, and fluidized-bed exchangers.
In a direct-contact exchanger, two immiscible fluids under different temperatures come into direct contact, exchange heat, and are then separated. Typical applications of a direct-contact exchanger involve a mass transfer in addition to heat transfer, such as in evaporative cooling and rectification; means this exchanger involves phase change of working fluid, which enhances the heat transfer rate, this can be further classified into Immiscible Fluid Exchangers. Gas-Liquid Exchangers, Liquid-Vapor Exchangers. Compared to indirect-contact, direct-contact heat exchangers have the following advantages:
Tubular exchangers are widely used and manufactured in many sizes, flow arrangements, and types. They can accommodate a wide range of operating pressures and temperatures. They are used for gas-to-liquid and gas-to-gas heat transfer applications, mostly when the operating temperature or pressure is very high, or fouling is a significant problem. They are further classified as below:
Plate Heat Exchangers consist of two rectangular end members holding several rectangular plates with holes in the corner for the fluids to pass through. The plates are arranged alternatively so that hot fluid flows in 1, 3 and 5 numbered plates while cold fluid flows in 2, 4 & 6 numbered plates. This arrangement lets the hot and cold fluids exchange heat while not mixing.
Each plate is separated by a gasket, which seals the plates and arranges the flow of fluids between them. The plates are either smooth or have some form of a groove. This type of exchanger is generally used for low-pressure and low-temperature applications. The plate-type heat exchanger requires less installation and maintenance space than shell and tube-type equivalent surfaces. This type of exchanger is widely used in the food industry because it can quickly be taken apart to clean.

Fig 1: Plate Heat Exchanger
Heat exchangers are classified according to the flow arrangement. The simplest heat exchanger is when the hot and cold fluids move in the same or opposite directions. This heat exchanger consists of two concentric pipes of different diameters.
In the Parallel/Co-current flow arrangement, the hot and cold fluids enter at the same end, flow in the same direction, and leave at the same end. The streams flow parallel to each other and in the same direction. This is less efficient than countercurrent flow but does provide more uniform wall temperatures.
In the countercurrent flow arrangement, the fluids enter opposite ends, flow in opposite directions, and leave at opposite ends. The two fluids flow parallel to each other but in opposite directions. This type of flow arrangement allows the largest change in both fluids’ temperatures and is the most efficient. More heat is transferred in a counterflow arrangement than in a parallel-flow heat exchanger.

Fig 2: Flow arrangement and profile
Here, both fluids flow parallel and perpendicular to each other. In this type, efficiency lies between countercurrent flow and co-current flow exchangers. In these units, the streams flow at right angles to each other.
A heat exchanger is considered a single-pass unit if both fluids make one pass through it. Here, the fluid flows through the exchanger along its length once.
When the heat exchanger design results in either an extreme length, significantly low fluid velocities, or low effectiveness, a multi-pass heat exchanger are used, a fluid is considered to have made one pass if it flows through a section of the heat exchanger through its full length. After flowing through one full length, if the flow direction is reversed and fluid flows through an equal or different-sized section, it is considered to have made a second pass. Increasing the number of passes increases overall effectiveness and the pressure drop on the multi-pass side.
This exchanger usually consists of two concentric pipes. The inner pipe acts as the conductive barrier, where one fluid flows in the inner pipe, and the other flows in the annulus between pipes. They are also called hairpin, jacketed pipe, and jacketed U-tube exchangers. Flow in a double-pipe heat exchanger can be co-current or countercurrent. Double-pipe exchangers are generally used for small-capacity applications because they are cheap for both design and maintenance. They are simple, but they have low efficiency with the large space occupied on large scales. Therefore, many industries use more efficient heat exchangers like shells and tubes.

Fig 3: Double Pipe Heat Exchanger
Due to their flexibility, Shell and Tube Heat Exchangers are some of the most popular exchangers. In this type, two fluids have different temperatures, one flowing through the tubes (the tube side fluid) and the other flowing outside the tubes but inside the shell (the shell side fluid). Heat is transferred from one fluid to another through the tube walls, either from the tube side to the shell side or vice versa. The fluids can be either liquids or gases. This system handles fluids at different pressures; higher pressure fluid is typically directed through tubes, and lower pressure fluid is circulated through a shell side. The major components of this exchanger are tubes (or tube bundle), shell, front-end head, rear-end head, baffles, and tube sheets.

Fig 4: Shell and Tube Heat Exchanger
Spiral heat exchangers are generally used in chemical plants and are of circular construction. The spiral heat exchanger rolls two long metal plates around a central core to form a concentric spiral flow passage. The hot fluid flows in one channel, and just next to it, the cold fluid. This side-by-side flow is responsible for heat exchange between two fluids without mixing. The heat transfer rate associated with a spiral tube is higher than that for a straight tube. Thermal expansion is no problem, but cleaning is almost impossible. Like the plate exchanger, the spiral exchanger is compact and requires less installation and maintenance space.

Fig 5: Spiral Heat Exchanger
MOC for the heat exchanger depends on the types of fluids or vapours handled. It should have a definite corrosion rate. The material should exhibit strength to withstand operating temperature and pressure.
Pressure is one of the parameters that determines the thickness of components. The higher the pressure, the higher the thickness of pressure-retaining components. Design temperature indicates whether the material can withstand operating conditions.
Flow rates determine the flow area. Flow rates should be kept quite high for obtaining a higher flow area.
Exchanger effectiveness is the main factor affected by flow arrangements, whether it is co-current or countercurrent.
The heat exchanger’s thermal effectiveness is the ratio of the heat transfer rate to the maximum possible heat transfer rate.
It is an important parameter in heat exchanger design. High-pressure drop results in high pumping power, which ultimately increases the cost. On the other hand, the pressure drop also creates turbulence, which increases the heat transfer coefficient.
The fouling of heat exchangers may be defined as the deposition of unwanted material on heat transfer surfaces, impacting its performance. Fouling increases the resistance to fluid flow and lowers the heat transfer coefficient of heat exchangers. Fouling also increases the pressure drop across heat exchangers.
The cost of a heat exchanger includes the initial price of the equipment and the installation, operational, and maintenance costs of the device lifespan. At the same time, choosing a heat exchanger that effectively fulfils the applications’ requirements is necessary.
1] https://en.wikipedia.org/wiki/Heat_exchanger
2] Walker, G. (1982) Industrial Heat Exchangers-A Basic Guide, Hemisphere Publishing Corporation. DOI: 10.1002/aic.690290228
3] http://www.thermopedia.com/content/832/
4] Saunders, E. A. D. (1988) Heat Exchangers “Selection, Design and Construction, Longman Scientific and Technical. DOI: 10.1016/0378-3820(89)90046-5
5] http://thepipingtalk.com/2019/11/types-of-heat-exchanger-according-to-construction/
Consideration for Solar Powered Rainwater Harvesting System: South Africa has an estimated population of 54 million people, with an estimated 40% of this population living in rural settlements1 (MIT, 2016) (Stats SA, 2016). 74% of the people living in these rural areas rely solely upon groundwater, accounting for only 9% of the total water in use in South Africa due to a lack of water infrastructure (MIT, 2016). 19% of the rural population has no clean water supply, and 26% of schools and 45% of clinics have no water access (MIT, 2016).
Rainwater is a clean source of water that can be harvested to solve the need for potable water in rural areas (About, Inc., 2017). Rainwater is considered a clean water source due to its lack of contaminants and hard metals. The rainwater can become acidic depending on the location (EPA, 2017). Though the acidic part of rainwater is bad for metals and machinery, it is suitable for human consumption if filtered properly. The rainwater is polluted further by flowing from the catchment areas. Pollutants in these catchment areas include leaves, dust particles and droppings of various animals. Due to these pollutants, it is necessary to filter and purify the water according to the SANs 241-2015 standards for the water to be classified as potable water (HarvestH2o, 2017).
Rural areas are often found in areas of the country where there is little to no infrastructure in terms of water and electricity supply (ETU, 2017). To overcome this, a system design must be self-powered and automated.
Investigate the possibility that a rainwater harvesting system can provide reliable potable water for a rural household. A system design that does not require external power and is simplistic in operation is needed. Test whether the addition of a slow sand filter in such a system design is a viable solution.

FIGURE 1: SCHEMATIC DRAWING OF RAINWATER HARVESTING SYSTEM
The research project consists of a detailed literature study on relevant information. System diagrams were designed based on this literature study. The necessary design calculations were done to ensure these designs could function. A simulation was performed to test whether water received from rainwater
harvesting can fulfil potable water requirements for a rural household. Two different filtration techniques were chosen to test which technique would allow the overall system design to be solar-powered and automated. A water quality test was done to ensure the filtration technique chosen will meet the SANS 241-20152 standards for human consumption.
A better understanding of rainwater harvesting is essential before any design or experimental procedures can be completed. Information about the required design stages will be investigated. Breaking a rainwater harvesting system into its separate stages will allow a better understanding of the type of components, filtration techniques, and pumping required at certain stages. All this research will aid in designing a self-powered rainwater harvesting system that will deliver potable water to a small household in a rural area.
Rainwater harvesting is not a new concept, but because municipal water has been plentiful and of good quality, the modern generation has forgotten that many of our forefathers only had rainwater as a source of drinking water. We now have to re-discover the process of harvesting rainwater and apply modern technology and sophistication to supplement the dwindling supply of water (Tizagenix, 2017).
Harvesting rainwater is a very simple process and requires minimal effort. Once the fundamental components are installed, the weather will take care of the rest. Rainwater is usually captured by any roofed area, i.e. the roof of a house (Tizagenix, 2017). After the rain is collected on the roof, it flows through the following process steps:
These process steps need to be followed to design a successful rainwater harvesting system. Below is a description of the components used in the experimental rainwater harvesting system.
The WISY filter, as seen in Figure 2: Schematic drawing of WISY filter operation, is a primary filter used in rainwater harvesting systems. It filters away particles larger than 28 microns, ensuring that only clean filtered water enters the storage tank. Removing large particles will increase the tank’s lifespan and stop biomatter growth inside the tank. The WISY filter operates at 95% efficiency, meaning that only 5% of water passed through the filter is lost through the flush line.

FIGURE 2: SCHEMATIC DRAWING OF WISY FILTER OPERATION
The WISY filter, as seen in Figure 2: Schematic drawing of WISY filter operation, is a primary filter used in rainwater harvesting systems. It filters away particles larger than 28 microns, ensuring that only clean filtered water enters the storage tank. Removing large particles will increase the tank’s lifespan and stop biomatter growth inside it. The WISY filter operates at 95% efficiency, meaning that only 5% of water passed through the filter is lost through the flush line.

FIGURE 3: SCHEMATIC DRAWING OF CALMING INLET
Fine sediment carried in by the inflowing rainwater settles on the tank’s floor. This layer harbours microbes that provide a natural treatment to the water inside the tank; thus, it is referred to as the bio-layer. A calming inlet, as seen in Figure 3: Schematic drawing of Calming inlet, slows the incoming water and diverts it away from the bio-layer, thus preventing the inflowing water from disturbing the bio-layer. The calming inlet is placed at the bottom of the tank.

FIGURE 4: DESCRIPTION OF A FLOATING SUCTION
The floating suction sits just below the water’s surface and will draw water from the top level. Figure 4: Description of a floating suction illustrates how it is placed inside a tank and how it looks. The top layer of water is the oldest and cleanest water in the tanks. It has the lowest concentration of entrained particulates and has had the longest ‘treatment’ time with healthy natural microbes.

FIGURE 5: FILTER COMPONENT USED FOR SKIMMING OVERFLOW
Some of the debris and contaminants float to the surface, forming a floating debris layer. Debris, such as pollen and oil-based matter, form a floating layer on the water surface. This builds up over time and eventually insulates the water from the air. This prevents oxygen transfer into the water, reducing the amount of aerobic microbial action. The overflows are designed so that the floating debris will get discharged out of the tank when the tank overflows. Figure 5: Filter component used for Skimming overflow shows a typical skimming overflow that will be installed inside water tanks.
After the rainwater has been harvested and collected in a storage tank, it needs to pass through a post-filtration stage to ensure it is safe for drinking. This experimental study will use a slow sand filter for its post-filtration stage. A slow sand filter was selected because it does not require a pump to force the water through the filter, as it is run by gravitational force (SSWM, 2017).
The slow sand filter will be tested and compared to current modern filtration techniques to determine if it is a viable solution to the post-filtration stage of rainwater harvesting.
Slow sand filtration has been an effective water treatment process for preventing the spread of gastrointestinal diseases for over 150 years, having been used first in Great Britain and later in other European countries (American Water Work Association, 1991).
Slow, sad filters were mostly used to filter water for large settlements before the Industrial Revolution. These filters were designed and built on a large scale and had to filter water for entire towns and cities (American Water Work Association, 1991). India launched a project to design and build slow sand filters on a small scale for low-income areas to use to filter their drinking water. These filters had several design flaws. People had to carry water to where the filters were located and could only filter a bucket of water at a time. The filters were often not operated properly because of the lack of understanding, which led to them running their sand beds dry and not functioning (Bio Sand Filter Organization, 2004). The Indian Slow sand filter can be seen below in Figure 6.

FIGURE 6: BIO SAND FILTERS LAUNCHED IN INDIA (BIO SAND FILTER ORGANIZATION, 2004)
Traditionally, a slow sand filter consists of a filter vessel, namely a concrete box, the sand bed, and the required inlets and outlets for the water to flow. A typical design for a slow sand filter can be viewed in Figure 7 below.

FIGURE 7: TYPICAL DESIGN OF A SLOW SAND FILTER (SSWM, 2017)
The design and layout of the sand bed is depicted in Figure 8: Sandbed design below:

FIGURE 8: SAND BED DESIGN (ITACANET, 2005)
The basic principle of the process is very simple. Contaminated fresh water flows through a layer of sand, where it gets physically filtered and biologically treated. Hereby, both sediments and pathogens are removed. This process is based on the ability of organisms to remove pathogens. The top layers of the sand become biologically active by establishing a microbial community on the top layer of the sand substrate, also referred to as schmutzdecke3. These microbes usually come from the source water and establish a community within a few days. The fine sand and slow filtration rate facilitate the establishment of this microbial community. Most of the community are predatory bacteria that feed on water-borne microbes passing through the filter (American Water Work Association, 1991).
Slow sand filters consistently demonstrate their effectiveness in removing suspended particles with effluent turbidities below 1.0 nephelometric turbidity units (NTU), achieving 90% to 99% reductions in bacteria and viruses and providing virtually complete Giardia lamblia cyst and Cryptosporidium oocyst removal (Tech Brief, 2014). A more detailed look at the effectiveness of the slow sand filter can be viewed in Table 1 below:

TABLE 1: TREATMENT PERFORMANCE OF SLOW SAND FILTER (AMERICAN WATER WORK ASSOCIATION, 1991)
In potable systems, the following post-filtration steps are implemented (GERM Africa, 2017):
Various methods are used to remove fine particulates from the water. We generally filter all particulates larger than 1 micron from the water. In some domestic installations, a back-washable sand filter that removes particulates larger than 80 microns is the first step, followed by a 20-micron pleated cartridge filter and a 1-micron pleated cartridge filter.
The activated carbon and KDF units treat the water for any residual colour and odour. They also remove chlorides and heavy metals.
The UV sterilizer kills 99.9% of all microbes that might still be present in the water.
The above steps are scalable and can be applied to large industrial-scale installations and small domestic systems.
Forced Filtration consists of a multistage filtration process to ensure the best quality of potable water. A typical layout of such a system can be viewed in Figure 9: Schematic depicting a forced filtration setup. The forced filtration setup comes at a large additional cost and power usage. A large external pump is required to deliver the required pressure for the filters to work, and the UV light requires additional electricity. The filters and UV lightbulb have a set lifetime and must be replaced at the end of each lifetime. This escalated the cost of such a system dramatically (GERM Africa, 2017).

FIGURE 9: SCHEMATIC DEPICTING A FORCED FILTRATION SETUP
The typical household (2 adults and three children) in South Africa uses about 250 litres of water a day. That amounts to 7,500 litres a month, already more than the monthly free water allowance every household receives from the municipality. The typical South African household consisting of 3 children and 2 parents would then use an average of 37,500 litres of water per month (Aquarista, 2017).

FIGURE 10: AVERAGE FAMILY WATER CONSUMPTION
The average water consumption can then be divided into various fields depending on the water used. For the purpose of this research, project interest is only shown where potable water is needed, i.e., for bathroom and kitchen uses, as shown in Figure 10: Average Family Water Consumption.
For the system to be fully automated and provide potable water for the household inside the house, an element of pumping will be required. This pump will require a power source, and due to the lack of electrical infrastructure in rural areas, it has been decided to make the system solar-powered.
There is no such thing as a perfect technology. Research reveals the different factors that can affect the efficiency of solar panel mounting systems. Some of these factors have been studied to either increase or decrease the power production from the three types of mountings such as sun intensity, cloud cover, relative humidity, and heat buildup. When the sun is at its peak (intense), during midday, most solar energy is collected; therefore, there is an increase in the power output. Cloudy days contribute to the decrease in sunlight collection effectiveness since clouds reflect some of the sun’s rays and limit the amount of sun absorption by the panels. During summer days, when the temperature is at its highest and heat is built up quickly, the solar power output is reduced by 10% to 25% for the reason that too much heat increases the conductivity of semiconductors, making the charges balance and reducing the magnitude of the electric field. In addition, if humidity penetrates the solar panel frame, this can reduce the panel’s performance, producing less power and, worse, can permanently deteriorate the modules’ performance (Gordo, Khalaf, & Strangeowl, 2015).
Figure 10 below is a solar map of South Africa depicting the solar energy available in the different areas of the country.

FIGURE 11: SOLAR MAP OF SOUTH AFRICA (SOLAR SCENE, 2016)
Figure 11: Solar map of South Africa indicates that coastal areas have less available solar energy than inland areas. The coastal areas offer enough to power a small-scale system that does not require a lot of power and does not require solar energy every day. Therefore, a battery will be required to design a solar system close to the coast.
A charge controller is a voltage and/or current regulator that keeps batteries from overcharging. It regulates the voltage and current from the solar panels to the battery. Most “12 volts” panels put out about 16 to 20 volts, so the batteries will be damaged from overcharging if there is no regulation. Most batteries need around 14 to 14.5 volts to get fully charged (Wind & Sun, 2017)
From the literature about rainwater harvesting, it is clear that the appropriate steps have been taken to harvest and use rainwater. Ensuring all primary processes are in place made the system more efficient and reliable.
Post-filtration is essential for this system design, and the experimental test to follow will prove whether the literature about slow sand filters can be applied to a system design such as this one.
The information discussed above will be used to implement a functioning solar power rainwater harvesting system to deliver potable water to a rural household via a slow sand filter.
A rainwater harvesting system was designed following the correct process steps in the literature review. To design the system to be fully automated and powered by solar power, it was decided to use a slow sand filter in the post-filtration stage. A second system was designed using a more
conventional filtration technique, forced fines filtration, to see how the slow sand filtration technique would measure up to conventional techniques.
Both systems were designed using the same rainwater harvesting processes. The only difference is the postfiltration techniques.
Flow diagrams were drawn using AUTO CAD to give a clear idea of how the experimental setup would be constructed.

FIGURE 12: CONCEPTUAL FLOW DIAGRAM OF SSF SYSTEM

FIGURE 13: ZOOMED IMAGE OF SLOW SAND FILTER FLOW DIAGRAM

FIGURE 14: 3D VIEW OF EXPERIMENTAL LAYOUT
Figure 13 depicts a three-dimensional view of the layout for the proposed system. The figure shows that the 1000L storage tank is above the slow sand filter drum. This is due to the layout of the chosen location where the experimental procedure is to take place. This height difference is enough to allow the outlet from the storage tank to be the same height as the inlet to the slow sand filter. Therefore, there is no need to construct a stand for the storage tank to be placed on.

FIGURE 15: CONCEPTUAL FLOW DIAGRAM OF FORCED FILTRATION SYSTEM

FIGURE 16: ZOOMED IMAGE OF FILTRATION UNIT FOR FORCED FILTRATION
The information about the two different system diagrams indicates that the slow sand filter design will be better suited for the application in a rural settlement environment. Due to its low energy requirements, low cost, easy maintenance, and simplicity, the slow sand filter design will be preferable. To establish if the slow sand filter system design is effective, it must be tested against the conventional forced filtration method. Therefore, both systems will be manufactured and tested.
A test needed to be performed to establish if harvesting rainwater can supply enough water to satisfy a rural household’s potable water needs. Rainfall is dependent on weather patterns and is always changing. A Matlab Simulink model was created to perform this test and consider the ever-changing rain patterns.
The Simulink model will use daily rainfall data from the last ten years in the Amanzimtoti area. This dataset provides a large enough data population to determine accurate mean values for daily rainfall. The dataset considers outliers, i.e., Freak storms or droughts, but will not consider the global weather change over the last century. The dataset was gathered by a national weather station located in Amanzimtoti (SA Weather Service, 2017).
The Simulink model will create a forecast of the daily rainfall over a period of a year in the Amanzimtoti area. The forecast model can be viewed below in Figure 17: Forecast model for daily rainfall. The block diagram design of the Simulink model can be viewed in Appendix G.

FIGURE 17: FORECAST MODEL FOR DAILY RAINFALL
Another valuable piece of information needed to complete the test is the average daily potable water consumption that will take place. The literature review shows that a family of 5 uses approximately 250L of water per day (Aquarista, 2017). This equates to 50L per person. Using Figure 10: Average Family water Consumption, the amount of potable water usage was calculated using only the water used in the bathroom and the kitchen, as the other water uses do not require the water to be of potable standards:
![]()
It should be noted that adding up all the rain throughout the year and dividing it by the amount of water usage will not give an accurate result as a number of variables need to be accounted for. These variables include the roof area that will be used for harvesting rainwater, the efficiency of the prefiltration method, the storage tank volume and the tank overflow periods. The Simulink model allows inserting the values of the roof area, storage tank volume and daily water consumption. It uses the calculated forecast model with these variables to run the simulation. The results from the simulation show the tank level throughout the year. It also indicates the overall system efficiency, total water harvested and total water lost.
To run an experimental procedure, a small roofed building had to be selected for the location of the experiment. A backroom in the yard of Manna Hoogenboezem was selected as the experimental building. It yielded the same environment as rural area households with a roof area of 35 sqm and corrugated iron roof sheeting. The building lies in an area of densely populated trees and plant growth. Animal life, birds and monkeys are also present. It has one bedroom a small kitchen and a bathroom, ideally suited for one person to live there. Therefore, the chosen building correctly represents the intended rural household.
The following information was used to simulate the experimental procedure:
The simulation used the information above and the forecasted rainfall model to predict the tank level throughout the year. The result can be viewed in Figure 18:

FIGURE 18: TANK LEVEL THROUGHOUT THE YEAR
Figure 18 above shows that harvesting rainwater can provide enough water to supply the potable water needed throughout most of the year. It is clear that in the winter months, with less rainfall, there will be a shortage. The supply will be sufficient if water management is implemented throughout these months.
To verify that the simulation is correct, actual rainfall data were recorded throughout the experimental timeframe (19th February 2017 – 11th May 2017). This data set could then graphically be represented against the predicted rainfall data for the same period. Figure 19 below shows the resultant comparison:

FIGURE 19: PREDICTED RAINFALL VS ACTUAL RAINFALL COMPARISON
Figure 19: Predicted rainfall vs actual rainfall comparison shows that the actual rainfall in the experimental time frame follows the same pattern as the predicted rainfall. Figure 19 proves that the simulation model used is accurate and correct. From the predictions made by the simulation, it can be stated that harvesting rainwater will supply sufficient water to satisfy a rural household’s potable water needs.
Before the systems in section 3 could be built, a number of design calculations had to be completed to ensure they would perform as required.
As discussed in the literature review section 4.2.7, for the Schumtzdecke to be effective, the water passing through the sand filter needs to flow at a constant slow flow rate. Therefore, a hydraulic loading rate of 0.4m/h was chosen to design the sand filter. Equation [1] can calculate the required flow rate into the sand filter.
[1]
![]()
Part of the system design’s automation process is placing the harvested rainwater storage tank above the slow sand filter. This will allow gravity to feed the water into the slow sand filter. As seen in the literature study on slow sand filters, the flow through the filter must be controlled for the filter to work effectively. To keep the flow restricted below 19.63l/h, as calculated in section 4.1, it was decided to design and install an orifice. The operation of an orifice is depicted in Figure 20 below.

FIGURE 20: SCHEMATIC DRAWING OF AN ORIFICE DESIGN
The flow rate through an orifice plate can be determined by the use of equation [2] as stated below (White, 2011):
[2]
Using the properties and dimensions listed in Table 2 below, the required pressure drop across the orifice plate could be determined:

TABLE 2: PROPERTIES TO CALCULATE ORIFICE DIMENSIONS
The static pressure before the orifice is calculated using equation [3] derived from Bernoulli’s equation:
[3]
The pressure after the orifice plate is calculated using the required flow rate into the slow sand filter and with equation [4]:
[4]
The discharge coefficient depends on the Reynolds number of the flow through the orifice plate. The Reynolds number is determined using equations [5] and [6] as seen below:
[5]
[6]

FIGURE 21: DISCHARGE COEFFICIENT FOR THIN PLATE ORIFICE WITH D: 1/2D TAPS (EMERSON ELECTRIC CO, 2017)
The results from [6] were used together with Figure 21: Discharge Coefficient for thin plate orifice with D: 1/2D taps to determine the discharge coefficient for different diameter orifice plates. As the size of the orifice increased, the discharge coefficients ranged from 0.605 to 0.62.
These values, together with the known required flow rate, were used in an Excel spreadsheet to determine the required orifice plate diameter.
The Excel spreadsheet proved that the required orifice plate diameter is 3mm. Therefore, a 3mm diameter orifice was installed in the experimental setup.
Using the calculated 3mm diameter orifice and equation [2], a new spread was set up to determine the flow rate into the slow sand filter at the different levels of the storage tank. This was done to ensure the flow rate never exceeded the recommended 19l/h and to determine the lowest flow rate that would flow into the slow sand filter. The resultant data can be viewed in Figure 22.

FIGURE 22: FLOW RATE THROUGH ORIFICE AT DIFFERENT TANK LEVELS
An experimental test was run to verify the calculations above. Water flowed from the tank through the installed orifice into a 20l bucket for an hour. This procedure was followed for three different tank levels. The water in the bucket was measured and recorded after the test. The data can be viewed in Figure 23 below:

FIGURE 23: EXPERIMENTAL DATA FOR FLOW THROUGH ORIFICE PLATE
As seen in Figure 22, the calculated flow rate never exceeds the recommended 19.63l/h. This information is verified by the experimental data in Figure 23, which shows that the experimental flow rate follows the same curve as the calculated flow and does not exceed the recommended value. Figure 24 shows the chosen orifice plate to be installed.

FIGURE 24: CHOSEN ORIFICE, DIAMETER OF 3MM
The system design aims to make the system as automated as possible, but a pumping system will be required to supply water to the household.
The goal for the SSF system layout is to use as little electrical energy as possible. However, potable drinking water must still be delivered to the household at pressure. To accomplish this and use less energy, the proposed layout uses a small pump that pumps the water at a low flow rate to a storage tank at the roof height of the house. The water is then supplied to the household, using gravity to supply the pressure.

TABLE 3: PROPERTIES FOR PUMP SELECTION
To solve for the system requirements, Bernoulli’s equation is used as seen in equation [7] below:
[7]
Where hp is the head increase across the pump. But since P1=P2 and V1=V2=0, solve for the pump head:
[8]
There is no specified flow rate for the system design, but to save power, the flow rate should be specified as low as possible while still being able to pump the maximum daily water consumption. Therefore, the maximum required flow rate will be 200l/day.
[9]
Now list and sum the minor loss coefficients:

TABLE 4: MINOR LOSS COEFFICIENTS FOR PIPE FITTINGS (WHITE, 2011) (ENGINEERING TOOLBOX, 2017)
Calculate Reynolds number and pipe friction factor using equation [6]:

Therefore, the flow in the pipe is the laminar flow:
[10]

The above calculations calculated A system requirement curve for different flow rates.

FIGURE 25: SYSTEM REQUIREMENT CURVE

FIGURE 26: PUMP CURVE (FLOWJET, 2017)
Figure 25: The system requirement curve the pump must satisfy for the design to function. Figure 26: The pump curve shows the pump curve for the 12V solar pump Xc Trading Model XC-SP-002-12C. Figure 26 indicates that the chosen pump will deliver the required head at the required flow rate as the supply points exceed the required points. Therefore, the chosen pump will function in this design.
To pump the water at the required rate and height, the pump must displace the water of:
[11]
This is the pump’s theoretical power requirement. Experimental pressure and flow rate readings were taken; see Table 5 for results. This data can then be used to calculate the pump’s power requirement.

TABLE 5: EXPERIMENTAL DATA COLLECTED
Therefore, the actual power requirement from the pump is calculated to be:
[12]
The pump is the only component that requires electrical energy to operate. The pump’s power will be supplied by a 12V battery that will be charged by a solar panel. Calculations were done to verify how effectively the chosen components would power the system.
The components include a solar pump, a 12V battery and a 40W solar panel. These components were selected as they were available for use to complete the experimental procedure and did not have to be purchased. The specifications of these components can be found in Table 6 below. The specifications of the components were listed as designed by the manufacturing companies.

TABLE 6: COMPONENT SPECIFICATIONS
The pump will run for three 5-minute cycles per day to satisfy the required 20l per day water usage, which adds up to 0.25 hours of run time.
[13]
With the installed solar charge controller, the battery can only drain 50% of its capacity.
[14]
7 days run time is enough to keep the pump running throughout cloudy and rainy days when no solar charge is available. When the sun does come out, the battery can be charged:
[15]
Considering the losses in the solar panel and the sun factors, the time required to charge the battery is 5 hours. As there are only 6 hours of effective sunlight in an average day, it is safe to assume the system will only require one sunny day to recharge and be ready for the next 7 days.
As discussed in the literature, the slow sand filtration process depends on the biolayer that grows on the top layer of the sand bed. Over time, this layer will become too densely populated and block water flow through the filter. At this point, the user will have to scrape off the top layer of sand and wash it (American Water Work Association, 1991).
Layer piezometers have been installed in the experimental setup so the user knows when to clean the sand. These piezometers will indicate the head loss across the sand bed. The maximum allowable head loss can be calculated using Darcy’s law as seen in equation [16] below:
[16]

FIGURE 27: HEAD LOSS THROUGH POROUS MEDIUM
Figure 27: Head loss through porous medium indicates how equation [16] was implemented on the experimental setup.

TABLE 7: HYDRAULIC CONDUCTIVITY OF DIFFERENT MATERIALS (STRUCTX, 2017)
The hydraulic conductivity, K, is a constant for a given porous medium. A very porous medium with little resistance to flow will have a high value for K, while a tightly packed medium with high resistance to flow will have a low value for K.
The slow sand filter is specified to operate at a hydraulic loading rate of 0.1 – 0.4 m/h. Therefore, if the HLR is below 0.1m/h, the sand bed can be declared blocked and needs cleaning.
Therefore, using Equation 12, Figure 4, and Table 5, the maximum allowable head loss through the sand bed can be calculated as follows.

Therefore, it can be stated as the Schmutzdecke becomes more populated, the top layer of sand becomes more blocked. This will decrease the hydraulic conductivity of the sand. If the same flow rate is required through the filter, the head loss across the filter bed will increase. This head loss can be viewed on the piezometers installed on the sand filter. The head-loss required for the user to know when to clean the sand bed will differ from system to system as the sand will vary. An installed system should be monitored and checked regularly, for when the flow rate out of the sand filter reaches as low as 4.91e-03m3/s, the filter bed needs to be cleaned. At this point, a mark can be made on the piezometers so that they can be monitored for that particular sand filter in the future.
A filtration skid was provided to complete the experimental procedure for the forced filtration system setup. Forced fines filtration systems are common in households around the world. They all operate under the same principle as described in the literature study.

FIGURE 28: SYSTEM REQUIREMENT CURVE
The pressure drop across the filtration system was measured by reading the pressure at the pump outlet and after the entire filtration skid. As the filtration skid is located at the point of water usage, the frictional energy loss was assumed to be minimal. Therefore, the pressure drop across the filtration system can be assumed to be the system requirement curve, as seen in Figure 28.
It should be noted as the filters become dirty over time, they increase the resistance of the filtration system. Therefore, it is important that the chosen pump can deliver the required flow rate through the dirty filters.

FIGURE 29: PUMP SUPPLY CURVE (SHIMGE, 2017
The chosen pump for Tizagenix small-scale filtration skids is a Shimge QT Peripheral Pump .37kW. The pump curve for the chosen pump can be viewed in Figure 29 on the QT37 line. Figure 29 indicates that at a flow rate of 50l/min, the .37kW pump will provide enough head to supply the filtration skid even with dirty filters.
5.2.2 Power supply
To pump the water at the required rate and height, the pump must displace the power of the water of:
[11]
The pump is not the only component that requires electrical energy to function. An 11W UV light bulb also needs power.
That leaves the total energy requirement of the system to be 112.98W.
The system will run for three 10-second cycles daily to satisfy the required 20 litres of water daily. This adds up to 0.00833 hours of run time.
[13]
With the installed solar charge controller, the battery can only drain 50% of its capacity.
[14]
Two days run time is insufficient to keep the pump running throughout cloudy and rainy days when no solar charge is available. A bigger battery system will be needed to keep the system operating longer without charge.
Due to the short power supply time and the fact that the pump and UV light require 220V AC current, it was decided to plug the system into the household’s power supply for the experiment. This was done to avoid buying additional batteries and inverters.
The design calculations have proven that the forced filtration can be solar-powered but requires 100 times more energy than the slow sand filtration setup.
After the designs of each system were verified with the necessary calculations, the experimental setup of each design could be assembled.

FIGURE 30: WATER STORAGE TANKS BEING PREPPED

FIGURE 31: GUTTER NETWORK WITH WISY FILTER CONNECTION

FIGURE 32: TANK FITTINGS INSTALLED

FIGURE 33: CALMING INLETS AND DRAINAGES

FIGURE 34: GRAVEL AND SAND USED IN SSF

FIGURE 35: INTERCONNECTION OF SYSTEMS

FIGURE 36: FLOAT VALVE

FIGURE 37: FLOAT SWITCH
After the building procedure, rainwater was allowed to run into the sand filter and fill the sand bed. All valves were closed, and the water was allowed to stay in the filter for 4 days. This was done to give the bio-layer a chance to grow. After this initiation period, the system was allowed to run. Twenty litres of water were drained from the top storage tank daily to simulate the daily water consumption. Section 7.2 will highlight the procedure to take weekly water samples to test the system’s water quality.
Several errors were noticed throughout the system’s run time and must be addressed.
After the first two weeks of run time for the system, it was noted that it was filtering the rainwater, and the bacteria count was decreasing. The 3rd week’s water sample result showed that after the filtration process, the water contained more bacteria than the pre-filtered water. Inspection of the system revealed that leaves and other bio-matter had managed to enter the storage tanks via the openings and doors. The system was drained and cleaned. The slow sand filter was isolated so as not to disrupt the Schumtzdecke. After resetting the system, the storage tanks were sealed off with plastic bags to ensure no bio-matter could enter again and influence the water quality. The system was allowed to run again.
After the water sample was taken on March 17th, the water quality started to worsen again. A good look at the experimental setup was done, and a number of errors were found that needed to be addressed. These errors included blocked gutters and incorrect sand sizes.
The area in which the experimental setup is located is surrounded by a dense population of trees, which simulate real-life circumstances. These trees cause the gutters to fill to the brim with leaves. As these leaves blocked the gutters, they lay in stagnant water. Therefore, the leaves caused less water to enter the system when it rained but also caused rotten water to enter the tank and contaminate the rest of the stored water.

FIGURE 38: BLOCKED GUTTERS
The gutters in Figure 38 were cleaned, and the system was cleaned out and reset to remove the contaminated water.
After analyzing the experimental setup for possible flaws, it was noted that the sand in the top layer of the sand bed did not conform to the standards made clear in the literature. Therefore, the slow sand filter was operating and filtering the water but not effectively enough, as the top layer of sand particles was bigger than specified and did not allow the Schmutzdecke to form properly.

FIGURE 39: WASHING AND SORTING OF INCORRECT SAND SIZES
The sand bed was removed from the filter drum and washed, as seen in Figure 39 above. Plaster sand was considered a replacement top sand as it is much finer in particle size than river sand. However, plaster sand contains high amounts of clay and is not clean enough to work inside the slow sand filter.
The fine beach sand was then selected for the replacement in the filter box. The sand was properly washed and entered at the correct depths and specifications. The filter was filled with rainwater and left for 4 days for the Schmutzdecke to be re-established. The system was run as usual after the initiation period was over. Water samples were taken once a week and proved that the corrections made a difference as the samples returned zero bacteria count for the filtered water.

FIGURE 40: QT PERIPHERAL PUMP

FIGURE 41: SUBMERSIBLE PUMP WORKING WITH FLOAT SWITCH

FIGURE 42: INSTALLED FORCED FILTRATION SET
Once the forced filtration system was installed, it was tested. All components functioned according to the design. A water sample was taken of the post-filtered water, and the micro-slide proved that no bacteria were present in the water after the filtration. Thus, no further adjustments were needed to be made to the system layout.
Section 4 of the report proves that rainwater harvesting can provide enough water to satisfy the potable water needs of a small household. A simulation was performed to prove this fact, and it was verified by recording the actual rainfall over the experimental time frame from 19 February 2017 to 11 May 2017. The recorded actual rainfall can be viewed in section 4 under Figure 19: Predicted rainfall vs. actual rainfall comparison.
Rainfall was measured by a rain gauge on the same property as the experimental setup. No trees or buildings obstruct the rain gauge to ensure accurate data was recorded. The rain gauge was emptied every day, and the reading was recorded. The rain gauge can be viewed below in
Figure 44.

FIGURE 43: RAIN GUAGE
Part of the objective of this research study was to determine if a slow sand filter can purify rainwater to potable standards. To test whether this is possible, water samples were taken. Sending a water sample to a lab and getting it analyzed is very expensive and takes time. Therefore, a basic water quality test was performed using Mikrocount Combi test slides, as seen in Figure 45, while the experimental setup was fine-tuned.

FIGURE 44: MIKROCOUNT COMBI TEST KIT
The quality test was taken once weekly for the duration of the experimental period. These samples are taken by dipping the test slide into the water and placing it back in the incubation chamber. The slides must be left to incubate for 48 hours. After 48 hours, the slide is removed, and data is read off the bacterial scale provided in the test kit, as seen in Figure 47. One side of the slide will show the bacterial count in the water, and the other will show the yeast and fungi count, as seen in Figure 46.

FIGURE 45: BACTERIAL COUNT, YEAST AND FUNGI COUNT

FIGURE 46: INFORMATION TABLE TO CALCULATE BACTERIAL, YEAST & FUNGI COUNT
Samples will be taken from 3 different locations each time.

FIGURE 47: LOCATION 1 WATER SAMPLE

FIGURE 48: LOCATION 2&3 WATER SAMPLES

TABLE 8: BACTERIAL COUNT DATA COLLECTION
As seen from Table 9, the water in the 1000l storage tank contains many bacteria and is, therefore, unsuitable for drinking water. As discussed in section 6.1.1, several errors during the experimental period influenced the water quality. Table 9 shows evidence when these
errors were influencing the water quality.
Yeast and Fungi were never present in the water in the samples. The data set was used to determine when the SSF was functioning as per design.
The N/A notation indicates that no water sample test was taken at this location. This was due to the system being reset or still in the initialization phase. A sample test was not performed when there was no water in the storage tanks to test.

FIGURE 49: BACTERIAL COUNT AT LOCATION 1 ON 17/03/2017

FIGURE 50: BACTERIAL COUNT AT LOCATION 2 ON 17/03/2017
Figure 50 and Figure 51 indicate what the Micro count Combi slides looked like after they were inserted in two water samples and left to incubate for 48 hours.
After the Slow sand filter setup showed zero bacteria count, a water sample was taken to be analyzed according to the SANS 241 standards. A water sample was also taken from the forced filtration setup to be analyzed similarly. The results of this analysis will be used to compare the two filtration systems. The samples were sent off to Umgeni Water in Pinetown for analysis. Please find Umgeni Water’s certification of accreditation from SANS in Appendix K.
Umgeni Water ran a test on three different water samples. A sample was taken from the pre-filtered water, the post-filtered water by SSF, and the post-filtered water from forced filtration. The results can be viewed below.

TABLE 9: RESULTS FROM WATER ANALYSIS
The results listed in Table 9 need to be compared to the SANS 241-2015 standards to ensure the water is safe for human consumption. The limitations of the SANS standards can be viewed in Table 10 below.

TABLE 10: SANS STANDARDS LIMITATIONS
A comparison is drawn between the SSF and forced filtration setups by comparing the effective removal capability of each system. The results from each system are then compared to the SANS limitations to ensure the water is of potable standards.

TABLE 11: ANALYSIS OF WATER SAMPLE RESULTS
The results obtained in Tables 9 and 10 clearly show that the slow sand filter does not effectively filter water enough to produce potable water according to the SANS 241-2015 standards. It does not perform as well as the forced filtration in filtering rainwater.
These results prove that a slow sand filter cannot filter the rainwater in a rainwater harvesting system. If a slow sand filter is to be used, it must be done while incorporating filtering techniques used by the forced filtration setup. The forced filtration setup has proven to filter the water to the correct
standards.
The research and experimental study proved that a rainwater harvesting system can be designed to be solar-powered and provide enough water to satisfy the potable water needs of a small household. However, the study proved that using a slow sand filter in such a design is insufficient, as it does not meet the SANS 241-2015 standards.
The literature on the slow sand filter showed that it would be an ideally suited filtering technique for such a system due to its low cost, low maintenance and simplicity. Literature and research on slow sand filters were done in the early 19th century, and some of the research is outdated to a certain extent. Water quality tests have become more sophisticated and detailed than they were when slow sand filters were still being used on a large scale.
To operate as designed, the slow sand filter must work with some aspects of the forced filtration technique. A layer of activated carbon can be inserted into the slow sand filter, and the solar pump can pump the water through a UV sterilization system. These corrections will improve the water quality but allow the system to use a small amount of energy and function for a small-scale design.
In 2017, we faced daily water shortage problems. The Western Cape region is suffering from severe droughts at the moment. Therefore, we need to start thinking smartly about water usage and supply. Rainwater harvesting is a viable solution to water needs in rural areas. Using old techniques with modern-day technology, the system design will make it an efficient and reliable source of potable water if the correct filtration is applied.
ABEL. (2017, May 2). Energy-efficient pumps. Retrieved from ABEL Pump Technology website:
http://www.abelpumps.com/en/3-Pump-Solutions/Energy-Efficient-Pumps.php
About, Inc. (2017, January 20). Can you Drink Rainwater? Retrieved from the Thoughts.co website:
https://www.thoughtco.com/can-you-drink-rain-water-609422
American Water Work Association. (1991). Manual design for a Slow Sand Filter. In J. M. Barret, J. Bryck, M. R. Collins, B. A. Janonis, & G. Logdon, Manual Design for a Slow Sand Filter (pp. 2-300). Denver: AWWA Research Foundation.
Aquarista. (2017, Febuary 6). Typical household water consumption. Retrieved from the Aquarista website:
http://www.capewatersolutions.co.za/2010/02/06/typical-household-water-consumption/
Bio Sand Filter Organization. (2004). The Biosand Filter. Retrieved from
http://www.biosandfilter.org/biosandfilter/index.php/item/229
Emerson Electric Co. (2017, February 13). DP Flow Engineering Guide. Retrieved from Chapter 3:
http://www2.emersonprocess.com/en-US/brands/rosemount/Rosemount-Site-Map/engineeringguides/Pages/chapter-03.aspx
Engineering Toolbox. (2017, March 17). Minor loss coefficients for commonly used components in pipe and tube systems. Retrieved from Engineering Toolbox website: http://www.engineeringtoolbox.com/minor-losscoefficients-pipes-d_626.html
EPA. (2017, January 20). What is Acid Rain? Retrieved from EPA website: https://www.epa.gov/acidrain/what-acidrain
ETU. (2017, January 20). Infrastructure Development. Retrieved from ETU Local government toolkit:
http://www.etu.org.za/toolbox/docs/government/infrastructure.html
FLOWJET. (2017). Diaphragm Pumps. Retrieved from Diaphragm Pumps Product list:
http://www.xylemflowcontrol.com/files/pt3_4Diaphragm_DrumPumps.pdf
GERM Africa. (2017, March 20). Glossary of Filtration terms. Retrieved from Germ Africa website:
https://www.germafrica.com/filters/
Gordo, E., Khalaf, N., & Strangeowl, T. (2015). FACTORS AFFECTING SOLAR POWER PRODUCTION EFFICIENCY. New Mexico.
HarvestH2o. (2017, January 20). Potable Rainwater: Purification and Filtration. Retrieved from HarvestH20 website:
http://www.harvesth2o.com/filtration_purification.shtml
ITACANET. (2005). An Introduction to Slow Sand Filtration. Retrieved from WWW.ITACANET.ORG
MIT. (2016, December 12th). Water for All. Retrieved from Water Access in South Africa:
http://12.000.scripts.mit.edu/mission2017/case-studies/water-access-in-south-africa
SA Weather Service. (2017, January 24). Durban Rain. Retrieved from Durban Rain Website:
http://www.dbnrain.co.za/showmodels.php
SHIMGE. (2017). QT Peripheral Pump. Retrieved from Shimge submersible pumps:
http://shimge-pump.com/5-6-peripheral-pump/245991
Solar Power World. (2017, January 15). How do solar inverters work? Retrieved from Solar Power World website:
http://www.solarpowerworldonline.com/2013/04/how-do-solar-inverters-work/
Solar Scene. (2016, December 22). Solar geysers explained. Retrieved from Solar Scene website:
http://www.solarsense.co.za/solar-water-heating-explained.php
SSWM. (2017, January 24). Water Purification. Retrieved from SSWM info website:
http://www.sswm.info/category/implementation-tools/water-purification/hardware/semi-centraliseddrinking-water-treatmen-2
Stats SA. (2016, June 31). Mid-year Population. Retrieved 2016, from Stats SA publications website:
http://beta2.statssa.gov.za/publications/PO302/PO3022014.pdf
StructX. (2017, April). Hydraulic Conductivity Ranges of Various Soil Types. Retrieved from StructX Website:
http://structx.com/Soil_Properties_007.html
Tech Brief. (2014). Slow Sand Filtration. In M. L. Phd.
Tizagenix. (2017, Jan 21). Rainwater Harvesting. Retrieved from the Use-rainwater website:
http://userainwater.com/is-rainwater-safe-to-drink.html
White, F. M. (2011). Fluid Mechanics Seventh Edition in SI Units. In F. M. White, Fluid Meters (pp. 419-438). New York: McGraw-Hill Education.
Wind & Sun. (2017). Everything you Need to Know About the Basics of Solar Charge Controllers. Retrieved from Northern Arizona Wind & Sun website:
https://www.solar-electric.com/solar-charge-controllerbasics.html/
The supply of potable water to underground mining operations poses unique challenges for each mining site. Employees who work underground on the mining face at the bank stations, technicians and engineers alike require access to potable water. The National Norms and Standards for Domestic Water and Sanitation (2017) prescribes 15 to 20 litres per person per day, of which the average person will drink 5 litres per day. Some mines initially invested in the infrastructure to distribute potable water from the surface to the underground workings. This requires a significant upfront capital investment, and the static head in the shaft results in extreme pressures prone to leaks that result in water losses at a high cost. Another solution is to manage the logistics behind the distribution of drinking water bowsers at the various points of use. Considering the high level of logistics required for the successful operation of an underground mine, the additional requirements of potable water distribution can hamper production figures. These options are also further complicated because the actual mining takes place far from the mining shaft, which either requires piping or transporting the bowsers to the point of use.
Advances in water treatment technologies make the option of point-of-use water treatment increasingly feasible. Of these technologies, reverse osmosis is emerging as the most cost-effective treatment for potable quality. It has a very high rejection of salts, up to 99%, and does not contribute any additional salt to the water reticulation system. It achieves the separation of salts via the membranes for a pure permeate stream and a high salt load brine stream, and as long as there is a sustainable solution for brine disposal, this technology will be feasible. This has been implemented at various mines in South Africa with various levels of success, and this article will discuss technical details that need consideration when evaluating whether this is a solution at a specific mine.
My water is unique to each location and depends on the bedrock’s geology, the ore body, water management strategies, and mining styles. With this in mind, it is clear that no silver bullet solution can be implemented across the mines. Analysis and understanding of the water quality that needs treatment play a pivotal role in selecting the appropriate treatment technology.

These qualities are merely examples of the references listed. They can vary widely on-site, with some mines having up to 4 or 5 different water sources in a single mine, each with unique characteristics. Successful water management will keep contaminated sources apart from the uncontaminated groundwater and recycle or reuse the contaminated water as far as possible. Where water is exposed to ore with high sulfidic concentrations, there is the potential for oxidation of the sulfide components to sulphates, which generates acid and can result in the liberation of further metals. These streams can have a pH as low as 3.0, with metal concentrations of Fe and Mn exceeding 100 mg/L and SO4 above 2000mg/L. Highly impacted waters such as these should not be considered for treatment as they require significant pretreatment before being suitable for membrane processes. However, if such a source can be treated through pH correction and settling, available at some deeper gold mines, this water becomes viable for treatment.
Groundwater from dolomitic compartments is characterized by high hardness (Caused by Calcium and Magnesium) and carbonate content, which poses a scaling risk towards membranes. The use of antiscalant allows membranes to achieve high recoveries of hard water by increasing the calcium concentrations above the saturation levels. However, ensuring the correct dosage is applied is critical to extending membrane lifespan. Saturations levels for gypsum are 2 531mg/L and 1 500mg/L for limestone, respectively, in pure water, which can be exceeded with the use of antiscalant. When concentrations are exceeded above the antiscalant capacity, there is the potential for scale formation to occur on the membrane surface. Precipitation on the membrane surface reduces the effective surface area, resulting in lower permeate flow rates and increases in feed pressure. Depending on the conditions, such as pH and the anions ratio between CO32- or SO42- scale, it can be calcium carbonate or calcium sulphate. Calcium carbonate can be readily dissolved using an acid such as citric acid under normal conditions; however, calcium sulphate requires a more rigorous alkaline rinsing to dissolve the scale.
Typical mining minerals do not contribute large amounts of monovalent ions to the salt load of the mine water. However, some mining blasting methods contribute significant amounts of ammonium and nitrates to the mine water. Where the mine water is recycled, the ammonium values increase to 50 to 100 mg/L, whereas the SANS 241 limit is 1.5mg/L, which requires very high rejection to achieve potable quality. Because of the pH dependence, equilibrium between ammonia gas (NH3) at high pH and ammonium ions at lower pH may require pH adjustments before treatment. This is because, in the gaseous phase, there will be little to no rejection of the ammonia. However, the RO membranes are very efficient at rejecting the ammonium ions.
Typical mine service water reticulation systems run a recycling system that cools water on the surface, distributes water to the underground workings for use, collects the water and treats it through mechanical settling with pH correcting and pumps it back to the surface for cooling and reuse. Using the cooled water in equipment, machinery and on the mining face results in contamination with super fine solids, which may have sulfidic content and contribute to the acidification of the water. Therefore, the settler installation for underground mines is a critical process, and even with optimal performance, the settler overflow contains between 5-10 mg/L of the superfine solids. These solids will be pumped with the mine water and reported to the feed inlet for any membrane installation. Mechanical filtration will be required to prevent the membranes from blocking. When there is a malfunction of the settlers, it is possible that the solid content can spike up to 500-800mg/L, which can instantly block a cartridge filter installation, so having a robust primary filtration step is vital.
With the requirement of being a point-of-use treatment solution, the entire membrane treatment solution must be skid-based and mobile to allow transportation between mining sites where potable water is needed.

Figure 1 Membrane Treatment Considerations
Various alterations and improvements to the treatment process flow diagram provide unique solutions for the specific conditions for which they are designed. Some mining clients require very high mobility and state that the unit must function without an electricity supply. Other clients require a more permanent centralized solution with a focus on rejection and disinfection, which would require booster pumps and continuous UV disinfection.
An underground treatment facility requires a robust primary filtration solution due to the high variability of the suspended solids load in mine water. Some solutions only have cartridge filters installed as a filtration step, with successively smaller micron ratings to combat blockages. Unfortunately, the typical suspended solids slug experienced underground will block the primary cartridge and prevent any treatment. The unit will only be operational once the cartridge has been sourced and replaced, which could increase costs and result in long downtimes.
Active filtration, such as media filtration or Ultra-filtration membranes, is a preferable solution with higher capital costs; however, it will result in longer running times. If a high suspended solids slug is experienced, the active filter unit can switch to backwash mode, rinse the solids to the waste stream and resume operation. Depending on the unit’s requirement, this can be an automated (high cost, high efficiency) or manual (lower cost, operator dependent) process. Having an experienced service provider responsible for monitoring and maintaining these units is crucial to resolving blockages and investigating the potential causes thereof. As the first treatment process for potable water production, any downtime of this step automatically switches off the entire plant; hence, no potable water is available. This is an important factor to consider when evaluating the costs of various suppliers of these treatment units.
The membrane treatment step is the constraining factor when considering the treatment capacity of mobile underground RO units. Units that are typically advertised as mobile can be handled manually and have a treatment range from 500L/day to 15,000L/day. This is because the RO membranes have a fixed surface area, and therefore, a maximum number of membranes can be fitted on a skid-based treatment plant that is still considered a “Mobile Treatment Plant.”
Reverse Osmosis rejection is a function of the osmotic pressure of the feed water and the additional pressure required to overcome this pressure and produce low salt load permeate water. High concentrations of monovalent ions require higher feed pressure to the RO membranes to maintain high salt rejections. Specifically, in the case of high concentrations of chloride, nitrate or ammonia, an inter-stage booster pump may be required before the RO membranes to increase the pressure to >15 bar. This is an example of power being required to operate the treatment unit, limiting the areas in which the unit can be used.
The membrane treatment process is the most sensitive step in producing potable water, as any changes in the operating conditions can affect the potable water quality, potentially damage the membranes or reduce potable water availability. Monitoring instruments can be used to protect the membrane treatment stage of which the most critical parameters to monitor are:
Only one of these monitoring parameters is typically chosen to minimise costs on the underground treatment units, and the relevant instrumentation is installed. Depending on the mine and feedwater conditions, the technology supplier should recommend which is the most useful parameter to monitor. However, just having the monitoring in place means nothing if the measurements are not recorded and interpreted, which again highlights the importance of having an experienced technology supplier on board for the operation and maintenance of these units.
RO membrane permeate requires disinfection as a precautionary method to ensure no risk of microbiological contamination of the permeate. The preferred disinfection method is using UV lamps, which destroy any microbiological organisms present and prevent any growth that should enter the system. If the permeate is pumped to a distribution tank, it is suggested the water is circulated through a UV filter to prevent any contamination. Where there are long distribution lines underground with intermittent tanks, UV filters would also be required at these points, as UV does not provide a residual to keep the water disinfected downstream of the UV filter.
Due to the intermittent use of these units, dosing sodium hypochlorite is not a recommended solution. Dosing would require a complicated automated dosing system to ensure there is no overdose when consumption is low, whereas UV cannot overdose. Both these solutions require an energy source, limiting the unit’s flexibility to sites with a power source available.
Where the unit is required to operate without a power source, the high pressure of the service water is used as the driving force for the RO purification. Disinfection is possible without a power source, using Metallic Silver deposited ceramic filters. These filters have proven highly efficient at E.Coli destruction (K.N. Jackson & J.A. Smith, 2018); however, the disinfection efficiency reduces with continuous use. This can be mitigated by regeneration with nanosilver solutions or by replacing the cartridge filter, the recommended precaution to reduce risk. There is no physical indication to determine the disinfection efficiency over time, highlighting the importance of a competent and experienced monitoring and maintenance technology supplier. This technology does not provide a disinfectant residual and presents the same risks of contamination if an extended distribution network is utilized towards the water users.
Considering the various process considerations that need to be considered for an underground potable water treatment unit, it should not be seen as a silver bullet that can be implemented without the necessary feed water analysis and underground conditions. It is a unique technology solution that provides new underground potable water supply options as an alternative to historical supply from the surface. Working with an experienced technology expert will enable the correct solution to be designed cost-effectively, ensuring that underground mine workers have a safe, reliable source of potable water. Potable water quality monitoring is a crucial step in ensuring the water meets the required standards, which comes at an added cost that is usually overlooked. Using this technology to treat underground natural ingress water can provide a sustainable source of underground potable water for mining operations.
More about EPCM.
*B. Hutton, I. Kahan, T. Naidu & P. Gunther, 2009, “Operating and maintenance experience at the Emalahleni water reclamation plant”, International Mine Water Conference 2009.
Department of Water and Sanitation, 2017, “National Norms and Standards for Domestic Water and Sanitation Services”, Government Gazette No. 982, September 2017.
* GR Pretorius, 2019, “Sustainable mining through innovative water management, treatment technologies and remediation strategies to address current and historical environmental liabilities”, WISSYM 2019 4th International Mining Symposium.
*K.A. Slatter et al., “Water Management in Anglo Platinum process operations: Effects of water quality on process operations”, Anglo Platinum Research and Development.
* SJW. Skinner, 2017, “Tracking nitrates sources at a Platinum Mine – Putting the Puzzle together”, IMWA 2017, Mine Water and Circular Economy.
Digitalization is being described by many as a “global megatrend that is fundamentally changing existing value chains across industries and public sectors” (Collin, 2015). When listing long economic waves, expert Michael Vogelsang stated, “after the steam, steel, electricity, and petrochemical revolutions, network-based digitalization is the driving force today on the stage of business and private life” (Vogelsang, 2010). Fundamentally, digitalization can be defined as the use of digital technologies to change a business model and provide new revenue and value-producing opportunities; it is the process of moving to a digital business.
Now that we have defined its precedence, to understand how digitalization affects top management leadership, we need a clear definition of the different forms of leadership and their characteristics, as defined by an expert in leadership studies, Bernard M. Bass, in his book Transformational Leadership (Bernard M. Bass, 2006), as well as the characteristics of digitalization that affected the fore-mentioned leading styles.
Value-based leaders lead through morality, empowerment, and followership (Yukl, 2012). They empower the organization to achieve its overall goal by communicating their visions and encouraging the workers.
Transformational leaders view the organisation as an entity in which one can induce change through encouragement and motivation (MacGregor, 1978).
Authentic leaders develop the perspective that to truly impact and be of benefit to individuals, corporations, nations and societies; authentic leaders must possess inner characteristics beyond transformative and charismatic leadership (Copeland, 2014)
Now that we have defined the leadership styles, we will define the characteristics of digitalisation that affect the previously mentioned leadership styles.
These characteristics will now be used to analyse the effects of digitalisation on the three top management leadership styles.
“I think that as part of digital leadership, you must understand that you cannot preserve what you have, but you must be willing to change and dare to ask questions. Leading and learning your way forward. I’m quite fond of explaining through a rather broad narrative, why are we here, what is the point of going to the office every day, if everyone understands the story then there is less need for control and more for empowerment.” – Leader H
The complexity of generating ideas is solved by the encouragement and empowerment of the staff to co-learn and co-create initiatives in diverse groups (Iansiti and Levien, 2004). (1) Interconnectedness and
4) Hierarchy removal is a self-evident characteristic that advances the co-creation between employees. Leader H also stressed how narratives (5) enabled the decision-making of the individuals in the organisation: if everyone could self-guide their decision-making after the values and narrative set by the leader, the organisation would be more efficient.
About EPCMs Culture
The Pipeline pigging system involves using a device called a Pig to perform various tasks, including cleaning, maintenance, inspection, batching, and dimension checks on a new or existing pipeline. During the pigging operation of an existing pipeline, pipeline operations are not stopped, meaning the pigging tool is introduced into the flow stream. It travels along the pipeline, utilising the flow and pressure of the pipeline.
It should be noted that pigging operations are performed on gas pipelines, liquid hydrocarbon pipelines, pipelines conveying waters, pipelines transporting slurries, etc.
Pigging operations are performed using Pig Traps (Launcher and Receiver), a Pigging tool and a medium for propelling the pig in the pipeline.
A pipeline may be equipped with permanent pig launchers and receivers; however, temporary launchers and receivers are common. Temporary launchers are typically used for subsea pipeline pigging. The launcher is connected to the pipeline end manifold to commence the pigging operation.
Pigging operation is a critical activity that should be appropriately planned, considering all safety and operational considerations. Several accidents have been recorded during pigging operations.
This article will emphasise pigging facilities installed within onshore and offshore platforms.

Figure 1: Arrangement of Pig Launchers and Receivers in a Facility
Pig traps are static equipment utilised to introduce pigging tools into a pipeline and receive the pigging tool at the other end of the pipeline. There are two types of Pig Traps
The launcher is the equipment used to feed the pigging tool into the pipeline. It comprises a door or end closure, which can be opened and closed. There are nozzle connections on the Launcher. These will be discussed in later sections of this article
The Receiving Trap is stationary equipment used to receive the launched pigging tool. It generally looks almost the same as the launcher except for some configuration changes. The Receiver is equipped with a door or an end closure. This is where the pigging tool and cleaning debris are received. The receiver has nozzle connections for piping and instrumentation connections, which will be discussed in detail in further sections of this article.
Generally, a pig trap may be installed in the orientations below. The major factor dictating the type of orientation is the space available. In offshore applications, riser location and entry position into the platform are key factors.
A vertical launcher is specifically for launching with a short neck and a concentric reducer. These launchers’ orientations are used in offshore platforms where space availability is critical. Also, the pipeline riser is vertical, so in some cases, the vertical configuration is the best by aligning the Launcher to the Riser

Figure 2: Vertical Pig Launcher Installed on Offshore Platform. Launcher
Vertical receivers are specifically for receiving with a longer neck and a concentric reducer. They are not very common. However, they are used mostly in offshore applications. Just like the vertical Launchers, they are more applicable with space limitations. It should be noted that some companies prohibit the use of vertical pig receivers.
These types of Launchers are specifically for launching in the nearly horizontal position. They have an eccentric reducer (Flat on the Bottom) to ensure the pig enters the neck in the correct orientation. These launchers are the most commonly seen in all facilities. They can be conveniently installed onshore and on offshore platforms where there is no space limitation.
It should be noted that some Companies’ regulations require that horizontal Pig Launchers should slope downward toward the pipeline; the essence of this slope is to aid liquid draining from the barrel. As per SHELL DEP 31.40.10.13-Gen, the minimum slope angle required for a pig launcher is 3 degrees

Figure 3: Horizontal Gas pipeline Pig Launcher
These Receivers are specifically for receiving pigging tools in the horizontal position. They could have a concentric or eccentric reducer, but the eccentric reducer type is the most common.
They are the most common reducers, and they can be found on offshore platforms and onshore facilities.
Some companies’ regulations require that horizontal Receivers should slope downward toward the end closure; the essence of the slope is to aid liquid draining from the barrel. As per SHELL DEP 31.40.10.13-Gen, the minimum slope angle required for a pig launcher is 3 degrees

Figure 4: Horizontal Gas Pipeline Pig Receiver
A pipeline pig or pigging tool is a device driven through a pipeline by the flow of the fluid (flow rate and pressure) within the pipeline that is used to perform various internal activities. These activities include cleaning, separation of pipe fluids (batching), internal inspections, dimension checks, etc. Various types of pigging tools are available and have various applications. They may be grouped based on function, construction material and applications. Some examples of pigging tools are listed below.

Figure 5: Pigging tool with Brushes Utilised for Cleaning a Subsea Pipeline offshore
As stated in section 1.0, pigging operations are performed for specific reasons. Some pigging operations are highlighted below
This is one of the major pigging operations. It is used for existing pipelines, both in-service and newly constructed pipelines, that have debris from welding and construction activities.
Pipelines conveying fluids (Liquid and gas) accumulate debris over time, which may have resulted from the fluid transported, internal corrosion, Wax formation, etc.
Pipelines usually have debris due to welding and other activities during pipeline construction.
Debris can be effectively removed by sending a suitably selected pig through the pipeline. For an in-service pipeline, the flow operation conveys the pig across the entire pipeline length to the receiver.
For a new pipeline under construction, compressed air could propel the pig across its entire length prior to commissioning.
Various types of pigs could be used for this operation, including Steel Mandrel and solid cast pigs. However, Steel Mandrel and Solid Cast pigs perform much more efficiently.
Dewatering entails removing water from a pipeline. This activity is usually performed after a pipeline has been hydrotested. After the hydro test, all the water in the pipeline cannot be drained due to the varying elevation along the pipeline. A Pig is sent into the pipeline to push most of the water out. Foam pigs are mostly used for this task.
Dewatering is performed by propelling a pig through the entire pipeline. Compressed air at appropriate pressure drives the pig while the trapped water in the pipeline is pushed out.
It should be noted that this activity may be repeated more than once to ensure that the pipeline is thoroughly dewatered.

Figure 6: Foam Pig used for Dewatering Operation
This is another pipeline pigging operation performed during pipeline construction or after pipeline sections are replaced. It may also be carried out on the suspicion of pipeline defects.
These tools can effectively measure pipeline internal bore diameter, depth of dents, bend radius, ovalities, deformations, and girth weld, among other things.
This activity aims to detect pipeline imperfections exceeding the maximum code allowable. Geometry pigs may be propelled using compressed air.
This tool has an inbuilt global positioning system, which helps to accurately locate any measured data.
There are pipelines designed and constructed to convey more than one product type (multi-product pipelines). A pipeline can be designed to transport ATK (Aviation Turbine Kerosene) and DPK (Dual-Purpose Kerosene), Premium Motor Spirit (PMS), Automotive Gas oil (AGO), etc.
These products are transported in batches, i.e. ATK before DPK.
The operation involves sealing pig to form a barrier between the transported fluids. This pigging operation uses the system flow parameters (flow rate and pressure) to propel the pig through the pipeline. The interface zone between batched fluids is sent to a slop tank at the reception facility for further process activities.
Foam pigs and other solid pigs are ideal for batching operations.
This is an advanced type of pigging operation performed using inspection tools, also known as smart pigs or in-line inspection pigs.
These pigs are used to acquire information, especially about the pipeline’s corrosion rate. They can also measure the pipeline’s curvature and diameter (internal and external).
As the pigging tool is propelled along the pipeline, the characteristics of the pipeline are measured. These results are further interpreted and analysed to obtain various data.
This method of pigging is utilised for the in-service pipeline; the pigging activity utilises the fluid flow parameters (flow rate and pressure)
Generally, two types of inspection methodology are employed, as discussed below:
MFL pigging tools use magnetism to detect wall thickness loss in pipelines. A very strong magnet is used to magnetise the pipe wall. Metal loss in the pipe wall due to corrosion or other factors will cause a change in the induced magnetic field. Changes in pipe wall thickness can be sensed using a detector; hence, corrosion or loss of metal can be detected.
The collected data can be further analysed to obtain other data, such as bend angles. Magnetic flux leakage pigs can be utilised for both gas and liquid pipelines.
This method uses ultrasound to measure pipeline wall thickness. As the pig is propelled through the pipeline, a transducer transmits signals perpendicular to the pipe wall surface. The transducer receives these signals for each pig position along the pipeline. The signal received is from the pipeline’s internal and external walls.
The time taken to receive the signal is further analysed to determine the pipeline wall thickness.
It should be noted that ultrasonic pigs are applied to the liquid pipeline system.
A major advantage of Ultrasonic inspection over Magnetic Flux Inspection is its ability to measure pipelines’ higher wall thickness.
A pigging philosophy should be developed during the pipeline planning stage. The philosophy shall cover activities including pipeline cleaning and inspection of pipeline wall thickness. Requirements for pigging equipment are stated in section 864.2.3 of ASME B31.8. Some of the considerations for developing the philosophy are stated below.
This is one of the key factors to consider when developing a pipeline-pigging philosophy. It is a function of the fluid characteristics (Corrosive or non-corrosive) and other factors. Pipelines transporting non-corrosive fluids will be less subjected to internal corrosion; hence, the need for intelligent pigging is less than for pipelines transporting corrosive fluids.
Pipelines transporting sensitive fluids such as Aviation fuel require regular checks to detect fuel contamination due to corrosion and debris. This is usually tackled by selecting appropriate pipeline material and inspection plans during the pipeline planning stage.
The operations to be performed over a period of time should be well-detailed in the philosophy and judiciously implemented during the pipeline’s operation phase.
This is usually considered during the development of the pigging philosophy. The frequency of pigging operations varies depending on the fluid characteristics transported.
Pipelines transporting corrosive fluids have a higher inspection frequency than pipelines transporting non-corrosive fluids.
Pipelines used for Batching operations (multi-product pipelines) require frequent use of batching pigs. This should be carefully planned based on the volume of fluid transported and the frequency of transporting a different product.
There are many manufacturers of pigging tools; however, selecting a manufacturer or two is important during the pipeline planning stage. It is important to select manufacturers because different vendors have different specifications for their pigging tools. The pigging tool specification may include the following:
Considering the above requirements, a particular pigging tool is selected to satisfy the fluid properties, and the pipeline is designed to suit the pigging tool’s dimensional requirements.
The quantity of debris expected from the pipeline pigging operation should be estimated when preparing the pigging philosophy. Appropriate provisions for handling and disposing of this debris should be well spelt out.
It is paramount that when a pig is launched, its location is known. There are instances when pigging tools get stocked in a pipeline. It is very important to know the actual location of the tool to proffer remedial actions if a pig does not arrive at the proposed destination. Smart pigs are easily tracked because they have an in-built monitoring system that can be used to determine the pig’s location. The pigging tool has inbuilt transmitters that send a signal at a variable frequency to a receiving system.
Several factors affect pigging tool selection; some will be highlighted in this section. During the pipeline planning stage, pigging should be a critical part of the project that must be properly analysed.
When selecting the pigging tool, the size of the pipeline is a major factor. Intelligent pigs have minimum and maximum operational pipeline sizes that can operate effectively.
Also, the bigger the pipeline, the bigger the tool. The size of the tool affects the operational effectiveness of attachments such as brushes. Larger tools are subject to higher stresses.
Pipeline length varies, and it affects the pigging tool’s operational efficiency. Foam pigs used on long pipelines are subjected to more frictional wear.
Smart pigs usually have a maximum specified pipeline length that can be covered. Also, due to the friction between the pigging tool and the pipeline wall, more heat is generated during the pigging of long pipelines. Therefore, selecting a tool that satisfies the pipeline length requirement is paramount.
During pigging operation, space is required to convey the pigging tool close to the barrel, above the barrel, for vertical launchers and receivers. Due to their size, space requirement is more critical when pigging with smart tools. Usually, the pig tool manufacturer specifies the minimum area required for pigging operation. Also, the handling area should consider the radius required to operate the pig trap end closure safely.
Therefore, it is necessary to create the space required for pigging operation around the trap or to ensure that the selected pig tool can be successfully operated within the available space.
This is a major factor that affects pigging when smart pigs are used. Smart pigs are longer than conventional cleaning and batching pigs. They are flexible to navigate pipeline bends, however, there is a limitation in their flexibility as they can only pass through bends wit radius large enough. Usually, 5D bends provide passage for medium pipeline-size pigging tools; however, pipelines are built with 3D bends and even 1.5D elbows. It is, therefore, very necessary that a selected pigging tool must effectively navigate through all the pipeline bends.
Also, during pipeline planning, the bend used should be properly selected to ensure it can allow the passage of the selected pig tool.

Figure 7: Installed Pipeline 3D Bends
Pigging tools can be used for both liquid and gas mediums. However, a specific tool can only function efficiently in a medium. So, the tool selection should consider the fluid transported or that will be utilised to propel the pig.
Inline Components such as valves and Tees are major factors affecting a pipeline’s inability. There are instances where the wrong valves are installed on pipelines. All piggable pipeline valves shall be full bore; however, several reduced bore valves have been encountered during pigging operations. The implication is that the pig will be trapped on the valve.

Figure 8: Piggable Pipeline Full Bore Valve
Also, all branch connections to a pluggable pipeline using Tees shall be appropriately specified. Only barred Tees shall be utilised for pluggable pipelines. However, the use of barred Tees is limited to branch connection size, which is a function of company and code requirements.
The table below shows the requirements for branch connection to a pipeline that may be adopted as per ExxonMobil GP-59-01-05 (Pigging Systems).

Table 1: Barred Branch Connection Requirement
In this section, I will try to itemise and explain each component of a pigging system. The pictures below show the 3D view of a Pig Launcher and Receiver and the schematic of a Pig Trap. It should be noted that there might be variation in the configuration, a number of attached nozzles depending on the fluid transported and the design philosophy. Also, take note of the Kicker line location for Launcher, it is at the back close to the end closure while for a receiver it is at the front close to the reducer. This is one of the major differences between a Launcher and a Receiver.

Figure 9: 3D Model of a Gas Pig Receiver

Figure 10: 3D Model of a Gas Pig Launcher

Figure 11: Generalized Schematic of a Pig Launcher
See below the names of each attachment to a pig Trap.
Following the numbering system above, l will briefly explain each component and others not part of the list above.
The major barrel is a pipe with a diameter greater than the diameter of the minor barrel. It is usually bigger to facilitate easy loading of the pig into the launcher or easy unloading of the pig from the Pig Receiver. Selecting the major barrel size is critical to an effective pigging operation. As per SHELL DEP 1.40.10.13-Gen pipelines of sizes smaller than NPS 20”: the major Barrel nominal diameter should be 50 mm (2 in) larger than the pipeline’s nominal diameter.
Also, the DEP requires pipelines with nominal diameters DN 500 (NPS 20) and larger to have a major barrel’s nominal diameter 100 mm (4 in) larger than the pipeline’s nominal Diameter.
Also, when specifying the major barrel size, the internal diameter of the barrel should be considered. When the barrel is made of low-grade pipe material, it will result in a very thick barrel that may be close in internal diameter to the pipeline, which can affect pipeline pluggability.
The reducer is the connection interface between the Pig trap’s major barrel and the minor barrel. It is welded to both barrels. Eccentric reducers are recommended for horizontal pig traps; however, concentric reducers may be used depending on client requirements. Concentric reducers are recommended for vertical pig launchers.
The dimensions of the reducers (concentric and eccentric) shall be obtained from ASME B 16.9 (Factory-Made Wrought Buttwelding Fittings) or other generally acceptable codes and standards.
This is the smaller diameter section of the pig trap. It usually has the same outside diameter as the pipeline.
The internal diameter of the minor barrel should be the same as that of the pipeline, or minimal variation is permitted. When there is a significant difference between the internal diameter of the minor barrel and the pipeline, the pig may be unable to exit the barrel for launchers or enter the barrel for receivers.
SHELL DEP stipulates that transitions in the internal diameter of the barrel due to wall thickness variation greater than 2.4 mm shall be tapered to a maximum angle of 14o to the pipe axis to allow the smooth passage of a pig.
The nozzle is the last component downstream of the pig launcher or the first component upstream of the pig receiver. It should be noted that in instances when pig traps are welded to pipelines, the nozzle shall be eliminated from the drawing,
An isolation valve shall be installed at the transition from the pig trap to the pipeline. For flanged valves, the nozzle is the connecting element to the valve. The nozzle shall be appropriately rated to the design pressure and temperature. Nozzle dimensions may be obtained from ASME B16.5 (Pipe Flanges and Flanged Fittings NPS 1/2 Through NPS 24) and ASME B16.47 (Large Diameter). Steel Flanges NPS 26 through NPS 60 Metric/Inch Standard) or other applicable codes and standards.
The end closure or door is the only access to feed the pigging tool into the launcher or retrieve the pigging tool from the receiver. The end closure shall be welded to the major barrel. The end closure is the most critical part of the pig launcher because if the closure opens during the pigging operation, it can result in a serious accident. The end closure is usually made of a material compatible with the barrel. End closure is generally of quick opening type with an inbuilt safety interlock system to prevent the door/closure from opening during pigging operation. There are different types of closures, some suitable for vertical pig traps while others for horizontal pig traps. The end closure is mostly equipped with hinge assembly for horizontal installation and davit for vertical installations.
As stated in section 404,7 of ASME B31.4, Quick opening closures shall be equipped with safety locking devices in compliance with Section VIII, Division 1 UG-35(b) of the ASME Boiler and Pressure Vessel Code. However, closures can be designed to other codes and standards, including PD 5500 / EN 13445.

Figure 12: Hinged Type End Closure
The kicker line connects the major barrel to the bypass line. It allows fluid diversion from the bypass line to the barrel to launch the pig or to receive the pig on the receiver. It should be noted that the kicker line position on a launcher barrel is at the back close to the end closure, while for the receiver, the kicker line is at the front of the major barrel close to the reducer.

Figure 13: Kicker Line Location for Launcher

Figure 14: Kicker Line Location for Receivers
Pressure indicators are a key component of a pigging system. All pressure gauges should be properly calibrated before commencing pigging operations. There may be a pressure indicator mounted on the major and minor barrels; however, there are instances when one pressure indicator is used. With the indicator properly installed, the operator can check if the barrels are pressurised during pigging operations.
Vent/Relief lines are critical components during pigging operations and act as safety devices. The vent valve is manually opened before the operation commences.
The Relief valves open if the barrel pressure exceeds a set point. One of these valves is usually installed on the major and minor barrels, respectively.

Figure 15: Relief Lines
Pig signallers are alert devices installed on the minor barrel, on or before the minor barrel. They indicate the passage of a pig. They may also be installed at appropriate locations along the pipeline. When a pig is launched, the barrel end closure is usually closed, so there is no way to know that the pig has left the barrel without installing a signaller. In most cases, launchers have one installed on the minor barrel and another installed downstream of the pig trap valve. The passage of the pig will generate a signal. Also, without a pig signaller, it will be difficult to detect if the pig has arrived at the receiver. This implies that installing at least one pig signaller on the receiver minor barrel and or upstream of the receiver valve is mandatory. There are two types of pig signallers: Intrusive and the non-intrusive type. The intrusive type is a mechanical device requiring a hole to be bored into the pipeline and a flange or nipple connection to be installed. The Pig Sig is then installed on this connection.
Unlike intrusive pig signallers, non-intrusive pig signallers can be quickly installed and removed from the pipeline. They are strap-on devices equipped with sensors. The non-intrusive pig signaller can detect the location of the pig as it approaches. They do not require boring a hole in the pipeline. The passage of a pig is indicated by light flashes in colour.
This is a small line equipped with valves (a Check and an isolation valve) and a blind connection for introducing inert gas into the barrel when the pig is not in operation.
The supports are the load-carrying member of the trap. They carry the dead weight of the trap when they are not in use and carry both live and operational loads.
Horizontal pig traps are supported on saddles, usually two, while vertical pig traps are supported on trunnions resting on the offshore platform framework.
As the name suggests, these lines drain liquid content from the pig trap. Usually, one drain line is connected to the minor barrel and another to the major barrel. These two lines can be commingled into one and routed to a closed drain system.
An equalization line connects the major barrel to the minor barrel. The equalization line creates pressure upstream and downstream of the pigging tool in the pig trap.
For launchers, a balanced line shall be provided to enable filling and pressurising of the barrel on both sides of the pig, while for receivers, a balanced line shall be provided to prevent any possible pressure differential across a received pig

Figure 16: Pressure Equalization Line on a Pig Launcher
The bypass line is the major service line that connects the pipeline to upstream or downstream facilities such as tank farms, compressor stations, pump stations, reception facilities, etc. This branch line connection to the pipeline is usually located downstream of the big launcher valve or upstream of the pig receiver valve. The kicker line takes its fluid source from the bypass line.

Figure 17: Bypass Line
There are no piping networks without installed valves; however, valve type selection must be carefully performed when it comes to pigging system design. Various valves are installed in the pigging system; however, I will explain briefly some requirements for consideration.
The pig trap valve isolates the pig trap from the pipeline system when it is not in use. The valve must be in good working condition. Some clients require that a double block and bleed valve be installed to achieve this isolation.
The pig trap valve(s) shall be a full-bore, tight shut-off ball valve or through-conduit gate valve to permit the easy passage of pigs.
Also, the minimum internal diameter of the valves shall be consistent with that of the pipeline.
This valve is located close to the branch tee connection to the pipeline. It is installed to isolate the pipeline from facilities connected to it. Any of the following valves can be installed as a bypass valve: a tight shut-off ball valve, a pressure-balanced plug valve, or a through-conduit gate valve.
This is the valve installed on the kicker line. The gradual opening of this valve bypasses fluid flow from the bypass line to the barrel. This valve should be installed as close as possible to the bypass line.
To isolate the bypass line from the barrel, a tight shut-off ball valve, pressure-balanced plug valve, or through-conduit gate valve may be installed.
These are mostly manually operated valves. Their opening permits the draining of liquid content from the pig trap. Tight shut-off quarter-turn ball or pressure-balanced plug valves can be used for this purpose. When debris is expected, the use of a ball valve and gate valve should be carefully evaluated.
These valves are installed on the vent lines. They are used to depressurise the pig traps manually. Tight shut-off ball valves, gate valves or plug valves can be used. A globe valve is very suitable for gas lines.
A drip tray shall be provided under the end closure permanently or temporarily. The tray may be provided with appropriate piping to a closed drain system if a high volume of liquid is anticipated. Vertical launcher installed on the offshore platform usually has the tray installed concentrically or eccentrically around the barrel. When the end closure is open, especially for liquid pipelines, there is the possibility of liquid draining out. The tray collects the liquid for onward transport to the drain system.
This is required, especially when the pigging operation involves intelligent pigs. These pigs are heavy and cannot be easily lifted. In most cases, a Davit of appropriate rated capacity is installed to facilitate lifting the pigging tool.
A Pig Tray is mechanical equipment that facilitates the easy loading of the pig into the Launcher or the easy unloading of the pig from the receiver. The height of the tray should be designed to align with the bore of the major barrel. A hand, Davit, or any other mechanical device may be used to push the pig into the barrel.
Sometimes, the trays may be incorporated into a Trolley that can be used to convey the pigging.
Pig trays are not applicable to vertical launchers and receivers; the only requirement is a means of transporting the pigging tool.

Figure 18: Pig Trolley with Installed Tray
ASME B16.5: Pipe Flanges and Flanged Fittings NPS 1/2 through NPS 24
ASME B16.47: Large Diameter Steel Flanges NPS 26 through NPS 60 Metric/Inch Standard
ASME B 16.9: Factory-Made Wrought Buttwelding Fittings
ASME B31.4: Pipeline Transportation Systems for Liquid Hydrocarbons and Other Liquids
ASME B31.8: Gas Transmission and Distribution Piping Systems
SHEEL DEP 31.40.10.13-Gen: DESIGN OF PIPELINE PIG TRAP SYSTEMS
ExxonMobil GP 59-01-05: Pigging Systems
Geodesic Domes: In a world of uncertain times, it is important to maintain and manage current assets, but more so, understand the reasons why your assets evolved into what they are today. Geodesic aluminium domes are one of the oil and gas industry assets that protect the product and improve emissions reduction in the aboveground storage tank (AST). They have a service life of at least half a century if maintained well.
In summary, a geodesic dome is a site-specific, structurally engineered, above-ground storage tank roof made from an aluminium structure of interlocking panels, extruded struts, gusset plates, batten bars, and hubs that require no welding.
“For the technically or mathematically minded, a geodesic dome is a spherical structure composed of triangular elements forming part of a network of circles, or ‘geodesics’, on the surface of a given sphere.” – Jonathan Glancey
Dome roof building structures have existed for centuries. Ancient Civilizations such as the Romans applied their masonry skills and Architectural knowledge of the arch to create massive arched domes. Those concrete-style domes needed equally large supporting walls to keep the entire structure from crashing to the ground. In short, huge old domes were heavy and bound to fail at some point, and they took years to complete.
In 1926, the world’s first geodesic dome opened in Jena, Germany, as a planetarium funded by optics manufacturer Zeiss. Zeiss engineer Walter Bauersfeld conceived the project and constructed the planetarium.
In the 1950s, Buckminster Fuller was credited with popularising something futuristic like geodesic domes in the United States. Fuller titled these buildings “geodesic,” even though he neglected to cite Bauersfeld. Before designs in his patent application, Fuller was awarded a U.S. patent in 1954, although Bauersfeld designed and built his dome 26 years earlier in Germany.
Fuller took his dome design inspiration from the world around him. He was intrigued by the structure uniformity of things like snowflakes, seed pods, flowers, and crystals and determined that humans should mimic those simple, strong, and noticeably spherical arrangements [source: The Futurist Nov-Dec 1989 v23 n6 p14(5)].
The geodesic dome was appealing because it was extraordinary strength for its weight and “triangulated” surface, providing an inherently stable structure, and because a sphere encloses the greatest volume for the least surface area. He began construction on his first dome in 1948. That dome immediately failed due to the weak and thin Venetian-blind slats he used. Subsequent (and much more successful) models introduced strong, lightweight materials such as aluminium aircraft tubing. Fuller helped spread and commercialize polyhedral constructions throughout the country, which he saw as an economical, efficient way to address the post-World War II housing shortage.
His geodesic domes were partly successful thanks to a structural principle that Fuller coined – tensegrity. Fuller said, “Before meeting Kenneth Snelson, I had been ransacking the Tensegrity concepts for twenty-one years. I had used the multiple rimmed, parallel or concentric wire wheel phases of Tensegrity since 1927.” (Fuller, 1961)
Tensegrity is a word made of two others—tensional and integrity—and refers to the relationship and equilibrium between tension (Stretching force) and compression (a force that shortens or crushes something) in a structure. Unlike arches that need buttresses to prevent them from spreading due to outward forces, the modern dome uses tension to keep it from spreading.
The low quantity of materials required for geodesic domes, matched with their durability, good appearance, and ease of construction, has made them a popular choice for various structures and applications worldwide.

Figure 1 -Amundsen-Scott South Pole Station in Antarctica
In 1971, the Amundsen-Scott South Pole Station in Antarctica installed a structurally supported aluminum dome, the dome was intended to last for only 10 years, a maximum of 15 years, but in the end, was in use for about 35 years. It resisted winds of around 322 kilometres per hour and heavy snow loads. The dome was designed and built by a California company that was co-founded by Donald Richter, who learned geodesic dome design from the inventor Buckminster Fuller.
The South Pole dome was one of the first structures to use a multi-frame system, since then it has been used in thousands of domes designs around the world. It was said that it was one of the first of that kind, and that was kind of a pioneer dome. The South Pole dome was also the first to be analyzed by a computer. (Source: The Antarctic Sun, pg15, November 25, 2001)

Figure 2-© Archives de la Ville de Montréal, VM94-EX136-779
The most impressive was the eye-catching US Pavilion at Expo ‘67, the World Fair held that year in Montreal. It caught the attention of futuristic architects worldwide, especially the young architect Norman Foster, who employed Fuller as a consultant for his successful London studio until Fuller died in 1983.
Since then, it is well known that geodesic domes withstood natural disasters like hurricanes, earthquakes, and fires better than rectangle-based structures.
Aluminium dome roof Aboveground Storage Tanks (AST) are used globally today. Although it dates back almost a century, the reasons for their use of petroleum tanks evolved over the past 40 years.
The same company installed the first aluminium dome in 1968 for a water storage tank, in 1969 for a wastewater tank, and in 1977 for a petroleum tank. It was only in 1989 that API produced API 650 Annex G: “Structurally-Supported Aluminum Dome Roofs.”
The initial purpose of Aluminum Dome Roof Tanks (ADRTs) for petroleum in the US was as weather covers to keep snow and ice off the decks of external floating roofs (EFRs). Other reasons were their strength-to-span ratio and lightweight, which made it very desirable to use and retrofit existing tanks.
An example is in the early 1960s, when Colonial, a tank farm owner in the US, only had steel EFRs in its tank farms. By 1978, they had evaluated several roof replacement options and decided on ADRT with an aluminium internal floating roofs (IFRS) deck. This was adopted as the company’s standard roof design for replacements and new tanks.
By 1980, some tank owners began to cover tanks, replacing EFRs with lower-profile internal floating roofs (IFRS). This increased the working capacity, reduced emissions, reduced product vapour loss due to evaporation, and stopped the wind-induced VOCs associated with an EFR due to design. Studies proved that the ADRT was identified to improve fire safety, and over 70 per cent of large-diameter AST fires occur with EFRs. While writing this document, a fire broke out on 22 May 2020 and damaged a crude oil AST with an EFR in Hengyuan Refining Company in Berhad, Port Dickson, Malaysia.
ADRTs are structurally supported and avoid internal steel roof pillars or columns, thus avoiding column penetrations, corrosion, and coating costs associated with steel roofs. AST operators reported lower internal tank temperature with tanks fitted with geodesic domes, thus reducing product evaporation due to lower product temperature. By 1982, geodesic dome installations spread south to Brownsville, Texas. By 1985, gasoline additives and water disposal drove more conversion of EFRTs to domed EFRs or replacement of EFR with IFR altogether and retrofit it with a geodesic dome.
The API Committee on Evaporation Loss Estimation (CELE) produced the Manual of Petroleum Measurement Standards (MPMS) Chapter 19. This has emission factors for various AST configurations. Sample emission calculations in MPMS Chapter 19.2, Section 5 — using a 30,48 Meter (100-foot) -diameter EFR as a baseline — indicate emissions are reduced to 35 per cent for an IFR and 10 per cent for a domed EFR.
In 2006, API CELE research collected thermal data on geodesic domed ASTs and EFR tanks located in Dammam, Saudi Arabia, and Edmonton, Alberta. EFR tanks had slightly lower “average bulk temperature” — EFRs lose heat rapidly at night, whereas ADRTs do not, but diurnal daylight surface liquid temperature peaks. This resulted in lower overall emissions for domed EFR tanks.
API MPMS 19.4 includes thermal research information in Annex I and a table comparing superior reflective properties for mill-finish aluminium versus steel-painted white (or other colours).
In the US, the states and local jurisdictions issue air permits, and the goal is to reduce VOCs further. Considering wind reduction factors alone, before thermal benefits from high reflectivity and low emissivity of aluminium, the South Coast Air Quality District of Southern California 2001 issued SCAMD Rule 1178 to reduce emissions inventory. It states that the vapours around stored product storage tanks must be contained and regulated, and it considers the aluminium geodesic dome as the ‘perfect’ solution, thus requiring the conversion of EFR tanks to domed ASTs.
Initially, the industry covered the tanks due to snow, rain, and possible sandstorms. However, reduced vapour loss, lower product temperatures, and lower emissions are additional benefits. Lower VOCs and clean air requirements are the driving forces behind improving the ADRTs.
Overall, the geodesic dome’s genius, engineering, and design, as well as its benefits to the tank industry as a long-term asset, were timely. So now, let us dive deeper into the theory behind the Geodesic Dome.
Geodesic domes incorporate the strength of a strong sphere/arch shape and are also made up of many triangles. The success of the dome as a structure is a result of the natural integrity of its shape. The dome uses the same curved shape, which gives the arch strength. The only difference is that tension is used to prevent it from spreading.
As it is well known, the triangle is the strongest shape because it has fixed angles. It is the only configuration of an artefact that is steady within itself without needing added support at the intersection points to prevent the geometry from distorting.
Arches, conversely, are three-dimensional constructs that use triangles resembling spheres to create multiple load-bearing paths from the apex centre to the point of structural support.
Pair Arches with Equilateral and Isosceles triangles and have one extremely lasting formation called the geodesic dome. Thus, if you apply pressure to one side of a triangle, that force is equally spread to the other two sides, transferring the load force to adjacent triangles. Triangles are crucial to the design strength of a dome. This distribution of the force is how geodesic domes effectively spread stress along with the entire shape.
The geodesic domes are designed with inward-tilted pentagons or hexagons in a sphere shape. The hexagon and the Pentagon can be precisely divided into triangles, so they are also inherently strong.

Dome frequency is represented by the Letter “v”, e.g. 2v is a 2-frequency, 3v is a 3-frequency dome, etc. The higher the frequency, the more triangles there are in a geodesic dome. Almost all geodesic domes are based on the Icosahedron (fig 3.) but could also be designed from other platonic solids: dodecahedron, octahedron or tetrahedron.

The Icosahedron is a geometric solid with 20 faces. Each face of the Icosahedron is made of an equilateral triangle. When the bottom of the Icosahedron is removed, it becomes a 1- 1-frequency or “1v” dome. All struts in a 1v geodesic dome are the same length, but 1v geodesic domes have several limitations in the optimal length vs strength of the struts. To design a geodesic dome with a larger area, we need to break each of the 1v triangles into smaller triangles through “tessellation”.

So here is the secret of how the lengths of the tessellated triangles cause the vertices to be pushed out into a sphere. The edges of the struts outside the tessellated triangles in higher-frequency domes are always shorter than the middle. (fig- 8)

Another reason is that each corner of the original Icosahedron triangle is part of a 5-way connection, which, if flattened, creates a 72-degree angle (Fig. 9).
The interior angles of the triangle are part of a 6-way connection, and normally, the sum of the three angles of a Euclidian or “flat” triangle creates a 180-degree angle. However, this Geodesic Dome triangle is being applied to a positive curvature of a sphere and so it must follow the rules of “spherical geometry,” which states that every triangle applied to the positive curvature of a sphere must exceed 180 degrees.
This means that the 60-degree angles in this diagram are greater than 60 degrees. These 60+ degree angles, along with the 72-degree angles in the corners, will cause the triangles to bend away from a flat plane so that the vertices will follow the curved surface of a sphere.

This combination of these 5-way and 6-way connections and their 72-degree and 60+ degree angles, along with the shorter edges on the outside of the Icosahedron triangle, will bend each Icosahedron face into a 3-dimensional curved surface to create a portion of the Geodesic Dome.
Nature. Steel cone roofs and aluminium geodesic domes are engineered for maximum weather tightness, and thus, they are an ecological aspect combined with economic benefits. To prevent the stored product from being contaminated by elements of nature like snow, rainwater, sand, and other foreign matters, it was and still is today an important factor. What is the long-term benefit, and does the owner get a return on investment since this is a plant asset? Let us jump into it.
Roof Drains. Many open-top tanks with carbon steel EFRs have drainage issues with their roof drain system during the severe rainy season, hurricanes, and snow season. With the geodesic dome’s spherical shape, a drainage system is unnecessary, and the concern that your floating roof will sink into your product is dismissed.
Self-supporting clear span. Inherently, geodesic domes have an excellent strength-to-span ratio. It is self-supporting, allowing domes to span a large area without structural support columns. Over the years, the increase in the demand for storage of oil & gas products has increased the size of the storage tanks. The benefit of a clear-span self-supported aluminium geodesic dome is that it eliminates the columns required for a typical steel cone roof installation. Columns are emission risk points, and by removing them, your tanks gain emission credits from local government and international environmental agencies.
Columns and IFRs. No structural support columns mean that no columns will pass through the IFR or decks, increasing the system’s efficiency. This advanced constructional design significantly reduces evaporation loss and emissions.
Wind. As per API 2517, evaporation losses in EFRs are a function of wind speed. However, the geodesic dome prevents evaporation loss by deflecting the wind over the top, eliminating the vortex effect of wind passing over the top of an EFR. It also aids in odour control because of reduced emissions.
Loads. The dome’s design strength allows it to handle additional loads. Suspending IFRs from the dome roof increases the storage tank’s overall usable capacity. Any additional required loads, such as snow, wind, and other possible loads, are considered and calculated during the dome’s design phase. This also provides maintenance benefits.
Maintenance. Suspending IFRs from the roof allows for removing the IFR legs and determining the lowest possible point inside the tank. You can set a reasonable maintenance roof level above the floor without legs. This will ease the difficulty of accessing equipment in/out of the tank during out-of-service work.
Corrosion. Geodesic domes usually require less maintenance than a steel cone roof. It is corrosion resistant, and no corrosion dictates less debris that gets on your secondary seal system, which can create holes, causing emission leaks. No time-consuming repair process is required, such as sandblasting and painting the underside of the steel cone roof during out-of-service maintenance. Besides, the top side of the steel cone roof must be sandblasted, repaired, and coated to prevent corrosion-based damage to the roof surface.
Painting. Geodesic domes do not need to be painted for corrosion protection; a natural oxidation process occurs, creating a thin layer of protection over time. This is a huge cost-saving and adds to the return on investment (ROI) over the life of the storage tank.
Thermal Effects. The Aluminum Geodesic domes have a superior reflective property for mill-finish aluminium. They protect the stored product from UV and weather exposure, allowing for a cooler product. Covering an open-top EFR tank reduces emissions due to direct sunlight exposure, resulting in lower overall product temperature. A dome installed over an EFR can cut emissions by over 90%.

Weight. The geodesic dome is a lightweight construction. The weight of a geodesic dome is about 1/3 in weight or less compared with a self-supporting steel cone roof. For new tanks, the lightweight allows cost savings on the foundations and the tank shell. Due to the lightweight of the dome, it is also suitable for retrofitting existing tanks, which were initially designed to operate without a roof. (Fig 11)
Installation. A Geodesic dome can be installed while the tanks are in service. It could be built on the ground beside the tank or even on an EFR and lifted into place with a crane. The construction of the geodesic dome does not require any hot work. It takes less time, and the customer can have the tank in service much earlier than it will take to finish a steel cone roof that needs to be welded. An example indicated that for an ADRT with IFR, a 68% lower labour requirement was needed – 6880 man-hours vs 21930 man-hours. Installation was done approximately 40% of the time with a lower-skilled labour team. (Fig. 12)
Pressure. Unless the customer specifies a different request, the Internal design pressure shall not exceed the roof’s weight. The internal pressure of ADRTs is limited per API 650 G.4.3 to 9″ of water. Testing has been performed to 26″ of water, and petroleum applications are in service to 17″ of water. The ability to contain pressure is specific to the design and manufacturer.
Gasket compatibility. A critical aspect that geodesic domes must consider is the gasket compatibility with the product stored in a storage tank when NO floating roof is used.
Lightning. EFR tanks could accumulate potential charges due to steel-to-steel contact and be a potential ignition source upon lightning strikes. It is the opinion of many manufacturers that the Aluminum Dome roof does serve to provide the Faraday Cage Effect, even though that metallic shell is very thin. If no combustible vapours are present in the atmosphere due to emissions, there should be little to no concern with lightning. There should be no reason to additionally protect a dome-covered internal floating roof from exposure to lightning, as the Faraday Cage has proven effective. Still, bonding IS required per API 650-H for other purposes. Aluminum does not hold a static charge and will not spark; it will dissipate atmospheric discharge.
The original objective of aluminium geodesic domes covering tanks remains an efficient, cost-effective means of reducing maintenance and operating costs. Still, recent motivation and market drivers are to reduce further the emissions of VOCs associated with petroleum storage tanks.
There are plenty of manufacturers worldwide, and each has its unique propriety design features and specific benefits for the customer. As such, customers should take a structured approach to ensure they select the correct Geodesic Dome that provides the best value for the application.
A small evaluation has been made between manufacturers in the market, highlighting the features and benefits required to decide. You could make your bid evaluation much easier by evaluating these components, asking the right questions, and factoring in the variance.
The main components important to mention for evaluations are the beam, batten bars, nodes, support structures, and accessories available.
Beams and Batten bars design (Fig 14 – Fig 18)


The Node
The Node is where the beams and plates meet and are connected to upper and lower flanges to resist transverse deflection. These nodes need to be water—and gas-tight and are thus fitted with hubs with gasket sealing that allows for tight sealing and reduces emissions. In a well-designed, manufactured, and installed dome, the top of the panels and battens are flush, which fixes the main dome leak risk point: the hubs.
The hub design must allow easy cover removal for inspection and adjustment of internal floating roof support chains when fitted.


Support Connection Details
Depending on the application, the dome could be free-ventilated or vapour-tight (fig. 21 & 22). A free-vent eve will be good enough for a standard water tank, but when you dome a petrochemical tank and need to reduce emissions, a vapour-tight design could be requested. A vapour-tight ADR is more expensive due to larger load requirements and will increase material use.
The dome is also designed with either a sliding or a fixed support connection where the beam and the tank wall meet each other. (Fig. 21-23)

Accessories. The ADR is shop fabricated, and to reduce installation time and additional cost, the complete list of additional accessories required on the ADR is included. This ensures that panes and accessories fit each other perfectly, and now, additional cutting and drilling onsite are required.
A list of accessories could include
Construction. The benefit of the Geodesic Dome is that it requires no hot work and is pre-manufactured and shipped to the site in parts where it only requires assembly. The Dome could be assembled INSIDE the tank, directly “In-Place” on the shell support structure of the tank or NEXT TO the tank. The latter method is preferred when the tank is kept in service while the dome is assembled and installed on the tank. A typical application where the tank is kept in service during construction is for a wastewater tank.
There are two methods of construction: one is from the centre cone/hub outwards (Fig 25), and the second is from the outside to the centre (Fig 24). Usually, domes will be erected” in Place” directly on the support structure when there are space constraints. The “In-Place” construction consists of a dome built directly on a tank shell from outside towards the centre.

When the Dome is assembled inside or next to the tank on the ground, the erection process uses tripods or quadpods to lift the dome at each tier. This makes it convenient and safe to work at grade and limits the work at heights. After the dome is constructed, it could be raised to the top of the support structure using winches or cranes. This method ensures a safer, quicker installation process.
Lifting. The dome lifting method will affect installation time and equipment cost (e.g., crane vs. grip hoist). The method that would be possible needs to be clarified in the beginning since it affects the timeline and the cost of the project.
When the Dome is assembled on the floor inside the tank, rigging will be required to fit it on the support structure. This lifting could be done utilizing two methods: grip hoist winches and pulleys (Fig. 27) and cranes for rigging (Figs. 26 and 28).

A crane is the least effective alternative. However, in certain situations, cranes are required when they are available. However, contingent factors such as light wind conditions cause the lightweight dome to sway too much to allow for a safe installation. In Fig. 26 below, four Cranes were used to lift this dome into place from inside the tank.
Once the assembly process of constructing the dome inside the tank has been completed, the erection crew utilizes a system of grip hoist winches and pulleys to hoist it to the top of the shell efficiently. It requires several Grip Hoists (fig. 27) fitted around the top of the tank’s shell so the dome can be lifted in place.
The Crane Erection process consists of assembling a dome on the ground next to the tank and then lifting it into place with a crane. This allows the tank and the dome to be constructed simultaneously and saves valuable time.

The initial cost for a Steel Cone Roof is less than that of an Aluminium Dome Roof, but the cost savings could be realized over the lifetime of the dome due to lower maintenance costs. The increased steel prices and high labour costs make the Aluminium dome roof more attractive. Overall, the dome is more cost-effective in its life cycle compared to the life cycle of a steel cone roof.
About EPCM
Apex Dome by Tank Connections Retrieved 5 21, 2020, from
https://www.tankconnection.com/assets/pdf/Apex_Domes_web.pdf
Ateco dome roof Catalog Retrieved 5 21, 2020, from
https://drive.google.com/file/d/1f4CAm-HyXiL3ywEomvtTceSp_D7K64c0/view
Buckminster Fuller’s 50-foot “Fly’s Eye” Retrieved 5 21, 2020, from archpaper.com
Buckminster Fuller’s 50-foot “Fly’s Eye” is coming to Crystal Bridges
CST Optidome Retrieved 5 21, 2020, from
https://www.cstindustries.com/wp-content/uploads/2019/01/OptiDome_Petrochemical-Data-Sheet_1901-web-version.pdf
Environmental Regulations Drive Changes In Floating-Roof Designs for Storage Tanks – Retrieved 5 21, 2020, from
https://www.bulktransporter.com/regulations/article/21654159/environmental-regulations-drive-changes-in-floatingroof-designs-for-storage-tanks
Fuller, B. (1961). Tensegrity. Portfolio and Art News Annual(4), 112–127, 144, 148. Retrieved 5 21, 2020, from http://www.rwgrayprojects.com/rbfnotes/fpapers/tensegrity/tenseg01.html
Geodesic Dome. (n.d.). Retrieved 5 21, 2020, from Wikipedia: The Free Encyclopedia: http://en.wikipedia.org/wiki/Geodesic_dome
Geodesic Domes and Charts of the Heavens. (n.d.). Retrieved 5 21, 2020, from Telacommunications.com: http://www.telacommunications.com/geodome.htm
Buckminster Fuller. (n.d.). Retrieved 5 21, 2020, from Wikipedia: The Free Encyclopedia: http://en.wikipedia.org/wiki/Buckminster_Fuller
Superior Dome. (n.d.). Retrieved 5 21, 2020, from Webb.nmu.edu: http://webb.nmu.edu/SportsAthletics/SiteSections/Facilities/SuperiorDome.shtml
What is Geodesic Dome Frequency? An Explanation. Retrieved 5 21, 2020, from ziptiedomes.com
https://www.ziptiedomes.com/faq/What-Is-Geodesic-Dome-Frequency-Explained.htm