East Africa Crude Oil Pipeline

1 Background

In 2006, Lake Albert sparked hopes in Uganda when 6.5 billion barrels of oil were discovered in the Albertine Graben, the basin of Lake Albert. Located on the border between Uganda and the Democratic Republic of the Congo, Lake Albert is the northernmost of the chain of lakes in the Albertine Rift.

Oil exploration company Hardman Resources discovered Uganda’s oil at three western fields: Weraga 1, Weraga 2 and Mputa. Out of the 6.5 billion barrels discovered, only 2.2 billion barrels can be extracted. The oil reserves are expected to last up to thirty years, with production peaking at 230,000 barrels a day, so the discovery brought enormous economic hope for one of the poorest countries in the world.

However, Uganda needed a pipeline to transport the oil from the wells to the outside world. Fourteen years after discovering sub-Saharan Africa’s largest oil reserve, a great deal of work has been done in preparation for the construction of the longest heated pipeline in the world. They call it The East African Crude Oil Pipeline (EACOP).

2 Location of the Pipeline

EACOP begins in Buseruka in the Hoima District, 1,120m above sea level in Uganda’s Western Region. It will run for approximately 1,147km from the Uganda-Tanzania border and traverse eight regions and twenty-five districts to terminate at a peninsula north of Tanga in Tanzania. It will travel in a general south-easterly direction, passing through Masaka in Uganda and Bukoba in Tanzania and looping around Lake Victoria’s southern shores.

The Lake Victoria Basin, which 30 million people depend on for their livelihoods, is one of East Africa’s most prominent landmarks. It provides the headwaters of the White Nile and is central to the development and regional integration of the East Africa Community. It is the second-largest freshwater lake in the world.

The Ugandan section of the pipeline will be approximately 296km long, starting near Hoima (close to Lake Albert) and traversing ten districts and 25 sub-counties to the Tanzanian border between Masaka and Bukoba. The Tanzanian section will comprise approximately 80% of the pipeline’s total route length. The oil pipeline reaches a maximum elevation of 1,738m above sea level along the Tanzanian route portion when crossing the East Africa Rift zone. The pipeline continues through Shinyanga and Singida town and terminates at the Port of Tanga—the most northern port city of Tanzania—west of the Indian Ocean.

site

https://www.irinsider.org/environment-1/2021/3/6/east-african-oil-pipeline-sparks-disputes-between-banks-and-ngos

3 Technical Description

3.1 GENERAL STRUCTURE

The 1,444km-long EACOP system, consisting of a 24-inch-wide carbon steel pipeline, will be buried to a depth of up to 2 meters along most of its route. The oil from the Lake Albert basin has a very high viscosity. The entire pipeline will be thermally insulated with polyurethane foam (PUF), and electrical heat tracing (EHT) will be installed. The heating system consists of EHT cables. It is powered through a buried high voltage cable (33kV) that feeds EHT substations and mainline valve sites along the route to maintain a minimum temperature of 50° Celsius. The heat ensures the wax remains a solution. The EHT cables (6.6kV) provide up to 30W/m of heat. The pipeline will be insulated with 70mm of polyurethane foam (PUF) material for heat retention.

For preventive purposes, the pipeline is specified with a fusion-bonded epoxy anti-corrosion coating applied to protect the pipe throughout its operational life against external corrosion. This fusion-bonded epoxy coating will act as a second barrier in water ingress below the bonded thermal insulation system.

3.2 PUMP STATIONS

The pipeline will be buried at a depth of between 1.8–2 meters along most of its length, though it will be buried deeper at river and road crossings. The only elements of the pipeline infrastructure visible are the pumping stations, electrical heat tracing stations, block valve stations, marine storage terminals (MST) and loading facilities.

While the product begins its journey with natural pressure, it loses momentum over time and distance due to friction losses. Pumping stations are positioned throughout the pipeline’s length to intermittently boost the pressure, pump the product along the line, and monitor the flow and other relevant information about the crude transfer. EACOP will have a total of six pumping stations and two pressure reduction stations.

Uganda’s 296km pipeline section consists of two pumping stations to keep the oil moving. It also has nineteen valves at critical locations where the oil flow can be reduced or stopped and electrical substations collocated to power the electrically heated cable.

Tanzania’s 1,149km pipeline section consists of four pump stations, two pressure reduction stations (PRS), fifteen prefabricated electrical heat tracing (EHT) substations, and an integrated SCADA/ICS system using fiber-optic cabling and telecommunications with redundant control functions at Tilenga and a marine storage terminal.

Pump station locations are determined by pipeline hydraulics, taking into account factors such as pipe size, topography, frictional losses related to oil flow, and the location of other pumps in the system. The selection of pump station locations also considers proximity to roads and power lines, land use, and environmental characteristics.

Pump Station #3 is approximately 105km from the Border of Uganda. Pump Station #4 is 205km from Pump Station #3 (PS3) and 214km from Pump Station #5 (PS5). Hydraulic spacing is due to a gradual elevation descent of 143m over the 419km distance. The elevation of PS5 is the lowest of all four stations, with an elevation ascent of 454m before reaching Pump Station #6. The permanent access road of approximately 800m is also the shortest of all of Tanzania’s facilities. Each pump station is self-contained with its power generation.

Each pump station will require a total area of 310 × 400m plus a 50 × 50m helipad. Each pump station will establish security facilities and an emergency evacuation area outside the pump station fence. The emergency pipeline repair system (EPRS) will most likely be at PS3 and PS5 and the marine storage terminal (MST), or close to existing industrial activities near the EACOP route.

4 Completion

Final project investment decisions are expected to be issued by partners by December 2020. Construction of the project infrastructure is expected to begin in early 2021. Other pending agreements include the Shareholders’ Agreement (SHA), Ports Agreement (PA), and Land Lease Agreement (LLA). Following the global pandemic, the Ugandan government has officially announced that the final investment decision for the EACOP project will be signed off during the first quarter of 2021 to 21 November 2021.

5 Participants

In April 2020, Tullow Oil Plc sold its interests in Uganda’s Lake Albert development project—including the East African Crude Oil Pipeline—to Total SA, for US$575 million. As of April 2020, the owners of the EACOP are Total SA (with 45%), Uganda National Oil Company (UNOC) (15%), China National Offshore Oil Company (CNOOC) (15%), and Tanzania Petroleum Development Corporation (TPDC) (5%).

6 Financing

The EACOP project is estimated to cost $3.5 billion and is built to transport crude oil from Uganda’s oil fields in Hoima to the Tanzanian port of Tanga. The 1,444km planned pipeline is expected to be built at a budgeted cost of US$3.5 billion. 30% of the project costs are expected to be provided by the equity investors in the project, with the remaining US$2.5 billion to be provided via project finance loans.

Negotiations and the search for international lenders are ongoing. The Standard Bank of South Africa is advising Uganda and Tanzania, while Sumitomo Mitsui Banking Corporation is advising Total SA. The London-based law firm Clifford Chance is advising Total SA on legal matters, while the Industrial and Commercial Bank advises CNOOC of China. The Standard Bank of South Africa and Sumitomo Mitsui are also acting as joint lead arrangers for the project loan.

The Sumed Pipeline

1 Background

After Egypt closed the Suez Canal during the Six-Day War, for precisely eight years from June 1967–1975, the project for an alternative route and oil pipeline from the Red Sea to the Mediterranean commenced. The establishment of SUMED (also known as the Suez-Mediterranean Pipeline) pipeline company was agreed upon in 1973 between five Arab governments.

By linking the Red Sea to the Mediterranean, the cross-border pipeline allows Gulf nations to deliver oil to European markets. The pipeline would act as an essential alternative delivery system that bypasses and complements tankers used in the Suez Canal. It is a substantial revenue earner for the Egyptian government.

2 Location

The SUMED Pipeline is a crude oil pipeline located in Egypt. It competes with the Suez Canal by transporting crude oil from large tankers that can’t pass fully-laden through the Suez Canal. It runs from the Ain Sokhna terminal in the Gulf of Suez, near the Red Sea, to offshore Sidi Kerir, Alexandria in the Mediterranean Sea. By linking the Red Sea to the Mediterranean, the SUMED is a cross-border pipeline and an alternative to the Suez Canal that allows the Gulf nations to deliver oil to European markets.

site 2

http://tekmormonitor.blogspot.com/2017/09/saudi-aramco-plans-extra-sumed-crude.html

3 Technical Description

The SUMED pipeline is 320 kilometres (200 miles) long and is made up of two parallel pipes of 42 inches (106.68cm) in diameter. It links the Ain Sukhna terminal on the Gulf of Suez to the terminal at Sidi Kerir and can transport different grades of crude oil with minimal contamination.

The pipeline has a capacity of 2.5 million barrels of oil a day and pumped a record 113 million tons in 2006. It can accommodate both very small tankers and those over 500,000 tons. Many tankers too large to use the Suez Canal can unload a portion of their oil in Ayn Sukhna, sail through the canal, and reload in Sidi Krayr.

The vast majority of crude entering the SUMED pipeline comes from Saudi Arabia, with Kuwait and Iraq contributing much less. Almost 80% of the oil shipped from the Arabian Gulf to Europe passes through the SUMED pipelines.

4 Completion

The establishment of the pipeline company was agreed upon in 1973 between five Arab governments. The consortium opened the pipeline in 1977.

5 Participants

The pipeline is majority-owned by Egypt’s state oil company, the Egyptian General Petroleum Corporation (EGPC). Saudi Aramco, the Kuwait Investment Authority, and Qatar Petroleum have smaller shares. Ownership breakdown is as follows: EGPC (50%, Egypt), Saudi Aramco (15%, Saudi Arabia), International Petroleum Investment Company (15%, the United Arab Emirates), three Kuwaiti companies (each with 5%), and Qatar General Petroleum Corporation (5%, Qatar).

6 Financing

The SUMED pipeline was financed by a consortium of Arab countries: primarily, Saudi Arabia, Kuwait, and Egypt.

Nembe Creek Pipeline

1 Background

Nigeria is Africa’s largest oil producer and ranked as the 11th-largest oil producer in the world; a top crude oil supplier for the US. The Nembe Creek Trunkline (NCTL) was constructed in the Niger Delta by the Shell Petroleum Development Company of Nigeria (SPDC) as a replacement for the ageing Nembe Creek Pipeline suffered significant losses due to ongoing fires, sabotage, and theft. NCTL is one of Nigeria’s major oil transportation arteries that evacuate crude from the Niger Delta to the Atlantic coast. The project replaced more than 1000 km of deteriorated major pipelines and flowlines.

2 Location

OML 29 is a large block located in the southeast Niger Delta. It contains 11 oil and gas fields, the largest of which is Nembe Creek. The pipeline runs from the Nembe Creek oil field in the Niger Delta to the Bonny export Oil Terminal, located in Rivers State. Crude is exported by the NCTL, which runs 97 kilometers east from Nembe Creek to the manifold at the Cawthorne Channel field on OML 18. From here, crude is evacuated the short distance to the Bonny oil terminal.

3 Technical Description

NCTL is a 97-kilometre pipeline that involves three sectional pipelines: 5km of 12-inch-diameter pipeline from the Nembe Creek III manifold to the Nembe Creek tie-in manifold; 44 km of 24-inch-diameter pipeline from Nembe Creek to San Bartholomew; and 46 km of 30-inch-diameter pipeline from San Bartholomew to Cawthorne Channel. The transportation capacity is 150,000 b/d at Nembe Creek, however, up to 600,000 b/d of liquids can be evacuated from the endpoint at Cawthorne Channel, moving oil from a total of 14 oil-pumping stations.

4 Completion

The construction of the NCTL started in 2006 and was commissioned in 2010 at the cost of $1.1 billion.

5 Participants

NCTL was constructed by Shell Petroleum Development Company (SPDC) in a joint venture comprised of Total E&P Nigeria Limited and Nigerian Agip Oil Company Limited. Aiteo Group owns the NCTL, which recently purchased it from SPDC as part of the related facilities of the prolific oil block OML 29. By March 2015, the SPDC—a subsidiary of Royal Dutch Shell plc (Shell)—completed its interest in OML 29 and the Nembe Creek Trunk Line to Aiteo Eastern E&P Company Limited, a subsidiary of Aiteo Group. The other joint venture partners, Total E&P Nigeria Limited and Nigerian Agip Oil Company Limited, also assigned their interests of 10% and 5% (respectively) in the lease, ultimately giving Aiteo Eastern E&P Company Limited a 45% interest in OML 29 and the Nembe Creek Trunk Line.

6 Operations

In 2012, Shell estimated that 140,000 barrels of crude oil, valued at $16 million, was being stolen daily. In December 2011, barely one year after the line was commissioned, the pipeline was shut down for one month to repair leaks caused by crude thieves. On 2nd May 2012, NCTL shut down the NCTL pipeline due to constant crude theft activities, and on 4th May 2012, SPDC declared a force majeure on outstanding cargoes of Bonny Light.

Tazama Pipeline

1 Background

In 1965, more than 90% of Zambia’s oil import were routed through Rhodesia. In November 1965, Rhodesia had a Unilateral Declaration of Independence which forced Zambia to import all of its petroleum products by road tankers through the port of Dar es Salaam. Zambia airlifted supplies until October 1966, by which time, a less costly and more independent road transport organization was operative—Tanzania Road Services Ltd. was formed in June 1966. Still, the roads were not capable of carrying the traffic, and many people lost their lives. A pipeline was needed.

In January 1967, the Tanzanian and Zambian government negotiated a pipeline convention to regulate the pipeline’s construction, operation, and maintenance. They also sought control of such matters as tax status, wayleave easements and ownership, shareholding, market share, and other rights and privileges. The two governments constructed the TAZAMA Crude Oil Pipeline due to Zimbabwe’s unilateral declaration of independence and the British policy of economic sanctions against Zimbabwe. (TAZAMA stands for Tanzania Zambia Mafuta and “Mafuta” means “Oil” in Kiswahili.)

2 Location

The TAZAMA Pipeline (also called Tanzania–Zambia Crude Oil Pipeline), runs from the Single Point Mooring terminal at Dar es Salaam, Tanzania, to the Tanzanian and Italian Petroleum Refining Company (TIPER) refinery in Dar es Salaam and then to the Indeni refinery in Ndola, Zambia. The pipeline passes through or near the following parks, cities and towns: Dar es Salaam, Morogoro (which hosts the Mikumi National Park, Elephant pass), Iringa, Mbeya, Chinsali, Kalonje, and Ndola.

site 3

https://ftldrc.com/experience/

3 Technical Description

3.1 GENERAL STRUCTURE

TAZAMA is the longest pipeline in Africa, requiring 45,000 tons of steel pipe after being imported from Italy via the Cape. The pipeline travels approximately 1,710 kilometres (160 miles) from the Single Point Mooring terminal at Dar es Salaam to the Indeni refinery Ndola Zambia. For 954 kilometres (593 miles), the pipeline has a diameter of 8 inches (20cm); for the remaining 798 kilometres (496 miles), the pipeline diameter is 12 inches (30cm). The flow rate of the crude oil is 230 km/h (1.8 Mlcm/year).

3.2 SINGLE POINT MOORING FACILITY (SPM)

Once offloaded from the tanker, the crude oil starts its journey via the Single Point Mooring Facility pipeline on the Indian Ocean. The oil tankers dock at the Single Point Mooring (SPM) facility, about 7km from the TAZAMA Tank Farm. At the SPM, Crude oil is pumped from the ship using flexible pipes, which lie on the sea bed, extending 3km from the shoreline. The crude then flows into the storage tanks at the TAZAMA Tank Farm.

3.3 TAZAMA TANK FARM

The TAZAMA Tank farm is a storage facility for the crude pumped from ships. It has six storage tanks, each with a capacity of 35,000m3 and a combined total of 210,000m3. The Tank farm also has a pump station, which pumps the crude through the pipeline. Each pump station gives the crude oil enough pressure to flow to the next pump.

3.4 PUMP STATIONS

The Morogoro Pump Station is about 200km from Dar es Salaam. There is a total of 7 pump stations along the pipeline from Dar es Salaam to Ndola. Due to the hilly terrain in Tanzania, there are 5 pump stations to push the crude through the pipeline, which, in one instance, is at an almost vertical angle. In southern Tanzania, the terrain is rugged with many rivers and the two arms of the rift valley system to be crossed. From Dar es Salaam, the pipeline climbs to almost 7000 feet in southern Tanzania before following the comparatively easy watershed route through northern Zambia to Bwana Mkubwa at 4200 feet above sea level. There are two pump stations in Zambia, which has a relatively level terrain. All seven pump stations use reciprocating engines which run on crude oil.

4 Completion

In 1968, TAZAMA Pipelines Limited was incorporated. The pipeline was commissioned in 1969. In 1991, there was a repair and part-replacement of the existing 8″ diameter and 12″ diameter pipelines. The World Bank supported the project. The same engines that were installed 40 years ago are still in operation at the pumping stations.

4.1 POTENTIAL UPGRADE

As of November 2016, both the Tanzanian and Zambian governments have discussed either modernising the ageing TAZAMA pipeline or creating a new pipeline to run parallel to the original. The new project aims to facilitate the transportation of crude oil, refined oil, and natural gas.

In May 2020, TAZAMA Pipeline said that it was seeking a $400 million loan to expand the 954-km, 8-inch portion of the pipeline to the total 12-inch diameter of the remainder of the pipeline. With the loan, Sunyama, TAZAMA’s Tanzania Regional Manager, says that the company will be able to upgrade the entire pipeline to 12 inches. The current pipeline’s diameter limits its pumping capacity to 2 million litres a day, while the upgrade would drastically increase the capacity to approximately 1.1 billion litres a day.

5 Participants

The pipeline is owned and operated by TAZAMA Pipeline Limited—a joint company of the governments of Zambia (66.7%) and Tanzania (33.3%)—with headquarters in Ndola Zambia and an office in Dar es Salaam, Tanzania.

6 Financing

The TAZAMA pipeline was funded by Mediobanca, a consortium of Italian banks. The term is 6%, repayable in 15 equal annual instalments beginning one year after the pipeline became operative. Early in 1967, separate agreements were signed between the governments of Italy and Tanzania and Italy and Zambia to provide Italy with credit of 5,542,407 and 11,070,00 GBP respectively, for pipeline construction. Repayments of the loan will be made from the current earning of the pipeline despite estimated running costs of 400,000 a year.

Chad-Cameroon Pipeline

1 Background

Oil exploration began in Chad in 1969. Several oil discoveries were made in both the Lake Chad Basin and the Doba Basin in southern Chad by a consortium comprising Chevron, Conoco, ExxonMobil and Shell in the 1970s. However, Chad’s oil industry never had much chance of getting off the ground due to civil war and political instability from 1965 until the early 1990s. With the return of peace to the country in the early 1990s, the rising price of oil and the United States of America’s increasing interest in diversifying its sources of oil led to renewed interest in Chad as an oil-producing country and a serious player in the petroleum industry.

In 1996, ExxonMobil discovered between 800 million and 1 billion barrels of oil in the Doba basin. This finding set into motion what would become the Chad-Cameroon Pipeline and Project Development, one of Africa’s most significant private sector investments. The project was developed by a Consortium of ExxonMobil (USA), Chevron (USA), and Petronas (Malaysia), with ExxonMobil (also known as Esso Exploration and Production Chad Incorporated, EEPCI or Esso) as the operator.

Today, Chad is the 11th biggest oil-producing country in Africa and the 48th largest oil-producing country globally.

2 Location of the Pipeline

Chad is located in Central Africa and without direct access to the sea. It requires a pipeline to bring its oil to the world. The Chad–Cameroon Petroleum Development and Pipeline Project is near Doba in southern Chad.  The project consisted of developing three oil fields (Komé, Bolobo and Miandoum) in the Doba region with a buried pipeline to link them.

In the savanna of southern Chad, an intricate maze of pipes, tanks, and processing equipment at the Central Treatment Facility turns frothy emulsion from 300 oil wells into valuable pure crude oil. The Chad-Cameroon oil pipeline transports the crude oil from southern Chad through a tropical forest to Kribi, Cameroon’s Atlantic coast. From there, the oil is shipped to floating storage and offloading vessels, 11 km (7 miles) offshore for export, ready for sale in global markets.

site 4

https://www.researchgate.net/figure/Map-of-Chad-Cameroon-Oil-Pipeline_fig4_317551747

3 Technical Description of the Pipeline

The Chad-Cameroon pipeline is a 1070-kilometre-long, 30-inch-wide buried pipeline. There is no refinery for the Doba crude to be sent to, so the oil goes straight into the pipeline and directly onto supertankers parked off the Cameroonian coast.

In Chad, there are three oil fields near Doba (called Komé, Miandoum, and Bolobo), two collecting stations, and one pumping station. The Central Treatment centre (Komé) can produce up to 225,000 barrels per day of crude. In Cameroon (Dompta, Belabo), there are two pumping stations, a pressure reduction station (Kribi), and offshore floating storage, reaching 12km. The three fields (Komé, Bolobo and Miandoum) were expected to yield an average of 225,000 barrels per day (BPD) but, over an operation period of 25–30 years, Crude Oil recovery is approximately 1 billion barrels.

4 Completion

The pipeline project was initiated in 1976 but took 27 years from concept to completion. Chad was in desperate need to exploit its profitable natural resources, and quickly. The World Bank approved the project on 6th June 2000. On 26th October 2000, the Chad-Cameroon pipeline project was launched. It was completed in June 2003, one year ahead of schedule. The pipeline achieved its first oil in July 2003.

5 Participants

The Chad-Cameroon Petroleum Development and Pipeline Project was an agreement between the Chad and Cameroon government, a consortium of oil companies, and the World Bank.

The original consortium of oil companies involved was Exxon, Royal Dutch Shell, Elf Aquitaine. In 1999, Shell and French oil company Total (then known as Elf Aquitaine) withdrew from Chad due to civil unrest,

In April 2000, Petronas of Malaysia and Chevron acquired stakes in the project. Exxon then enlisted the support of the World Bank to raise support within the international community. The World Bank agreed on the condition that specific environmental and social standards were enforced both in Chad and Cameroon and that the revenues be put towards improving social and economic conditions.

In 2000, a new oil consortium emerged—including Exxon (operating in Chad as Esso), Chevron, and Petronas—and formed the Tchad Oil Transportation Company. The Consortium was American-led, with Exxon and Chevron combined holding 65% of the stake in the deal. The consortium promised an investment of $3.7 billion to drill Chad’s oil. The World Bank’s support was significant for the consortium of oil companies and they believed that they needed the World Bank’s support for the project to succeed.

6 Financing

The total cost of the project was estimated at US$3.72 billion, with the costs of the export system accounting for US$2.2 billion. While the private project sponsors, the Upstream Consortium, provided about 95% ($2.2 billion) of the financing for the pipeline, the World Bank also contributed through debt financing. The International Finance Corporation (IFC) provided a loan of about $100 million, $85.8 million of which went to the Cameroon Oil Transportation Company (COTCO) and $14.2 million to the Tchad Oil Transportation Company (TOTCO). They also helped to secure an additional $300 million in private commercial lending.

7 Controversies

The Chad-Cameroon Petroleum Development and Pipeline Project was opposed by over 80 environmental and human rights groups during its construction due to political, economic, social, and environmental concerns, yet it was also hailed as the best method for reducing poverty in Chad.

1 Introduction

1.1 Heap leach fundamentals

The purpose of mining is to provide beneficial minerals demanded by modern society. For doing so, mining companies secure resources from mineral deposits worldwide and use different techniques to recover the valuable materials from the ore.

The selection of a suitable technique, which is both economically viable and environmentally safe, to process mineral resources largely depends on the type of ore that is mined and the physical conditions associated with the mine site’s location.

Heap leaching is a well-established mining technique enabling the processing of different ores that could not otherwise be exploited under viable economic conditions. Modern-day heap leaching, which has a comparatively low level of energy consumption, is, for example, successfully utilised for the beneficiation of certain types of gold ores. As a result, it contributes to the substantial development of a sustainable gold mining sector in many countries.

In other words, heap leaching is among the best available techniques (BAT) for suitable ores for the reason that it allows the cost-effective processing of ore that would otherwise be uneconomic under circumstances that can technically attain acceptable regulatory levels of environmental risk mitigation.

Pertinent ore beneficiation technologies as a function of ore grade

Figure 1. Pertinent ore beneficiation technologies as a function of ore grade. Source: http://www.euromines.org/files/mining-europe/mining-techniques/batforheapleaching-feb2013-c.zanbak-euromines.pdf

Cyanidation entails both heap and tank leaching. Wastes include spent ore and tailings with residual cyanide levels. Before final closure, these excess materials are usually processed to neutralise or destroy cyanide.

1.2 Mining waste

As a result of the essence of mining and mineral processing, the size of mining wastes are unquestionably larger than those of both domestic and industrial wastes. The waste’s chemical characteristics — particularly the mobility of metal constituents — are often of concern. For instance, the volumes of mine waste greatly exceed the total volumes of materials handled by civil engineering activities worldwide. The crushed rock circulated into the processing plant to extract the desired product is off-loaded from the plant’s tail end, and in many parts of the world, composes the greatest volume of mine waste. However, at open-pit mining enterprises, the volume of waste rock may exceed the volume of tailings.

Tailings dams store fine particulate matter in the form of impoundments. The material is implanted hydraulically and so is loose and nearly saturated. Consequently, any significant movement of the retaining boundaries can prompt shearing strains that derange the structure of the tailings mass, inducing a soaring upsurge of pore water pressures and liquefaction of a section of the impoundment, causing even greater forces to be applied to the remaining boundaries.

Collapse of the retaining dam can release liquefied tailings that can travel for long distances, and because of its greater weight, wiping out everything in its path. Instead of water, which will flow through and around buildings, liquefied tailings can destroy the structures. Thus, the tendency is for tailing dams to become ever higher and impoundments ever larger.

Similarities between embankment dams designed to collect water and tailings dams have enabled many of the design techniques used with the former to be applied to produce safe tailings dams. However, despite significant improvements, a tailings dam has reported a failure almost every year for the past 40 years.

The damage caused by these failures in the form of casualties, pollution of the environment, destruction of property, disruption of communications, and economic loss to the mining industry is enormous.

A huge pile of mine tailings at the now closed Anaconda Copper Mine near Darwin California

Figure 2. A huge pile of mine tailings at the now-closed Anaconda Copper Mine near Darwin, California. Source: https://search.creativecommons.org/photos/309d1a2a-c461-4348-b157-e84b7f1feb71

1.3 Why are standards useful?

Heap leach management and tailings dam standards mainly emanate from a standard known as civil society sector standards. These reflect a confluence of the growth of higher incomes in major consuming markets and the globalisation of value chains. As prosperous economies grew in wealth, so civil society organisations grew in importance. They began to pinpoint the ethical and environmental character of the products which they were consuming. Under what conditions were labour employed in meeting the products which they utilised? What was the impact on the environment of the products which they consumed? Were these products safe to use?

Given the flourishing role of standards in global value chains, governments and international agencies are providing support for dedicated producers — these are progressively seeking to enter the global economy to provide for sustainable income growth. However, promoting standards is a complex challenge, and a suitably multi-pronged and nuanced response is required.

Consequently, there are five main reasons why standards have become necessary for producers participating in global commodity markets:

  1. Standards have become an influential determinant of market access, particularly in high-income spots;
  2. Many high-margin market segments are specified by product and process standards (for example, organic foods);
  3. While developing the capacity to achieve standards, many producers expand capabilities that enhance their efficiency and systematically increase productivity;
  4. However, meeting standards is generally a costly process, and this can act as a barrier to entry for small scale and informal producers;
  5. Standards require coordinated actions along the value chain, and this systemic performance may be hard to achieve.

Indeed, history is full of examples that show the profound importance of standards in shaping the natural resources marketplace and the technologies that come to distinguish it. But at an ultimate level, standards are essential because they state the rules and provide benchmarks and best practices. Moreover, standards are necessary to guarantee that such rules of the game are recognised, adhered to, and respected by all stakeholders.

2 Tailings Dams and Heap Leach

2.1 Tailings dams: What for?

Tailings dams are built to preserve impoundments of tailings, and when possible, the elements extracted from the tailings themselves are used in their construction. Thus, they have many features in common with embankment dams built to maintain water reservoirs. Indeed, in many cases, they are built as water-retaining dams, mainly where there is a necessity for water storage over the tailings. These have to be protected by a water top to prevent aerial pollution.

While identical methods used to design and construct embankment dams can be applied to tailings dams, there are significant differences between the two types. Embankment dams are venerated structures used to profitably store water, whereas tailings dams are required to store unwanted waste desirably at minimum cost. The former are usually built to full height during one construction period, designed and their construction supervised by competent engineers (regulated by law in many countries). Modern tailings dams are also often planned by qualified consulting engineers., but because they are built gradually in stages over the years, and conditions may also change with time, supervision of their construction may become faulty.

Diagrammatic portrayal of a typical gold tailings dam not to scale

Figure 3. Diagrammatic portrayal of a typical gold-tailings dam (not to scale). Source: https://doi.org/10.1002/ldr.681

Knowledge about the factors that command the behaviour of tailings dams has improved dramatically during the past twenty years. Also, the consequences and public perception of failures have increased considerably, causing owners and managers to become more aware of the risks involved in constructing impoundments. Every site and dam is unique, so a linear relationship from one to another is seldom practicable. However, some common principles and the lessons acquired from incidents can be applied somehow to other situations.

2.1 Origins and evolution of heap leaching

Since the early 1980s, heap leaching has evolved into an effective method of beneficiating a wide range of low-grade, oxidised gold ores. It has many benefits over tank leaching, including ease of design, lower capital and operational costs, and faster startup times.

In many cases, heaps are built on lined pads using ore that has been shipped straight from the mine (run-of-mine ore) with little to no preparation. However, in approximately half of heap leaching operations, the ore is crushed and agglomerated before placing it on the heap — this is done to improve permeability and preserve the high pH needed for leaching to occur. (Bureau of Mines 1986).

Agglomeration requires mixing the crushed ore with lime, portland cement, ash, or other materials. In some cases,  sulfide ores may be treated by bio-oxidation, chlorination, roasting or autoclaving after crushing and before heap leaching.

Two common types of pads used in gold heap leaching include permanent heap structure on a buffer from which the leached ore is not removed and on-off pads, allowing the consumed ore to be pulled out following the leach cycle and fresh ore be placed on the pad. Continual heaps are typically built in lifts, each composed of a 1.5- to a 9-meter layer of ore. On-off pads are not regularly used in the industry and are constructed to admit spent ore to be evacuated after the leaching cycle and reuse of the pad.

Leaching occurs according to the following reactions, with most of the gold dissolving in the second reaction (van Zyl et al. 1988):

Once the leaching process is complete and no further gold can be recovered, the spent ore and residual cyanide solution become wastes. There are several modus operandi to the decommissioning of cyanide-contaminated ore piles and neutralising cyanide solutions. Typically, the waste load is rinsed with water until the cyanide concentration in the effluent is below a specific standard set by the local environmental regulatory agency. Occasionally, analysis of the heap solids is required. The heap may then be recycled with wastes in place.

The heap is an on/off pad; the depleted ore will have been periodically removed to a permanent disposal area. Solution ponds and other areas are also neutralised and closed, sometimes with residue or wastes in place, before reclamation.

2.2 Standards

Accidents at tailings management facilities (TMFs) may lead to accidental water pollution. TMFs store vast amounts of solid waste, which are generated as a by-product when extracting minerals. By its very nature, they can pose severe threats to individuals and the environment, especially in their inaccurate design, handling or management. Accordingly, a failure may result in uncontrolled spills of tailings, dangerous flow slides or the release of hazardous substances, leading to lamentable environmental catastrophes. The devastating effects on human health and the environment of such incidents and their far-reaching and acute transboundary consequences have been demonstrated by major past accidents, such as those listed in Section 3.1.

Many publications have issued guidelines for designing, constructing, and closing safe tailings dams, including ICOLD Bulletins, ANCOLD Guidelines, etc. If the instructions given in these guidelines were to be closely observed, the risk of a failure or unsafe event with a tailings dam and impoundment would be significantly reduced. Unfortunately, the number of dangerous incidents continues at an average of more than once a year.

In most countries, water reservoirs are controlled by legislation, and in some, the legislation applying to these are equally applied to tailings dams. However, there continues to be a need for a more comprehensive implementation of regulations to the non-revenue-generating practice of storing waste tailings to reduce the occurrences of failures and dangerous behaviour.

The International Commission on Large Dams (ICOLD)

The ICOLD Committee on Tailings Dams and Waste Lagoons provides a forum for technical interaction amongst designers and constructors and has spotted the importance of learning from failures and accidents with dams. ICOLD has numerous technical teams that publish bulletins giving guidance to various aspects of dam design, construction and monitoring.

In the past, the body has attempted for tailings dams a similar approach to the one developed for freshwater dams but has encountered averseness amongst the owners of tailings dams to expose incidents or failures unless they came into the public domain through the media or published papers.

Improvements are made by learning the lessons of experience and using them to avoid repeating past mistakes. This Bulletin is intended to help all those connected in any way with tailings storage facilities, including owners, managers, contractors, engineers, personnel responsible for day-to-day construction, and government officials concerned with regulation. In highlighting accidents, the aim is to learn from them, not to condemn them. UNEP commends ICOLD for its thorough work in compiling and analysing this extensive database of accidents, incidents and remedial action.

The ICOLD Tailings Dams Committee has reckoned that a vow can only effectively reduce the cost of risk and failure from owners to the adequate and enforced application of state-of-the-art engineering technology to the design, construction and closure of tailings dams and reservoirs over the entire period of their working life.

As an example, Bulletin 121 can be referred to. The report found that the main reasons for failure could be attributed to a lack of attention to detail. The slow construction of tailings dams can span many staff changes and sometimes changes of ownership. As a result, original design heights are often exceeded, and the properties of the tailings can change. Lack of water balance can lead to “overtopping”: so-called because that is observed but may be due to rising phreatic levels causing local failures that produce crest settlements.

Accordingly, the ICOLD Tailings Dams Committee recommended owners and operators that the design, construction, operation and closure of dams and impoundments with risk potential to downstream shall include the following requirements:

  1. Detailed site investigation by experienced geologists and geotechnical engineers to determine the possible potential for failure, with in situ and laboratory verification to determine the properties of the foundation materials.
  2. Application of state of the art procedures for design.
  3. Expert construction supervision and inspection.
  4. Laboratory testing for “as-built” conditions.
  5. Routine monitoring.
  6. Safety evaluation for experimental conditions including “as-built” geometry, materials and shearing resistance. Observations and effects of piezometric conditions.
  7. Dam break studies.
  8. Contingency plans.
  9. Periodic safety audits.

ANCOLD Guidelines

The Australian National Committee on Large Dams Incorporated (ANCOLD Inc.) is an association of organisations and individual professionals interested in dams in one of the world’s mining superpowers.

Whilst in Australia there is no federal legislation covering the safety of dams, their development and surveillance are controlled by legislation and regulations in Queensland, NSW, Victoria and Tasmania. The other states and territories do not currently have specific dam safety legislation. Regulated items vary but cover safety, environmental, cultural heritage, and other value issues to the community. In most cases, they require compliance with the ANCOLD guidelines.

ANCOLD members have been involved in the drafting and operation of dam legislation and regulations. It encourages and supports the state regulators to meet and identify improvements to achieving consistent dam safety outcomes.

Some of the most prominent guidelines are: Guidelines For Geotechnical Investigations of Dams, Their Foundations And Appurtenant Structures (May 2020); Guidelines for Design of Dams and Appurtenant Structures for Earthquake (July 2019); Regulation and Practice for the Environmental Management of Dams in Australia (June 2014); Guidelines on Design Criteria for Concrete Gravity Dams (September 2013); Guidelines for Dam Instrumentation and Monitoring Systems (1983); Guidelines on Risk Assessment (2003); Guidelines on Dam Safety Management (2003); Guidelines on the Environmental Management of Dams (2001); Guidelines on Selection of Acceptable Flood Capacity for Dams (2000); Guidelines on Strengthening and Raising Concrete Gravity Dams (1992).

UNECE safety guidelines and good practices for tailings management facilities

Since the early 1990s, the United Nations Economic Commission for Europe (UNECE) has committed itself to the anticipation of preparedness for and response to industrial accidents, specifically those with transboundary effects in its region.

These guidelines establish a minimum set of requirements to ensure a basic level of safety for TMFs. In addition, they highlight features to be considered to achieve a satisfactory level of security through applying different policies, measures and methodologies.

Below is an extract of policy, administrative and legal recommendations to the ECE member countries, competent authorities and TMF operators:

Red sludge alumina plant accident Devecser Hungary

Figure 4. “Red sludge” alumina plant accident, Devecser, Hungary. Source: https://commons.wikimedia.org/wiki/File:Ajka_accident_d38e36f0e9_b.jpg

The South African Bureau of Standards code of practice for mine residue deposits

The South African Government appointed the Council for Scientific and Industrial Research (CSIR) to investigate the matter and essentially confirmed the conclusions reached. These investigations highlighted the inherent deficiencies in the operation of this facility and others of its kind. This resulted in a 1995 Draft Code of Practice for the ‘Design, Operation and Closure of Tailings Dams’ in South Africa.

The Code of Practice was intended to address the life cycle of residue deposits, including tailings, regarding their safety, environmental considerations, construction and management. The code contains fundamental objectives, principles and minimum requirements for good practice, all aimed at ensuring that no unavoidable risks, problems or legacies are left to future generations.

Mining personnel were also then more aware of their legal responsibilities when they make appointments. They would make sure that staff have the necessary skills and appropriate experience to perform their functions. Unions started being more active in assisting mining personnel to become trained in different skills. The South African Government promulgated several new laws to ensure that companies train staff sufficiently and incorporate environmental issues in tailings-dam management.

ASTM

Heap leaching is more efficiently accomplished when air is introduced to the ore pile. A new ASTM International standard calls how corrugated polyethene (PE) pipes and fittings can be more effectively used to assist the aeration process.

F2987-Specification for Corrugated Polyethylene Pipe and Fittings for Mine Heap Aeration Applications are intended for deep underground applications such as dump leaching process or heap leach pile aeration pipe under a mine. Corrugated PE pipes and fittings in this setting are subject to harsh chemical exposure from corrosive effluents.

According to specialists, corrugated PE pipe has been used in heap leach applications for more than 30 years. In the last ten, there have been extra efforts to increase the effectiveness of the leachate in extracting the sought-after metal from the ore by adding air into the heap leach pile. This requires some exceptional perforation designs and tight joints. It is detrimental for the leachate to enter these pipes; it is also necessary to protect the gaps from clogging or plugging.

Hence, F2987 sets a quality level that offers some assurance that the pipe manufactured to it will perform as planned by design. Pipe and resin quality, perforation scheme, and placement are critical in the mine heap aeration application.

3 Lessons Learnt from Practical Experiences

3.1 Examples of tailings dam accidents

Kachin State, Myanmar

First, a couple of waste heap failures killed at least 130 people in two different jade mines by the end of 2015. More recently, a waste heap collapsed into a lake after heavy rain, triggering a wave of mud and liquid that buried many workers; at least 126 people were killed.

Mishor Rotem, Israel

A phosphogypsum dam failure caused 100,000 m3 of acidic wastewater to surge through a dry riverbed and left a trail of ecological destruction more than 20 km long.

A collapsed wall of a reservoir holding highly acidic wastewater was seen in Mishor Rotem in Southern Israel on July 4 2017

Figure 5. A collapsed wall of a reservoir holding highly acidic wastewater was seen in Mishor Rotem, in Southern Israel, on July 4, 2017. Source: https://blogs.agu.org/landslideblog/2017/07/07/mishor-rotem-1/

Chihuahua, Mexico

In 2018, a dam failure resulted in about 250,000 m3 of released tailings travelling 29 km downstream, most of which were deposited along the course of a surrounding river. The Federal Attorney’s Office for Environmental Protection said that the tailings don’t contain cyanide or any heavy metals. Three workers were killed, two wounded, and four were reported missing.

Minas Gerais, Brazil

One of the most terrible accidents occurred not long ago in a Vale’s iron mine near Brumadinho. On January 25, 2019, tailings dam No. 1 suddenly failed, releasing almost its complete load of 12 million cubic metres of wastes in a big burst.

The tailings wave devastated the mine’s administrative area, loading station, and two smaller sediment retention basins; it then travelled approx. 7 km downhill, thereby spreading to parts of the local community Vila Ferteco. Two hundred fifty-nine people were killed, and 11 were reported missing.

Free State, South Africa

The 31 -meter high wall of the number four tailings dam of the Harmony Gold mine collapsed. The tailings dam is situated up-slope of Virginia in the Free State Goldfields. At least 2.5 million tonnes of liquefied tailings ripped through the mining village. Eighty houses were swept away, and 200 others were severely damaged. Seventeen people were killed.

3.2 Examples of heap-related mine accidents

San Juan, Argentina

In September 2015, the Veladero mine was hit by a million-litre spill of cyanide solution. Barrick appears to have missed deadlines on several orders from local authorities, including replacing pipes, before subsequent minor spills in 2017.

Colorado, United States

Spills of cyanide and other contaminants from the Summitville gold mine produced severe environmental problems on a 27-kilometre stretch of the Alamosa River. The operation was inaugurated in 1986 and abandoned in 1992.

Montana, United States

The Zortman-Landusky gold mine opened in 1979; it was the first large-scale cyanide heap-leach mine in the U.S. The mine underwent repeated leaks and discharges of cyanide solution throughout its working life, resulting in wildlife mortality and severe contamination of streams and groundwater.

Nevada, United States

Following the failure of a leach room structure in 1997, the Gold Quarry mine near Carlin released almost a thousand cubic meters of cyanide-laden waste into two local creeks. Prior, a series of eight cyanide leaks occurred at McCoy/Cove gold mine, releasing a total of about 400 kilograms of cyanide into the environment.

Spain

In April 1998, a dam at the Los Frailes zinc mine in southern Spain ruptured, discharging an estimated 4.9 billion litres of acid, metal-laden tailings into a significant river and over adjacent farmlands. While news reports of the related massive fish kill did not allude to cyanide or associated compounds, their presence seems likely given the nature of the metals extracted at this site.

3.3 Practical lessons learnt

Development of any heap leaching project

Every operator should finish the exploration program first, ensuring that he has well-characterised mineral resources for the first ten years of operation, considering the range of production rates that he is targeting. In other words, you ought to wait until the geology and mining options are well understood.

Heap leaching cannot be fast-tracked. It takes time to safeguard sufficient orebody knowledge is available, complete the test work, and safeguard land access to do the geotechnical and hydrodynamic characterisation of the project site takes time. But redoing the engineering design every time new information is available will always take longer and will be significantly more expensive.

Do not underestimate the hydrodynamic aspect of the test work program. Inferring the permeability characteristics of the ore is fundamental to designing a safe heap leach operation. Nobody should use results from tests done on fresh ore samples only; instead, it is wise to complete as many experiments as possible using fully leached ore samples and conduct a statistical analysis to establish the operating window. Also, numerical models cannot replace the metallurgical test work program. Models are great tools to simulate process scenarios (for example, changes in operation parameters, different ore blends, changes in external conditions, etc.). However, they cannot substitute test work results in defining process design criteria and inputs for financial evaluation.

Key Geotechnical Concerns of Leach Pads & Heaps

able

Pile tips and natural springs

On occasion, Accident Investigation Boards have attributed disasters to ‘natural unknown springs’ beneath works. For example, ore discard was deposited on hillsides above the miners’ villages in some mining assets. Over the years, waste deposited on top of sandstone — a highly porous rock layer that contains many springs — might become a significant risk. Consequently, heavy rainfall resulted in increased spring discharge and runoff, which partly liquefied. It loosened the discard, resulting in subsidence of a portion on the upper flank of the tailings pile. This phenomenon was followed by the liquefaction of thousands of cubic meters of waste that flowed downhill at high speed, ripping through everything in its path.

Tragic accidents like the one described above have led to regulations that charge quarry owners with securing the safety of solid and liquid tips and provide for design, supervision, inspection, notification, records and the making of tipping rules.

Piping through dam walls

Otherwise, experts have was concluded that the main reason for mismanagement was piping through dam walls. Piping is an erosional process at the interface of course and fine layered material; it is consistent with the jet of water observed shooting out of broken dam walls during the initial stages of a failure event.

The main issue revealed by pipe-related events was that the factors contributing to the formation of pipes should be controlled. These are:

Wall angles and siting

Tailings embankments have also been wrongfully constructed on ridges. The arched surface under these dams causes the water table to mound, resulting in poor drainage and seepage at the sides and the base. In addition, the perimeter walls of the tailings dam can be excessively steep (e.g. more than 35 degrees).

When heavy rain happens, a saturation of the internal tailings occur, and because penstock is not in proper working order, the pool can move away from the penstock to one of the walls of the tailings dam. Thus, the freeboard capacity of the dam is exceeded, and the surface water level overtops the bunds. If breaches develop, they will release several tonnes of liquefied metal tailings.

The primary outcomes are:

Monitoring of tailings dams

Digital satellite image processing is increasingly used to monitor and manage tailings dams. It has proved to be a cheap, easy and effective management tool. Monitoring of tailings dams on the ground now includes an inspection by a competent person with observations recorded in terms of:

Recommendations and suggested actions for stopping tailings dam failures by GRIDArendal. Licensed with CC BY NC SA 2.0

Figure 6. Recommendations and suggested actions for stopping tailings dam failures” by GRIDArendal. Licensed with CC BY-NC-SA 2.0. Source: https://search.creativecommons.org/photos/9cebac06-cfa7-41b4-b78d-2c4574eb16f4

4 Conclusion

This article explored the geological and management causes of heap-leach and tailings-dam disasters and provided guidelines for the future management and monitoring of these facilities.

The seeming lack of application of the lessons learnt from historical events in mining operations becomes apparent when relatively new infrastructure fail similarly. This demonstrates the need to study and learn something from each failure event.

Following some tragedies and stringent environmental and social governance, a fundamental reassessment of the philosophies for the design, management and operation of tailings worldwide was initiated by states and the mining industry. As a result, operators and regulators now view tailing dams and their associated problems far more seriously than in the past and is now required to carry out regular, independent self-audits.

5 References

[1] ICOLD, U. (2001). Tailings dams–risk of dangerous occurrences, lessons learnt from practical experiences (bulletin 121). Commission Internationale des Grands Barrages, Paris, 155.

[2] Kaplinsky, Raphael (2010). The role of standards in global value chains and their impact on economic and social upgrading. World Bank.

[3] https://blogs.agu.org/landslideblog/2017/07/07/mishor-rotem-1/

[4] https://www.wise-uranium.org/mdaf.html

[5] Thiel, R., & Smith, M. E. (2004). State of the practice review of heap leach pad design issues. Geotextiles and Geomembranes, 22(6), 555-568.

[6] Proceedings of the Heap Leach Solutions Conference. September 22−25, 2013, Vancouver, Canada. Editors: Dirk van Zyl, University of British Columbia, Canada Jack Caldwell, Robertson GeoConsultants, Canada.

[7] Marsden, J.O. (2009) Keynote address: Lessons learned from the copper industry applied to gold extraction. In World Gold Conference 2009 (pp. 231−239), The Southern African Institute of Mining and Metallurgy.

[8] Zanbak, C. (2012). Heap leaching technique in mining within the context of best available techniques (BAT). Euromines–The European association of mining industries, metal ores & industrial minerals.

[9] https://sn.astm.org/?q=update/mine-heap-leach-aeration-ma13.html

1 Introduction

As the world moves toward reducing carbon emissions and a greener economy, the demand for natural gas has steadily been increasing.  A significant driver behind this is the environmental benefits of natural gas compared to other fossil fuels motivating governments to develop natural gas facilities instead of other alternative energy generation options. One of the areas of development is the rise of small-scale natural gas solutions, including natural gas, liquified natural gas (LNG), and compressed natural gas (CNG).

This article explores what small-scale LNG (SSLNG) is, what it is typically used for and the technology options available for these applications compared to conventional LNG facilities.

1.1 What is SSLNG?

It is important to understand what is meant by SSLNG solutions and how this is different from conventional processes. Although no strict rules or conditions define what constitutes a small-scale facility, it can broadly be defined as a natural gas value chain (or portion thereof) that processes volumes below 500 000 tons per annum [1]. Compared, conventional facilities are much larger, with throughputs as high as 11 million tons per annum. Typically, vessels transporting LNG for small-scale applications have a capacity below 30 000 m3.

The purpose of a facility can often determine whether small-scale or conventional processes should be used – as some applications lend themselves more to small-scale operations (this is discussed in more detail below [2]). As an example, small scale is often applied for rapid development and small plants for specific end-users. They are typically developed using modular facilities, enabling more flexibility and easy scale-up should the demand for LNG increase as more off-takers use the network.

One concept used to achieve this high flexibility and rapid development is creating a virtual pipeline. The concept is built on a continuous supply of a product similar to what is achieved through a physical pipeline, except containers are used to transport the product via trucks or vessels forming a “pipeline”. This solution offers significant flexibility, and the supply can easily be increased while avoiding the massive capital expenditure of building a pipeline. The transportation of LNG via trucks and vessels and permanent pipelines is expanded in more detail in the Technology Options Section of this article.

Small-scale facilities are often built on the back of conventional facilities. For instance, a conventional large LNG liquefaction plant could supply a portion of the gas to a small-scale regasification and storage facility and its surrounding infrastructure, which would all be small-scale.

1.2 Application of SSLNG

Small-scale applications are frequently used in off-grid and remote locations where other energy sources are also scarce. It is often employed in areas with a low demand, for which conventional sized facilities are not feasible. In some cases, SSLNG is used initially in a project and is then replaced with a more conventional-sized facility as the demand increases.

The gas at SSLNG facilities is mainly used for power generation or fuel supply to marine, trucks, and railroads. This can be either directly as LNG, natural gas, or CNG. Typically for coastal areas, the gas is sourced offshore if no domestic gas is available. In other instances, the gas is supplied via pipelines or trucks to inland countries or countries with neighbouring states with access to gas.

1.3 Drivers, Enablers, and Challenges

This section seeks to explore the key drivers, enablers, and challenges faced by SSLNG.

The main drivers for SSLNG are shorter lead times, reduced costs, and environmental considerations. Often small scale can be developed quicker, and because facilities are smaller, the CAPEX and OPEX are reduced. The smaller facilities also have a much smaller carbon footprint than conventional plants purely due to the smaller volumes processed.

Key enablers of the technology are:

Some of the challenges are listed below:

Several of the challenges currently faced is due to the novelty of SSLNG. Time, experience, and development are set to increase the enablers for small-scale solutions and reduce and mitigate some of the challenges currently faced by the development. [4]

2 Technology Options

To fully understand the various technology options for SSLNG, it is necessary to understand the complete value chain of an LNG system. As with most systems, the various sections are highly dependent on the upstream and downstream operations. Figure 1 provides a visual illustration of the entire value chain. You can read more about the natural gas value chain in these two articles, Natural Gas and LNG.

NATURAL GAS VALUE CHAIN

FIGURE 1: NATURAL GAS VALUE CHAIN

All the technology options available to the different sections in the value chain are highly dependent on the location and environment where the solution is implemented. In this article, marine infrastructure (such as the mooring mechanisms) is not discussed, as this is highly dependent on the offshore conditions in each specific case.

The sections of the value chain considered are:

It is important to note that the storage and regasification steps are combined into one infrastructure called Floating Storage and Regasification Unit (FSRU) for some offshore solutions.  Therefore, the storage and regasification solutions are evaluated in tandem.

TRANSPORTATION GAS STATE

FIGURE 2: TRANSPORTATION GAS STATE

2.1 Transport

The first section is the transportation of natural gas. The natural gas can either be transported onshore (via pipeline or truck) or offshore (pipelines or vessels). It is essential to be aware that the gas can be transported in a gaseous or liquid state. When transportation is by trucks or vessels, the gas is usually transported as a liquid since LNG significantly reduces the storage volume required.

2.2.1 Pipelines

In pipelines, the gas can be transported in a gaseous or liquid state. The decision on how to transport gas via pipeline is usually dependent on the distance involved. Gas pipelines are significantly larger due to the larger volume (compared to a liquid). Therefore, more infrastructure is required, although the pipe itself is less expensive compared to cryogenic pipelines. Cryogenic pipelines are used for LNG and insulate the LNG preventing it from vaporizing in the lines. For small scale, gas pipelines are more feasible than cryogenic lines due to the increased cost and complexity of cryogenics. However, vessels are preferred for long distances as a more economical and lower-risk transportation medium, specifically for SSLNG.

In general, pipelines require a lot of infrastructure and takes a long to develop due to permits and similar approvals that need to be obtained. Physical construction is also time-consuming. In addition, gas pipelines are typically routed underground, requiring additional infrastructure, which is very costly. Pipelines are also not scalable, and if the demand increases and more natural gas is required, the pipeline will need to be replaced.

2.2.2 Trucking

Trucking is often cheaper compared to a pipeline and is preferred for small-scale applications. In addition, it has a short turnaround time making it ideal for rapid small-scale development. Typically, the fleet would be leased, allowing more flexibility to adjust to a change in the gas demand. This makes it ideal for temporary solutions as the lease can be cancelled once it is not required or the demand has increased to validate a pipeline. This is a low-risk option and allows maximum flexibility.

The following types of trucking solutions exist:

The specific type of trucking technology utilized depends on the conditions. Fixed chassis trucks have an LNG capacity between 3000 L to 28 000 L and are suitable to transport the fuel up to a range of 1200 km.

An ISO container is an LNG storage tank that can move through the entire value chain as a storage unit; from the vessel, the container can be loaded onto a flatbed truck to transport it to the end-user and offload the container. This forms a virtual pipeline of supply. The LNG can be stored with minimal losses for up to 80 days in one of these containers; typical volumes are between 20 000 L – 40 000 L. The technology is quite expensive and requires additional infrastructure such as cranes to lift the container onto and from the flatbed.

LNG Semi-trailers are trailers that include an LNG tank and benefit from acting as both storage and transport medium. Larger volumes can also be tracked at a time of up to 58 000 L. This is also more costly than fixed chassis trucks due to the containers being more expensive and a crane required to load the container onto the truck.

Trucking is often the preferred onshore transport mechanism compared to pipelines for small-scale solutions. However, it is highly dependent on the specific conditions of the application and country, as various regulations impact the different solutions.

2.2.3 Vessels

Once the natural gas is liquified to LNG, it is transported via cryogenic pipelines to either a jetty or trestle, where it is loaded onto a vessel through-loading arms.

LNG carriers are ships specifically designed to transport LNG. It is fitted with a containment system to store and carry the LNG to its destination safely. These vessels are equipped with a propulsion system typically fueled by natural gas, although older vessels use steam or other fuels. However, in general, the industry is shifting towards natural gas as these have lower carbon emissions [4].

Should the consideration be to buy an existing carrier, conditions and availability will be the main driving factors between the various vessel container systems. The most critical element is to reduce boil-off gas (BOG), resulting in product loss. The containers are kept under high pressure and low inner temperatures. Two types of storage tanks are used to accomplish this; Membrane and IMO (cryogenic pressure vessels).

For small-scale applications, the vessels vary between 3000 m3 – 30 000 m3. These smaller vessels have a much higher cost per cubic meter of gas than larger vessels. This introduces uncertainty for investors when comparing the cost between small vessels and the larger ones. In addition, the operational costs of these vessels are comparable to carriers closer to 50 000 m3. This further reduces any financial gains that small scale may present. It is often challenging to negotiate fair port costs since the smaller vessel still prevents another vessel from mooring, which results in similar port fees regardless of vessel size. Other factors to consider are the feasibility of mooring these smaller vessels to existing larger jetties and trestles. Sometimes modifications are required to allow a smaller vessel to moor to the structures.

A workaround to these concerns is using a larger carrier at a reduced capacity; however, this introduces the risk of sloshing due to only partially filling the containers. If membrane tanks are used, this is not an issue and can be addressed during the design period of a project.

Emerging technology is the use of Articulated Tug Barges (ATB). An application developed specifically for small-scale applications. The ATBs utilize a tug and are ocean-faring but are limited in how these vessels can effectively transport the LNG. This, however, poses a cost-effective method as these vessels are cheaper than a similar size LNG carrier. These vessels also function as storage and form another virtual pipeline similar to ISO containers.

Already mentioned above is the use of ISO containers for a virtual pipeline. These containers can also be loaded onto a standard shipping barge and offloaded at the end destination before being distributed via trucks. This is a desirable and feasible solution. The main challenges and economic costs to consider are the capital required to acquire sufficient ISO containers as these fulfil multiple roles as transport and storage. Therefore more containers are required to fill the value chain continuously. In addition, you need to appropriate infrastructure at the mooring facilities to offload the containers.  This poses a significant challenge in remote areas and therefore is not always a feasible solution for small-scale applications.

3 Storage and Regasification

The storage and regasification section of the value chain can be installed onshore or offshore. Both scenarios have their advantages and disadvantages. For small-scale applications, offshore is more costly, and due to the higher complexity, onshore solutions are often preferred. Offshore, however, does allow for more extensive flexibility and often faster development, which in most small-scale applications are more critical.

Table 1 lists some of the benefits and disadvantages of offshore vs onshore solutions.

OFFSHORE VS ONSHORE BENEFITS AND DISADVANTAGES

Table 1: Offshore vs Onshore benefits and disadvantages.

An essential factor to consider is infrastructure availability. Due to the current low demand for small-scale LNG, very few existing vessels can be used for offshore regasification and storage. For large-scale LNG, there is an abundance of second-hand vessels that can be purchased and either used as is or retrofitted as an FSRU or Floating Storage Unit (FSU). This is not the case for small-scale, and most solutions require newly built facilities for offshore solutions. This increases the capital costs and lead times before operations can start. The main challenge with small-scale FSRU’s and FSU’s is the limited space to install the necessary infrastructure due to how small the vessels are. Similar to the LNG carriers, the CAPEX and OPEX are quite expensive per cubic meter.

The following technology options are available for small scale applications:

These only list the main categories of technology and various configurations and unconventional solutions developed for small scale. An example of such innovative solutions is the regastainer by AGPGlobal, which offers cost-effective containerized regasification which enables modular installation.

In summary, the challenges faced by small scale LNG solutions are:

Considering the numerous challenges faced. Onshore infrastructure is often the most feasible solution for small-scale LNG. Alternatively, a solution such as ATB’s, which provides higher flexibility, can be considered.

4 Bibliography

[1] PWC, “Small going big: Why small-scale LNG may be the next big wave,” 2017. [Online]. Available: https://www.strategyand.pwc.com/fr/fr/media/small-going-big.pdf.

[2] J. Cocklin, “LNG 101: Defining Small-Scale LNG and its Advantages,” 2020. [Online]. Available: https://www.naturalgasintel.com/lng-101-defining-small-scale-lng-and-its-advantages/.

[3] International Gas Union, “Small Scale LNG,” in World Gas Conference, 2014.

[4] Liquified Natural Gas (LNG) Carriers,” [Online]. Available: https://marine-offshore.bureauveritas.com/ship-classification/lng-carriers.

1 Introduction

1.1 What makes hydrogen ‘green’?

Renewable hydrogen is hydrogen produced by renewable energy, including wind, solar, tidal energy and hydro. When used in fuel cells, renewable hydrogen can produce power while only emitting water. It can be used in several ways, including long-duration storage, which will be necessary, transportation and reducing the carbon footprint of heavy industry by using hydrogen instead of fossil fuels.

Schema for green hydrogen production and utilisation

Figure 1. Schema for green hydrogen production and utilisation. Source: https://www.utilities-me.com/news/15104-shell-and-gasunie-launch-llargest-green-hydrogen-project-in-europe

Hydrogen (H2) is presented as an essential alternative for clean energy and raw material in the modern world. Nevertheless, H2 application as a renewable fuel is the most promising application for the future. Its main advantage is its cleanliness and low greenhouse gas emissions, determined by the hydrogen production pathway. Therefore, the study and understanding of every path are essential for the development and advance of the so-called “hydrogen economy”, mainly focused on green hydrogen.

The level of cleanliness of the energy produced from hydrogen is related to the amount of carbon emissions produced during hydrogen production — an interesting approach for classifying carbon emission during hydrogen production is the use of colour labels. The colour codes of the hydrogen production process might be the statement of sustainability from the suppliers to the consumers.

The most straightforward proposed model for the classification is based on three colours, according to the CO2 emission. Grey H2 is produced through the steam reforming process and uses fossil fuels as raw material. In addition, there is no restriction to carbon emission, and it is considered “dirty” hydrogen. Blue hydrogen also uses fossil fuels but includes some kind of carbon capture, decreasing the CO2 emissions. Some people also believe hydrogen produced using electricity from nuclear power to be blue. Today, it is essential to note that by far, most hydrogen being produced is either grey or blue.

On the other hand, green hydrogen is considered renewable hydrogen due to water as a source of H2 and renewable energy in the electrolytic process (water splitting process), which fits with the zero-emission carbon approach. Furthermore, if the input energy is renewable, the process would be clean; thus, it can lower environmental impact [1].

1.2 A world of opportunities

Roughly 95% of hydrogen is fossil-based. So, is green hydrogen purely theoretical?

Strategies setting us on the path to meet our climate goals of becoming net-zero by 2050 will position renewable hydrogen and associated technologies in the spotlight. We are beginning to see serious investment and new technological development that will make green hydrogen successful beginning now. There are many compelling examples of green hydrogen use around the globe, but we want to highlight too in this introductory section.

The first is in the Orkney Islands in northern Scotland, where tidal and wind energy have been successfully captured and used to make hydrogen, stored, used to supply power on the island, and used in vehicles. Soon, they will begin using that hydrogen to power ferries and heat schools.

Another exciting example comes from Australia, and that is where the government is working to build the Asian renewable energy hub. The goal is to use abundant wind and solar assets in Western Australia to export green hydrogen to parts of Asia, looking for a clean fuel source. This project could see the installation of 26 gigawatts of wind and solar projects and the creation of at least 3,000 jobs. As you learn from this article, investment in this technology is also happening in many other countries, and we certainly believe more is coming.

Global hydrogen production by energy source left and demand by end use right

Figure 2. Global hydrogen production by energy source (left) and demand by end-use (right). Source: Hydrogen strategy for Canada

Figure 2 shows the global production of hydrogen by energy source in 2018. The total global production of hydrogen back then was 144 Mt, in which 67% of production was deliberate, and 33% was produced as a by-product of industrial processes [2]. Most of the hydrogen produced today is made from fossil fuels; 48% of total hydrogen produced worldwide was derived from natural gas, H2 production from coal, primarily due to its popularity as an energy source in China, accounted for 18% of production. Oil and electricity each contributed 0.48%, and the balance was produced as a by-product of another industrial process such as sodium chlorate and chlor-alkali production.

Global demand for hydrogen in 2018 was 115 Mt-H2. Applications utilising pure hydrogen accounted for 60% (69 Mt-H2) of that. Pure hydrogen for oil refining and ammonia production was the most common end-uses, accounting for a combined 60% of total demand. The remainder of pure hydrogen use included transport, metals, electronics, chemicals, and glass-making industries. Demand for mixed hydrogen covered the remaining 46 Mt-H2 of the market with other end-uses such as heat generation from steelworks arising gases and by-product gas from steam crackers. Other uses of mixed hydrogen included the production of methanol and direct reduced iron steel.

2 The Green Hydrogen Value Chain

2.1 Production

Water as feedstock

The world is rich in feedstocks such as solar radiation, water, and biomass. Coupled with a skilled labour force and strategic energy assets, many countries are well-positioned to become top global producers of clean hydrogen. The scale of projected hydrogen demand requires the development of all low-carbon intensity pathways across the world. Each region will have a unique mix based on local resources and economic factors.

The search for clean, renewable and environmentally friendly hydrogen sources has made water an excellent feedstock candidate to produce hydrogen [3]. The production of clean H2 from water occurs by a system known as water splitting. Its simplest form uses an electrical current passing through 2 electrodes to complete the endergonic hydrolysis of water into hydrogen and oxygen. Nonetheless, it is essential to highlight that the Water splitting process can only be considered a good and eco-friendly alternative for green H2 production if the input energy in the electrolyser is being supplied from renewable energy sources; otherwise, this system would not produce a 100% green and clean hydrogen.

Wind

Wind energy is highly essential in energy sources since it is clean, renewable, and inexpensive. Furthermore, it has the potential to provide significant benefits to locations and nations with favourable wind conditions. However, one of the significant challenges for wind power utilisation is wind power plants are usually installed in places far from regions with high electricity consumption, resulting in long-distance transmission and high-power losses. Thus, the exploration of local use of wind power has been considered, and the utilisation of local green hydrogen production using electrolysers would be a great opportunity.

The greatest challenge for wind power utilisation for water electrolysis is that sometimes the wind-to-power conversion is inefficient; thus, the power would not supply the electrolyser’s requirements. Therefore, wind-power farms are usually installed close to the ocean or in other regions with constant and high wind velocities to overcome this challenge.

Sunlight

Solar energy is inexhaustible, clean, and the most abundant energy resource on Earth, providing more energy than global annual energy consumption in one hour (4.3 × 1020 J). Among the strategies to produce green hydrogen from water electrolysis using sunlight, two approaches have received significant attention and will be discussed. The first one is the direct conversion of solar energy to hydrogen in a photoelectrochemical cell. An electrolyser is powered by a photovoltaic cell in the latter, and the systems can operate independently.

The efficiency of the PEC cell depends on the light-harvesting capability of the semiconductor; e.g., the large bandgap of TiO2 (3.2 eV in anatase phase) restrains its application to absorption of UV-light, which corresponds to only 4% of the solar spectrum. In this sense, the modification of the electronic band structure of the semiconductors by doping has been proposed to extend the light absorption to the visible light region. Furthermore, semiconductors with a narrow bandgap, such as WO3, BiVO4, Fe2O3, and CdS, can be used as alternatives to TiO2. Researchers worldwide have worked hard in the past decades to improve efficiency and the costs of the hydrogen produced from a PEC, but this strategy is out of commercial applications.

The PV-electrolysis system can be more competitive than the above devices. In a PV system, the electrolyser’s energy input is supplied by PV devices connected. In a PV-electrolysis system, the solar panels capture solar light and transport the energy, usually via wires, to a separate electrolyser.

PV electrolysis device schematic

Figure 3. PV-electrolysis device schematic. Source: https://www.nature.com/articles/ncomms13237

The greatest challenge faced by the development of these coupled devices is the achievement of high solar-to-hydrogen (STH) efficiencies due to a limitation to solar energy conversion. The improvement of STH efficiencies can be a significant driving force for reducing the H2 generation cost. Thus, some changes and modifications need to be made to the system to make it suitable. Using a multi-junction solar cell with two electrolysers in series, researchers found an effective way to minimise the excessive voltage generated by a multi-junction solar cell, allowing greater utilisation of the high-efficiency PV for water splitting STH efficiency of over 30% [4]. Nonetheless, these prototypes still need to be improved and adapted to reduce the cost of H2 and make the use of electrolysers commercially suitable.

2.2 Distribution and storage

There are many innovative ways to distribute and store hydrogen. For example, Canada’s extensive natural gas pipeline network, in conjunction with additional storage and distribution infrastructure, may be used to transport the hydrogen from production to end-use locations. However, to ensure we are ready to take full profit of the many benefits of hydrogen, processes must be put in place to facilitate uptake of new technologies, hasten pipeline blending, and increase the number of refuelling stations all over the map.

Many gas companies are looking into using natural gas infrastructure to store and transport green hydrogen; some companies are also considered blending green hydrogen into the natural gas system to avoid supply constraints and clean up the system.

We can mention the example of Enbridge Gas, a firm that is supporting Ontario’s energy transition by investing in clean opportunities across multiple markets. This includes H2 and renewable natural gas produced from organic waste, which can green the supply by curtailing traditional or geological natural gas and reducing greenhouse gas emissions. These projects have the additional benefit of being local clean-energy solutions that use existing pipeline infrastructure.

Such a low carbon hydrogen-blending project is the first of its kind in North America. It is an essential step in greening the gas supply that millions of Ontario homeowners and businesses depend on to heat their homes and energise industry. In addition, the successful implementation will support Enbridge Gas in pursuing additional and larger scale H2 blending activities in other parts of its distribution system.

Introducing renewable H2 into the power to gas process

Figure 4. Introducing renewable H2 into the power-to-gas process. Source: Groundbreaking $5.2M hydrogen blending project aims to green Ontario’s natural gas grid

In October 2020, the Ontario Energy Board approved an application by the company to enhance the Markham Power-to-Gas facility to pilot the blending of renewable H2 gas into the existing natural gas network, reducing carbon emissions. This pilot project will initially provide a maximum hydrogen blended content of up to two per cent of the natural gas supplied to approximately 3,600 customers in Q3-2021, abating up to 117 tons of CO2 equivalent from the atmosphere. The project has alledged not to impact customer bills.

2.3 Transportation

The transportation sector contributes a staggering 20 per cent of carbon emissions globally. Increased spendings on infrastructure will incentivise the adoption of zero-emission vehicles, including coordinated hydrogen refuelling infrastructure efforts focused on regional hubs. High profile, medium- and heavy-duty fuel cell EV pilot projects will help raise awareness and best practices for prototype deployments for goods and people moving in all sectors: on-road, rail, marine, and aviation.

Hydrogen is accelerating e-mobility into the future. Most fuel cell engine suites are designed as flexible power building blocks for transportation and stationary power products. Light duty applications are zero-emissions solutions for warehouse equipment manufacturers producing products like AGVs, small robotics, and aerospace UAVs, mid-range vehicles consist of delivery vans or light/medium duty cargo trucks used for on-road middle-mile delivery, heavy-duty applications comprise on-road trucking fleets for high utilisation last-mile delivery or long-haul trucking.

For example, ground support equipment is used in port fleets around the world – this includes deck loaders, airport baggage tractor tuggers, and belt loaders. Fuel cell-powered electric ground support equipment is today’s zero-emission answer to several issues with traditional diesel power. Case in point to longer-range, zero-emission fleets are a reality today. Fuel cell-powered fleet vehicles can achieve greater payload, higher range, and faster refuelling, all for a lower cost of ownership when compared to their battery counterparts. Also, drivers cite a smoother ride and quieter, cleaner experience over traditional vehicles.

2.4 Feedstocks for industry

Hydrogen can be used as feedstock in many industrial processes. For example, it can be used for decarbonising steel manufacturing and is an essential component for oil sands upgrading. Governments need to develop policies that will ensure long-term certainty to encourage private sector investments and innovation.

Steel is responsible for eight per cent of global carbon dioxide emissions annually, making it one of the biggest carbon emitters, and accounts for approximately 30 % of the global industrial CO2 emissions. In Europe, the steel industry aims at a CO2 reduction of 80–95% by 2050 [5], and so in February 2021, a new European H2 Green Steel industrial initiative was launched. It will produce 5M tons of high-quality CO2-free steel, mobilise 2.5B€ investments and create 10,000 jobs. The initiative has the scale, ambition, and innovative business model to become a flagship of the continent’s position at the forefront of the transformation of energy-intensive industries. This case is critical to delivering on Europe’s climate neutrality pledges.

Direct reduction processes and an electric arc furnace provide the basis for CO2 reduction in the steel industry. In using natural gas as a reducing agent, approximately one-third of the CO2 emissions can be saved compared to the conventional blast furnace/basic oxygen furnace route. But an alternative pathway to achieve a further reduction of CO2 emissions is the utilisation of renewable hydrogen as the energy source and reducing agent for the production of direct reduced iron.

As the reforming gases in the direct reduction process already comprise 55 % hydrogen, natural gas can be partly replaced by hydrogen and achieve a further reduction in carbon dioxide emissions. Ripke and Kopfle [6] stated that no changes are required for the existing processing plants up to a substitution rate of about one-third of the required natural gas. Using H2 as a reducing agent enables achieving higher reduction degrees from iron ore. Nevertheless, the reduction process is thermally unfavourable due to the endothermic nature of the reaction between hydrogen and iron oxide.

3 Hydrogen Opportunities

Developing an at-scale renewable hydrogen economy is a strategic priority for Canada, Germany, the U.S., and Chile. This is needed to diversify their future energy mix, generate economic benefits and achieve net-zero greenhouse gas emissions by 2050 (or before). This will require a radical transformation of the current energy system.

The world has all the ingredients necessary to develop a competitive and sustainable hydrogen economy. The research and consultations that led to advanced economies’ “hydrogen strategies” highlight how we can get there. In most research and consultations, the following cross-cutting themes emerged [7].

3.1 Momentum

Attentiveness in the global energy transformation is proliferating, with projections indicating at least a tenfold increase in hydrogen demand in the coming decades. Since 2010, global demand for this fuel has grown by a moderate 28%. However, studies indicate that hydrogen, backed by the right incentives, investments, and policies, could provide between 18-24% of global energy demand by 2050, with some regions and countries being much higher.

Governments around the world are releasing and executing hydrogen strategies that are building global momentum. In 2020, the Netherlands, Norway, France, Germany, Spain, and the European Union as a unit seized this momentum by developing hydrogen strategies that eye up to a 200-fold increase in electrolyser capacity by 2030 [8]. In 2019, Canada launched a new Hydrogen Initiative under the Clean Energy Ministerial, designed to be the cornerstone for global hydrogen deployment. In addition, Chile launched its national strategy in November 2020 [9], pursuing the world’s cheapest green hydrogen in 10 years. Its strategy sets a mark of 25 GW by 2030 with an outstanding hydrogen production cost of less than $1.50/kg.

Back in 2017, Japan became one of the first countries to implement a basic hydrogen strategy, and it has since set out detailed plans to become a “hydrogen society” [10]. The strategy notably seeks to attain cost parity with competing fuels for power generation, such as liquefied natural gas. It has also outlined concrete cost and efficiency targets per application, targeting electrolyser costs of $475/kW, an efficiency of 70%, and a production cost of $3.30/kg by 2030. It also has multiple deals underway for international trade in H2. The Hydrogen Energy Supply Chain, for example, is entrusted to delivering hydrogen converted from coal gasification from Australia. The first liquid hydrogen ship was delivered by the end of 2019, and the first blue ammonia shipment arrived in Q3 2020.

Map with some leading hydrogen countries e1629633849571

Figure 6. H2Future green hydrogen plant in Austria. Source: World’s largest “green” hydrogen pilot begins operation in Austria

The attraction to hydrogen is growing throughout the world. However, states need to act now to ensure we are not left behind. The time to act is now: the need to counteract climate change is driving a major restructuring of the world’s energy infrastructure. The development of an at-scale, renewable hydrogen economy is a strategic priority for many countries because they need to diversify their future energy mix, generate economic benefits and achieve net-zero emissions by 2050.

3.2 Signature projects

Chile

The South American nation is identified amongst the key strategical countries for H2 production [11] thanks to low-cost solar electricity. The Atacama Desert of Chile presents one of the highest global horizontal irradiation values globally, equal to more than 2 kWh/m2 with capacity factors beyond 30% for PV, which has experienced dramatic growth in its installed capacity the last years. The Atacama desert is also extremely promising for CSP plants, which can reach capacity factors beyond with estimated Levelised Cost of Electricity “LCOE” of 55 US$/MWh at utility-scale. Such extremely low-cost electricity can be competitively implemented for solar-driven electrolysis as an opportunity to increase the penetration of the abundant, economic and sustainable solar energy in the national energy matrix through solar fuels e particularly solar-hydrogen e both as domestic energy vector and for bulk exportation to other countries.

In the Chilean National Green Hydrogen Strategy, which was launched in 2020, solar energy is acknowledged as innovative technology. Business opportunities have been identified for the Atacama and Antofagasta regions in the North of Chile. But there is also important action in the windy south; Enel Green Power Chile, part of the Italian multinational energy giant, is leading a project to install a pilot renewable hydrogen production plant using an electrolyser powered by wind energy Punta Arenas, in the southernmost Magallanes Region.

Scotland

Islands are ideal polygons and showcases for the demonstration of individual hydrogen technologies and the entire mini hydrogen, that is, “hydricity” economies. There are already several ongoing or proposed demonstrations of the integrated hydrogen systems on islands worldwide [12]. They vary in size from kW to MW and in scope from a refuelling station to a complete autonomous island energy supply.

The PURE (Promoting Unst Renewable Energy) project is situated on the island of Unst in the Shetland Islands in the most northern part of Scotland. The area has some of the best wind and wave energy sources in Europe. The system consists of two 6 kW wind turbines that provide electric power to heat five business units directly. Excess electricity from the wind turbines is used to produce hydrogen, which can then be stored and is also used to fuel a fuel cell/battery hybrid vehicle and for a backup power unit consisting of a 5 kW fuel cell and an inverter.

Austria

The world’s largest green-hydrogen plant became operational near Linz in November 2019. The cutting-edge facility has a 6 MW capacity and generates hydrogen through electrolysis powered by renewable power. Located at a site owned by steel manufacturer Voestalpine, the carbon-neutral plant is a testing ground for scaling up hydrogen operations to an industrial level, potentially decarbonising “hard-to-abate” industries like steel, cement and chemicals production [13].

Globally, steel accounts for between 7-9% of all direct emissions from fossil fuels. Mitsubishi Heavy Industries is working with Voestalpine to develop a steel production process using hydrogen, potentially replacing the fossil fuels that currently power steelmaking.

H2Future green hydrogen plant in Austria

Figure 6. H2Future green hydrogen plant in Austria. Source: World’s largest “green” hydrogen pilot begins operation in Austria

Spain

Wind power installed in Spain at the end of 2020 reached 27,370 MW, making it the first power generation technology, with an electricity demand coverage of around 28% [14].

In Spain, two categories of mini-grid systems could be developed. One is related to the peninsula area, where very few electrically isolated areas exist. Still, where they do, energy supplies are usually provided by diesel generators or very small hybrid renewable installations (wind/photovoltaic) with batteries for storage. Islands are the other application for which hydrogen mini-grids are appropriate; an example is the RES2H2 project situated in the Canary Islands. The RES2H2 project implemented a wind–hydrogen prototype system, financed by the Fifth Framework Programme of the European Commission; the system was put into operation in 2007.

The prototype installed in Spain was designed to satisfy a theoretically isolated village’s electricity and water needs (mini-grid type). When the electricity supply exceeded the theoretical demand, a 100 kW alkaline electrolyser used excess electricity to produce 0.99 kg of hydrogen per hour at 25 bar (5500 Nm3 of storage), and a reverse osmosis plant (40 kWe of nominal power) also used this excess electricity to produce a maximum of 110 m3 per day of desalinated water. When power from the wind turbine did not cover the demand, the stored hydrogen was used in six 5 kW PEM fuel cells to produce electricity.

Wind + solar + storage

A small pilot-scale system was developed and installed at Matiu/Somes Island in Wellington Harbor to evaluate the real-world potential for hydrogen energy storage. This “remote” island is powered by a hybrid renewable energy system, including wind and solar PV generation, backed up by a diesel genset. In addition, an electrolyser based hydrogen storage system has been installed to evaluate the technology readiness level and commercial potential for this type of technology. The hydrogen gas is currently used to substitute for LPG in cooking applications and will also be used in the future for instant water heating.

The UNIDO-ICHETs Bozcaada Wind-Solar Hydrogen project, on a Turkish Bozca Island, aims to study how hydrogen and renewable energies can be integrated into stand-alone applications for the powering of island communities. This experimental power plant supplied by AccaGen produces electricity thanks to a 20 kW solar photovoltaic array and a 30 kW set of wind turbines and stores an equivalent amount of energy as hydrogen via a 50 kW electrolyser. Then, at times of grid failure or peak demand, the stored hydrogen can be converted back into electricity using a 35 kW hydrogen engine and a 20 kW fuel cell, allowing uninterrupted electricity supply to the equivalent of twenty households for up to 24 h.

4 Promising Technologies

4.1 General applications

Nowadays, one of the most important applications of hydrogen is in the petrochemical industry, including hydrocracking (hydrogenation to produce refined fuels with smaller molecules and higher H/C ratios) and hydroprocessing (hydrogenation of sulfur and nitrogen compounds to further remove them as H2S and NH3) for the purification of petroleum and fuels.

Besides, hydrogen is essential in the base industry primarily through the synthesis of ammonia from the direct reaction with N2 at high temperatures and pressure in the well-known Haber-Bosch Process. It is worth mentioning that ammonia is fundamental for fertilisers production and the improvement of agricultural performance. Hydrogenation can also be applied to decrease unsaturation in fats and oils and some fine chemical synthesis.

Hydrogen has been used in the electronics industry as a protective and carrier gas, in deposition processes, for cleaning, and in etching and reduction processes. Another example is its use in the metallurgic industry in the reduction stages and in the direct reduction of iron ore, which involves separating oxygen from the iron ore using hydrogen and synthesis gas (syngas).

A strategic application of the H2 is to consider it as a fuel, being applicable for direct combustion, by itself or in some blends with natural gas. Also, Fuel Cells (FCs), where it can provide reliable and efficient energy power, can be used in stationary power stations and as a good candidate for vehicles.

Although presenting great potential for several applications, according to a sense from 2018 [15], 51.70% of total H2 worldwide is used for refining, 42.62% is used for ammonia production, and only 5.68% is used for other applications, including its use as a clean and renewable fuel.

4.2 Leveraging low-cost renewables and other low-carbon tech

There exist different low-carbon hydrogen production methods. However, low-carbon and low-cost hydrogen developments are still limited. Low-carbon H2 includes hydrogen from renewable electricity, blue hydrogen and aqua hydrogen (hydrogen from fossil fuels via the new technology). Green H2 is an expensive strategy compared to fossil-based hydrogen. Blue hydrogen has some attractive features, but the carbon capture use and storage (CCUS) technology is high cost, and blue H2 is not inherently carbon-free. As a result, engineering experts have focused on creating additional low-cost, low-carbon hydrogen technologies.

In Western Canada, a novel, cost-effective technique for extracting hydrogen from oil sands (natural bitumen) and oil fields has been developed and marketed. Aqua hydrogen is term specialists have coined for the production of hydrogen from this new technology. Aqua is a colour that is halfway between green and blue. It depicts a type of hydrogen production that does not generate CO2, like green hydrogen but is created using fossil fuel energy, like blue hydrogen. Unlike CCUS, which is compensatory concerning carbon emissions as it captures, uses and stores produced CO2, the advanced method is transformative in that it does not emit CO2 in the first place. To promote the development of the low-carbon hydrogen economy, the current challenges, future directions and policy recommendations of low-carbon hydrogen production methods, including green hydrogen, blue hydrogen, and aqua hydrogen, are investigated in the paper.

Plug Power is one of the world’s leading providers of clean hydrogen and zero-emission fuel cell solutions. Their first green hydrogen plant will be located in Pennsylvania, U.S — they are working with partners at Brookfield on that which will be their hydro plant. This will be their first 10 ton/day 100 per cent green hydrogen plant; it is expected to be up and running producing hydrogen fuel by the end of 2022.

The firm is also finalising the location of a power purchase agreement powered by wind assets. It consists of a large wind farm in Texas which is the source of electricity to produce 30 tons/day of green H2. But what’s exciting here apart from just also being the green hydrogen is that Plug Power has been able to source the correct cost of 24/7 renewable electricity, which allows them actually to produce this hydrogen at cost parity and sell it at a similar price to grey hydrogen while still maintaining the margin and getting the return on these assets as we are making those investments [16].

5 Why Green Hydrogen Now?

Over the last years, clean energy enthusiasts have been engaging with stakeholder groups to develop a strategy that will set them on the path to meet their climate goals of becoming net-zero by 2050. This will position some states and companies as world-leading producers, users and exporters of renewable hydrogen and associated technologies.

Blending low-carbon intensity hydrogen into existing natural gas networks for use in both industry and the built environment — i.e. heat and power — provides the most significant demand opportunity for hydrogen. In addition, there is an opportunity in identifying synergies between hydrogen and other bio-based renewable fuels, along with creating a market for low-carbon products being used in domestic infrastructure. Amongst the plethora of possible international trading routes, those which link coastal strategic H2 producers such as Chile (Atacama Region), Argentina (Patagonia Region), Australia, North Africa (Morocco, Algeria), Middle East (Saudi Arabia, Iran) and coastal strategic H2 importers such as Japan, USA (California), Northern Europe and Korea stand out.

In addition to the political momentum behind green hydrogen, there is a financial incentive: according to an article in Forbes [17], there are more than U$S 90 billion of hydrogen projects under development today — although not all of them are green — and significant demand is already materialising. Moreover, renewable hydrogen can solve many problems as we work towards a 100% emission-free power system.

To begin with, there is an increasing amount of intermittent renewable energy assets that are added onto the grids, and we all know that wind doesn’t always flow, the sun doesn’t always shine, sometimes power is too low, sometimes it is too much, and the power demand is now being decoupled with the generation. H2, mainly when produced using renewable energy that would otherwise have been curtailed, are both capable of long-term storage and rapid ramping, meaning it can precisely match the dispatchable resources that the grid will need.

The renewable sector needs sustained support for innovation across the value chain to ensure (energetically) transitioning economies maintain their competitive edge. Activities can be coordinated across regional research centres that boost specific expertise and fundamental collaborations between public and private-sector researchers domestically and internationally.

6 References

[1] Dawood, F.; Anda, M.; Shafiullah, G. M. ; International Journal of Hydrogen Energy 2020, 45, 3847.

[2] https://www.capenergies.fr/wp-content/uploads/2019/07/the_future_of_hydrogen.pdf

[3] Germscheidt, R. L., Moreira, D. E., Yoshimura, R. G., Gasbarro, N. P., Datti, E., dos Santos, P. L., & Bonacin, J. A. Hydrogen Environmental Benefits Depend on the Way of Production: An Overview of the Main Processes Production and Challenges by 2050. Advanced Energy and Sustainability Research, 2100093.

[4] Jia, J., Seitz, L. C., Benck, J. D., Huo, Y., Chen, Y., Ng, J. W. D., … & Jaramillo, T. F. (2016). Solar water splitting by photovoltaic-electrolysis with a solar-to-hydrogen efficiency over 30%. Nature communications, 7(1), 1-6.

[5] New H2 Green Steel industrial initiative will produce 5M tons of high-quality CO2-free steel, mobilise 2.5B€ investments and create 10,000 jobs

[6] http://www.midrex.com/wp-content/uploads/Midrex_2017_DFM3QTR_FinalPrint.pdf

[7] https://www.nrcan.gc.ca/climate-change/hydrogen-opportunities-key-findings/23104

[8] https://ec.europa.eu/energy/sites/ener/files/hydrogen_strategy.pdf

[9] https://energia.gob.cl/sites/default/files/national_green_hydrogen_strategy_-_chile.pdf

[10] https://www.meti.go.jp/english/press/2017/1226_003.html

[11] Gallardo, F. I., Monforti Ferrario, A., Lamagna, M., Bocci, E., Astiaso Garcia, D., & Baeza-Jeria, T. E. (2020). A Techno-Economic Analysis of solar hydrogen production by electrolysis in the north of Chile and the case of exportation from Atacama Desert to Japan. International Journal of Hydrogen Energy. doi:10.1016/j.ijhydene.2020.07.050

[12] Barbir, F. (2016). Hydrogen Islands–Utilisation of Renewable Energy for an Autonomous Power Supply. Hydrogen Science and Engineering: Materials, Processes, Systems and Technology, 1075-1096

[13] https://www.powerengineeringint.com/emissions-environment/worlds-largest-green-hydrogen-pilot-begins-operation-in-austria/

[14] https://www.evwind.es/2021/03/29/wind-power-has-reached-its-highest-electricity-production-in-the-last-15-years-in-spain/80095

[15] Hydrogen – Fuels & Technologies https://www.iea.org/fuels-and-technologies/hydrogen (accessed Jun 15, 2021).

[16] 2020 December Member Webinar: The Future of Green Hydrogen

[17] https://www.forbes.com/sites/arielcohen/2020/10/19/the-green-hydrogen-revolution-is-now-underway/?sh=66fa2b80232c

1 Overview of the Article

This article aim is to present a general overview of petroleum products storage tanks. Only cylindrical vertical tanks are covered in this article.

Though storage tanks are used to store varieties of liquid including water, crude oil, refined petroleum products, the scope of this article is limited to liquid hydrocarbon storage tanks with emphasis on refined products such as Premium Motor Spirit (PMS), Automotive Gas oil (AGO), and Dual Purpose Kerosene (DPK). Tanks used to store Liquefied Natural Gas (LNG) are not covered in this article.

The storage tanks covered in this article are above ground atmospheric tanks.

The guidelines and recommendations discussed in this article are referenced to Author’s experience, the National Fire Protection Association (NFPA 30), American Petroleum Institute (API 650), EN 14015

2 Introduction

Refined petroleum products are some of the most vital energy sources used to power cars, motorcycles, electricity generators, pumps drivers, and other equipment. The fuel is usually stored in a compartment/reservoir from where it is drawn into the equipment. This compartment is generally referred to as a storage tank.

The storage tanks described above is not the focus of this article. Storage tanks in oil and gas facilities refer to large volume reservoir, mainly cylindrical but could be rectangular or any other shape. These tanks are mostly made of steel materials. However, the tanks may be horizontal or vertical for large volume storage tanks.

Storage tanks are an essential component of any oil and gas facility. They are found in Crude oil storage facilities, Refineries, refined products storage depots.

Dome Roof Storage Tanks

Figure 1: Dome Roof Storage Tanks

2.1 General Terminologies Related to Tanks

Below are some key terminologies that relate to petroleum products storage tanks.

2.1.1 Above Ground Storage Tanks

Above ground storage tanks are defined in NFPA 30, section 3.3.51.1, as tanks installed above grade, at grade, or below grade without backfill. This means any tank installed below grade elevation that is not backfilled is considered an above-ground storage tank.

2.1.2 Atmospheric Tanks

As defined in section 3.3.51.2* of NFPA 30, Atmospheric Tank is a storage tank that has been designed to operate at a pressure ranging from atmospheric through a gauge pressure of 1.0 psi (6.9 kPa) (i.e., 760 mmHg through 812 mm Hg) measured at the top of the tank. Note that Atmospheric tanks are not Low-Pressure storage tanks. As defined in section  3.3.51.3 of NFPA 30, a low-pressure storage tank is a storage tank designed to withstand an internal pressure above a gauge pressure of 1.0 psi (6.9 kPa) but not more than a gauge pressure 15 psi (103 kPa) measured at the top of the tank.

2.1.3 Storage Tank

As defined in section 3.3.51.6 of NFPA 30; A storage tank is a vessel having a liquid capacity that exceeds 60 gallons (230 L), is intended for fixed installation, and is not used for processing.

2.1.4 Vapour Pressure of a Liquid

As defined in NFPA 30 section 4.2.6, Vapor pressure is the pressure measured in pounds per square inch, absolute (psia), exerted by a liquid, as determined by ASTM D 323

3 Components of Storage A Tanks

A storage tank is an assemblage of various components and parts. Below is a short description of the components

3.1 Tank Foundation

The tank foundation is the load-carrying member external of the tank. The tank seats on the foundation.

Tank foundation should be designed with the tank bottom elevated minimum of 300mm above the surrounding grade.

Note that a Release Prevention Barrier such as synthetic materials, steel bottoms, clay liners, a combination of different barriers may be installed under the tank foundation.

The barriers functions include

Installation of Tank HDPE Liner

Figure 2: Installation of Tank HDPE Liner

The most prominent types of tank foundations are:

3.1.1 Earth Foundation without Ring Wall

This type of foundation is applicable primarily for small diameter storage tanks. Used when the soil load-bearing capacity and settlement is adequate. Soil compacting is very crucial in this type of foundation to minimise settlement.

The foundation material may consist of compacted crushed stones, screenings, fine gravel, clean sand, or other materials placed directly on virgin soil.

3.1.2 Earth foundations with Crushed Stone and Gravel Ringwall

This type of foundation is also referred to as Gravel Packed Foundation because gravel is used instead of concrete ring wall.

This a prevalent type of foundation used for medium and large diameter storage tanks. The gravel pack ringwall carries the load resulting from the shell plates and the self-supporting roof.

The foundation should be well compacted to minimise settlement resulting from the tank’s weight and contents.

May install Asphalt/Bitumen on top of the compacted foundation and gravel pack to provide a compressive membrane between the foundation and the tank bottom plates.

Some of the advantages of this foundation include

walking

3.1.3 Earth Foundation with Concrete Ringwall

This type of foundation is very prominent, usually applicable for medium to large diameter tanks. This foundation is used when substantial loads resulting from heavy plate thickness, tall shell and self-supporting roofs is transferred to the soil. The resulting load is transferred to the ring foundation under the shell.

Appropriate steel reinforcement is embedded into the ringwall to provide the required strength.

The ringwall thickness is usually a minimum of 300mm, and the depth depends on the condition of the soil.

The soil surrounded by the concrete ringwall must be appropriately compacted to minimise settlement. Also, may install Asphalt/Bitumen on top of the compacted foundation and ringwall to provide a compressive membrane between the foundation and the tank bottom plates.

The advantages of this type of foundation include:

Tank Concrete Ring Foundation

Figure 3: Tank Concrete Ring Foundation

3.2 Tank Floor

The tank floor may be a combination of bottom plates and annular plates. There are different types of floor arrangement.

3.2.1 Tank Floor Arrangement

There are two types of floor arrangement described below. However, some tanks have flat floor arrangement.

3.2.1.1 Cone Down Floor Arrangement

This type of floor arrangement is applicable mainly for cone roof and other fixed roof tanks. In this type of arrangement, the centre of the tank is the lowest point. A drain pit is installed at the centre to collect all accumulated water in the tank bottom.

3.2.1.2 Cone Up Floor Arrangement

Generally, this type of design is applicable for floating roofs tanks. 3 to 4 collector or drain pits are installed close to the tank shell plate. Each of these drain pits is provided with a water draw-off line.

3.2.2 Tank Floor Plates

The floor plates of a storage tank could be a combination of the bottom plate and annular plates.

3.3.2.1 Bottom Plates

The bottom plate of a storage tank seats inside the shell plate. It is welded to the annular ring plates. The shell plate shall extend from underneath the tank shell outward for a tank that does not have annular ring plates. As stated in section 5.4.1 of API 650, the minimum bottom plate thickness shall be 6mm exclusive of any corrosion thickness specified by the purchaser. Refer to API 650 or other codes for dimensions and plate overlap requirements for tank bottom plates.

Tank Bottom Plates

Figure 4: Tank Bottom Plates

3.2.2.2 Annular Plates

The annular plate is a ring of plates that sit directly underneath the shell plates of a tank. They are usually thicker than the bottom plate because they carry the shell and/or self-supported roof weight.

As specified in section 5.5.2 of API 650, Annular bottom plates shall have a radial width that provides at least 600 mm (24 in.) between the inside of the shell and any lap-welded joint in the remainder of the bottom. Also, the minimum annular plate outward projection specified in section 5.4.2 of API 650 is 50mm.

Installation of Tank Annular Plate

Figure 5: Installation of Tank Annular Plate

3.3 Shell

The shell is the vertical product containing part of the tank welded to the floor plates. The shell is made of steel plates manufactured as per applicable specification, including ASTM CSA, ISO etc. The shell is made of rolled plates that are welded together to form the cylindrical shape of the tank. The cylindrical shape is formed on top of the previous plate until the tank height is achieved. Each plate height is called the tank course, i.e. the first plate welded to the bottom plate is called the first course or course one while the next is the second course or course two etc.

API 650 has specified a minimum 1800m nominal plate width unless otherwise agreed by the purchaser. A plate width of 1800m represents a course height of 1800mm.

For details of Shell thickness design and calculation, refer to:

API 650 Section 5.6.3 (1-Foot Method)   tank diameter up to 60m.

API 650 Section 5.6.4 (Variable-Design-Point Method) for tank diameter exceeding 60m.

Typical Shell Plate Arrangement Drawing

Figure 6: Typical Shell Plate Arrangement Drawing

Tank Shell Erection on Annular Plate

Figure 7: Tank Shell Erection on Annular Plate

3.4 Inlet Nozzle

The product is introduced into the storage tank via the inlet nozzle. Small diameter tanks may have their inlet nozzle located on the tank top course, while a large diameter tank with large inlet pipes has its inlet nozzle located at the bottom (First course).

In setting the nozzle elevation for floating roof storage tanks, the minimum roof elevation should be considered to ensure appropriate clearance from the nozzle.

In some tanks, the inlet nozzle is utilised as the discharge nozzle.

3.5 Discharge Nozzle

Products are drawn out of the tank via the discharge nozzle. As previously stated, one nozzle may be utilised as suction and discharge. Also, Nozzle elevation for floating roof tanks should be such that the roof at its lowest elevation does not obstruct the nozzle.

3.6 Tank Roof

All tanks have a roof that shields the stored product from the surrounding. The roof also limits the emission of vapour into the atmosphere. The selection of the roof type is based on various factors such as

Below is a brief description of the types of roofs.

3.6.1 Fixed Roofs

These are the tanks with covered roofs. The shape of the roof could be flat, umbrella, conical or dome. Fixed roof is used when the stored product True Vapour Pressure (TVP) is lesser than or equal to 1.5 Psia

3.6.1.1 Cone Roof Tanks

The shape of the roof is conical made of steel plates. These tanks are used to store liquids that do not rapidly vaporise. The roof is supported on structural members such as beams and rafter evenly distributed around the tank.

3.6.1.2 Dome Roofs

This type of roof is made of aluminium materials. They are self-supporting on aluminium structural members that are assembled to form the dome shape. They are generally referred to as Aluminium geodesic dome roof tanks. These tanks are becoming very prominent in the storage of premium motor spirit and Dual Purpose Kerosene, especially when the tank is designed to have an internal floating roof.

3.6.2 Floating Roof

These tanks are used to store very volatile liquid, and they are used when the Product True Vapour Pressure measured at ambient temperature is greater than 1.5Psia but lesser than or equal to 11.5Psia.

The tank roof floats on top of the stored products. The floating roof design must consider the buoyancy of the roof based on the stored liquid density.

The roofs usually have evenly distributed support legs. The tank floor where the support lands during maintenance should have a striker plate. The striker plates ensure that the roof support does not damage the bottom plate.

Usually, the roof supports should not touch the tank’s floor during regular operation except during maintenance.

Below are the types of floating roofs

3.6.2.1 Single Deck Floating Roof

Single deck roof is also referred to as pontoon roof. The Pontoon provide the required buoyancy for the roof. The deck of the roof should be designed to be in contact with the liquid.

A Manhole, Vents and other instruments should be provided on the roof.

A seal is installed between the tank shell and the Pontoon.

Single Deck Floating Roof

Figure 8: Single Deck Floating Roof

3.6.2.2 Double Deck Floating Roof

A double-deck floating roof consists of lower and upper membrane separated by bulkheads.

Radial bulkheads further subdivide the bulkheads. The subdivision ensures that if one of the bulkheads is punctured, the entire roof does not collapse. The double-deck roofs are more rigid compared to a single deck. The separation space between the upper deck and bottom deck plates serves as an insulation that reduces the heat reaching the stored product during hot weather.

Manhole, Vents and other instruments should be provided on the roof.

A seal is installed between the tank shell and the Pontoon.

Double Deck Floating Roof

Figure 9: Double-Deck Floating Roof

3.6.2.3 Internal Floating Roof

These types of tanks have the floating roof installed inside a fixed roof tank. Internal floating roofs are mostly single deck type floating roof. The tank diameter is usually smaller than external floating roofs. They are mainly used when the tank diameter is lesser than 40m.

The internal roof may be made of aluminium material or steel; however, the design must consider the floating of the roof on the stored liquid.

3.6.2.4 External Floating

This type of floating roof is used mainly in medium to large diameter tanks. They are widely used in crude oil storage tanks because of their large diameters. Usually applicable for tanks with a diameter greater than 40m.

3.7 Tank Vents (PV Vents)

Storage tanks may fail due to excessive internal pressure arising from vapour build-up or filling the tank. Vacuum is created in the tank during the withdrawal of products from the tank.

A vent is installed on top of the tank to prevent failure resulting from pressure build-up and vacuum. One such standard vent installed is the PV Vent (Pressure/Vacuum Vent or pressure vacuum relief valve). It is an automatic safety device that allows air to be drawn into the tank during product withdrawal and open when there is excessive pressure in the tank, hence Breather Valve’s name.

These valves also minimise emission losses and, at the same time protecting the environment.

The size of a PV relief valve may range from 2″ to 12″ depending on the envisaged pressure build-up or vacuum during product withdrawal. Also, the number of Breather valves on a tank may be more than one.

3.8 Instrument Connection

The primary instrument connections on a tank are the level measurement instruments. These instruments may be a transmitter or field display instrument connected to nozzles attached to the roof or shell of the tank. Usually, the transmitters work with the control system to display the liquid level and regulate product flow into and out of the tank.

3.9 Manhole/Manway

Manhole Manways are used to access the inside of the storage tank during maintenance. Medium to large diameter storage tanks should have more than one Manhole. Also, the roof of a tank should have a Manhole to access the inside of the tank.

3.10 Tank Cleanout Connections

This opening is for maintenance and cleaning of the tank. It is not very common in refined petroleum products storage tanks but found in tanks prone to debris accumulation.

3.11 Top Curb Angle

The top curb angle is located on the top of the shell. It serves as an attachment or seat for the tank roof and provides a stiffening function for the tank shell.

Top Curb Angle

Figure 10: Top Curb Angle

3.12 Wind Girder

The wind girders provide stability for the tank, most especially when the tank is empty. If the shell is not stiffened, there is a possibility of shell buckling.

The wind girders, in addition to the top curb angle, provide stiffening for the shell.

Although the primary wind girder or roof provide considerable stability for the tank over its full height, local buckling may occur in empty tall tanks. This buckling may occur between the top of the tank and the base. To prevent buckling, intermediate wind girders are provided at intervals in the tank height.

The outer periphery of a wind girder may be polygonal or circular. Drain holes should be provided for trapped rainwater.

Tank Wind Girder

Figure 11: Tank Wind Girder

3.13 Tank Spiral Stairways

Tanks shall have spiral stairways with an intermediate landing. The stairways are provided with handrails. The stairways are designed for the maximum envisaged load it will carry with a factor of safety applied.

3.14 Earthing and Cathodic Protection Connection

All tanks shall be provided with earthing connection and cathodic protection system. Some tanks are protected using impressed current, while some have sacrificial anodes.

3.15 Tank Gauging System Hatch

The gauging system is a combination of a gauging pole and hatch. Gauging hatch provides access to the tank when manual level gauging or sampling is desired. The gauging hatch is connected to a gauge pole that is installed through the roof into the tank.

Tank Gauging System under Installation

Figure 12: Tank Gauging System under Installation

3.16 Tank Fire Fighting System

Tanks storing petroleum products are provided with a firefighting system. The firefighting system combines foam and water piped around the shell at a calculated elevation and around the tank on top.

Spray nozzles are connected to the piping to discharge the foam and water mixture.

3.17 Plate Material Selection

Plate material selection is a function of the fluid stored in the tank, design process temperature etc. Details of materials and requirements are specified in section 4 of API 650.  As stipulated in API 650, tank material may be manufactured to any of the following specifications:

Refer to section 4.2.3, 4.2.4 and 4.2.5 of API 650 for details

4 References

API 650: Welded Steel Tanks for Oil Storage

EN 140155: Specification for the Design and Manufacture of Site Built, Vertical, Cylindrical, Flat-Bottomed, Above Ground, Welded, Steel Tanks for the Storage of Liquids at Ambient Temperature and Above

NFPA 30: Flammable and Combustible Liquids Code

1 Overview of the Article

This article aims to present a general overview of a packaged sewage treatment process and sewage transportation network. The network described here is mini to medium size, usually seen in Field Logistic Base (FLB), Medium size residential estates etc.

The sewage transported mainly comprises excretes from toilets, water from bathrooms, kitchen and laundry rooms. Note that the sewage network may also transport some element of run-off water from facilities; however, this is assumed not to contain pollutant (such as hydrocarbons) that requires special treatment.

The sewage/effluent network description will cover lift stations, piping materials utilised for sewage network etc.

The treatment package described in this article is a packaged unit, and the technology employed may vary across different Vendors.

2 Introduction

Sewage is waste matter from domestic or industries that are carried away in sewers for dumping or conversion into a form that is not toxic to the environment.

Effluent is treated or untreated wastewater that flows from a process to the surrounding environment.

Sewage/wastewater is generated in all facilities that have toilets, kitchens, laundry rooms etc. The quantity of sewage generated is a function of the capacity of the facility. Sewage is a combination of liquid, solid and suspension that requires treatment.

The liquid is separated from the solid, and each component is treated. The treated solid, including dried sludge, can be used for landfills or usually dumped at a designated location. In contrast, the treated liquid (effluent) is transported to flowing streams or recycled for further use.

Field Logistic base, estates, factories etc., usually have a central sewage treatment facility. Waste from all buildings is channelled through piping into chambers and further into lift stations. The waste is transported into a pump station from the lift stations, which further transport the sewage into a central treatment facility.

3 Sewage Treatment Facility and Network Overview

A sewage treatment facility consists of a piping system connecting toilets, kitchens, laundry rooms, inspection chambers, lift stations. Pump stations and sewage treatment package.

The subsections below briefly describes the components of the sewage network.

f

Figure 1: Typical Sewage/Effluent Network

3.1 Piping Network

Piping are the arteries connecting toilets, kitchen sinks, wash hand basins, floor drains, inspection chambers, lift stations, pump stations and the sewage treatment package.

The piping connected to the toilets are mainly made of PVC (polyvinyl chloride) materials. The piping from the toilets are connected to inspection chambers, solid materials trapped in the chamber are removed periodically. Piping from the toilet to the chamber should slope toward the chamber, and the piping out of the chamber should slope outward the chamber. The piping entering the chamber should have a higher elevation than the one exiting the chamber.

3.1.1 Piping Materials Requirement

Various piping materials are used for the sewage piping network; however, some materials such as carbon steel are rarely used due to the fluid’s high corrosive nature. Non-metallic piping (PVC pipes) are mainly used for all plumbing and piping works within the building areas. Central piping within the networks connecting the lift stations and treatment skid are mostly made of non-metallic piping such as HDPE or GRP pipes. Stainless can be used mainly on pump discharge piping; however, they are not as common as non-metallic piping due to the high cost. Lined carbon steel piping may also be used to transport sewage piping if the integrity of the lining is guaranteed.

3.2 Inspection Chambers

Inspection chambers are access points to the sewage piping network. Piping from toilets, floor drains, laundry room may be connected to a chamber depending on the flow. The chamber should be sized for maximum flow from all the sources of flow into the chamber. Flow into the inspection chamber is usually by gravity; therefore, the piping should slope toward the chamber. A single pipe transfers the sewage from a chamber to another larger chamber. The larger inspection chambers are those connected to the lift stations. The number of inspection chambers is dependent on the size of the sewage network. All inspection chambers should have a removable cover for easy access to the chamber.

3.3 Lift Stations

The lift station serves as a pressure or flow booster station. Sewage piping networks are designed for gravity flow. Lift stations are necessary to raise the piping elevation after it has reached a defined depth. The number of lift stations is a function of the length of the piping network.

A lift station is a deep chamber of appropriate dimensions. A pump is installed in the chamber to boost the flow by raising the head of the sewage.

Why are lift stations necessary, and how do they work: Usually, sewage piping are buried; therefore, the minimum burial depth at any location, depending on local regulation, might be approximately 0.8m. The slope of the piping system might range from 1: 25 to 1:50, meaning for every 50m length of piping, the depth of the buried pipe increases by 1m. Assuming the total length of the sewage piping between a lift station and a sewage treatment unit is 1000m, this implies the minimum piping depth based on the slope of 1: 50 is 20.8m. This depth is unachievable; therefore, intermediate lift stations are required at an interval to limit the maximum piping depth to ~3m.  At each lift station, the pumps are installed such that the discharge piping elevation is raised to 0.8m, as previously explained.

Elevation View of a Lift Station

Figure 2: Elevation View of a Lift Station

3.3.1 Lift Station Pumps

The pumps are the only equipment installed in the lift station. The philosophy may be one running on full capacity while the others are on standby. There must be at least a spare pump in every lift station. Depending on the flow requirement, more than two pumps may be required. The pumps are mainly vertical submersible pumps which imply the entire pumps and their drivers; usually, electric motors are submerged. Another pump design configuration is having the pump submerged in the fluid while the driver (Electric motor) is connected to the pump via a shaft; this implies the electric motor is not submerged. The discharge piping is connected to the outlet nozzle of the pump.

Level switches usually control the pumps, i.e. they start running automatically when the sewage volume reaches a set high level set point and stop when the level reaches the low-level set point.

Typical Lift Station Pump

Figure 3: Typical Lift Station Pump

3.4 Inlet Bar Screen

Inlet bar screen may be installed at strategic locations, i.e. upstream of the lift stations or upstream the waste treatment skid. The sewage flows through the inlet bar screen where floating materials, such as clothes, papers, wood, and kitchen, refuse, and other solid materials are trapped and removed from the sewage stream.

The bar screen usually consists of ½ inch diameter bars spaced 1 inch apart that trap all the solid materials; however, the design may vary.

Typical Inlet Bar Screen

Figure 4: Typical Inlet Bar Screen

3.5 Main Pump Station

The pump station is usually installed upstream of the Sewage treatment unit because the inlet nozzle to the skid is at the upper part of the unit, while the sewage piping connection to the nozzle is below ground. The pumps are required to raise the liquid head for easy discharge into the treatment skid. Just like the lift station, there must be spare pumps/ pumps installed in the pump station. The pump station is like the lift stations; the only difference is the pump discharge piping is connected to the sewage treatment skid, while the pumps may be horizontal or vertical depending on the design.

3.6 Sewage Treatment Unit

Depending on the design philosophy, the treatment unit may utilise different technology. Some treatment unit utilises chemical for treatment other utilises naturally occurring biological process. The biological process is the most common technique employed because it has been proven efficient and economically viable.

There are two types of biological processes. They entail the use of anaerobic or aerobic bacteria to break down the waste pollutants. In any of the two processes, the microorganisms (bacteria) utilise the organic pollutants in the wastewater as their energy source of energy for their cell life activities.

Anaerobic waste sewage treatment occurs when there is a lack of oxygen present in the wastewater. Anaerobic treatment occurs under septic conditions is not widely used to treat sewage because the process converts hydrogen and sulphur into hydrogen sulfide and methane. Carbon may also be converted into organic acids that make the water more difficult to treat, promoting odour formation. The anaerobic process requires a longer retention time for the bacteria to break down the pollutants, requires larger tankage than aerobic treatment systems. There is an incomplete breakdown of the pollutant.

The aerobic waste treatment process occurs in the presence of oxygen. The Aerobic bacteria introduced into the sewage treatment unit (Aeration Chamber) rapidly consume the organic waste pollutants in the sewage and release carbon dioxide and water vapour as by-products of the synthesis process. The aerobic process does not result in an explosive atmosphere because methane is not generated.

Also, because of the complete breakdown of the waste pollutants and the release of only carbon dioxide and water, the odour is not generated from the process. Note that aerobic treatment will convert into an anaerobic process if there is no oxygen supply for about twelve to thirty-six hours.

The treatment unit described in this article is a containerised unit that is quickly delivered to the site and relocated. The unit described in this article utilises aerobic treatment process with sub-surface aeration.

The conventional treatment unit used for large sewage systems is not containerised. They are made of concrete.

Typical Sewage Treatment Process

Figure 5: Typical Sewage Treatment Process

Containerised Sewage Treatment Package

Figure 6: Containerised Sewage Treatment Package

Below are the different processing units of a containerised sewage treatment facility

3.6.1 Bar Screen

Refer to session 3.4. for details of the inlet bar screen. Sewage treatment packages usually have an inbuilt bar screen primarily to remove coarse materials, including rags, plastic bags, etc., from entering the sewage treatment unit.

3.6.2 Equalisation Chamber

After the sewage/wastewater has been screened, the wastewater is transferred to the Equalization Chamber, which normalises the flow by eliminating surges that may occur during peak flow times. A set of Equalisation Pumps is installed within the chamber to achieve flow control in this chamber. The pumps transfer plant influent through a flow control box. The box is composed of an adjustable overflow broad weir and a V-notch discharge weir. The broad weir is adjusted to ensure that only a measured amount of pumped influent/wastewater/sewage is discharged through the V-notch weir to the aeration chamber. The remaining influent is recycled back into the equalisation chamber.

3.6.3 Aeration Chamber

Aeration is the process of introducing air into wastewater treatment systems to aid microbial growth to allow aerobic biodegradation of the pollutant components of the sewage. The air is usually supplied from an external source (Air blowers) continuously to boost the degradation of the waste.

The size of the aeration chamber is based on the daily average flow volume of the sewage generated that will be processed. Depending on the type of treatment system, the influent might be retained in the aeration chamber for 18 to 24 hours. This period is required to have an extended aeration biological treatment process that allows for the complete conversion of organic pollutants to non-pollutant. The extended biological treatment process does not generate excess sludge. The sewage entering into the chamber is mixed with water that contains a large concentration of very active aerobic bacteria that consume the organic waste material in the sewage.

3.6.4 Air Supply System

The air supply system is primarily made up of air blowers and the air diffuser. Diffusers are installed in the aeration chamber, while the air blowers are installed in an enclosure within the package. Sub-surface aeration is used in most sewage treatment units meaning the air is introduced into the aeration chamber from below the water.

The Air Blowers compress the air delivered through airlines to the diffusers installed in a pattern on the bottom of the aeration chamber. The diffusers have tiny holes that generate bubbles that contact the water, thereby aerating the water. The air from the diffusers also keeps the bacteria in suspension, provides the agitation necessary to prevent the solids from settling at the bottom of the aeration chamber. There are two types of diffusers: fine bubble and course bubble.

Fine bubbles diffusers have many tiny holes and generate small bubbles compared to coarse bubble diffusers. The tiny bubbles provide maximum contact surface between the oxygen and water. The air from fine bubble diffusers also takes a longer time to get to the surface of the aeration chamber. Fine bubbles diffusers provide better utilisation of oxygen and, therefore, more efficient in oxygen usage.

Coarse Bubble Diffusers have fewer holes and generate larger bubbles. The bubbles travel faster to the surface than the tiny bubbles generated in fine bubbles diffusers. The large bubbles generate turbulence and better mixing of the air and wastewater. In a situation where mixing the air and the wastewater is more important coarse bubble diffusers are a better option.

3.6.5 Clarification Chamber

The organic pollutants are separated from the water in the clarification chamber.

As new sewage is pumped into the aeration chamber, aerated and broken down sewage is pushed into the clarification chamber. The clarification chamber may be designed to hold the fluid for about 6 hours to keep the fluid as still as possible despite the inflow from the aeration chamber and outflow from the clarification chamber.

The clarification is designed such that the top of the clarification chamber is below the waterline of the aeration chamber. This is to ensure that the clarification chamber is kept under head pressure.

The clarification chamber is divided into two sections by a baffle (clarifier baffle). The inside baffle area is towards the aeration chamber, and the outside baffle area is towards the fluid disinfection chamber. The baffle prevents the fluid from leaving the clarification chamber without the proper retention time been attained, thereby promoting the proper settling of flocs/sludge/solids to the bottom. As the organic pollutants/sludge settles to the bottom of the clarifier, a zone of clear liquid is formed on the outside baffle. New fluid flowing into the clarification chamber gradually push the clear liquid into the Media Chamber

Most of the sludge in the clarification chamber is continuously drawn back into the aeration chamber by an airlift sludge return line. Also, floating materials in the inside baffle are drawn back into the aeration by a skimmer return line. The sludge and the floating materials are then subjected to the same synthesis process as the bacteria’s.

Note: The air blowers supply the required air to the sludge return line and the skimmer line.

3.6.6 Media Chamber

Transparent liquid from the clarification chambers flows into the media chamber, where the fluid is polished. The fluid is made to pass through a media bed, thereby allowing for the settling and removing of any solids that could pass through the clarification chamber. Media Chamber is optional.

3.6.7 Disinfection Chamber

The last treatment activity occurs in the disinfection chamber. Liquid from the media chamber flows into the disinfection chamber, where an appropriate amount of chemical is injected. Liquid chlorine is used for disinfection. The dosing pump is set to deliver an appropriate volume of liquid chlorine into the disinfection chamber.

Must provide adequate time for the chlorine to come in direct contact with all the microorganisms in the liquid; else disinfection will be incomplete. After the chemical dosing, the effluent is disposed of or reused. A test should be carried out periodically on the effluent to confirm the composition of the effluent been discharged into the environment.

3.6.8 Sludge Holding/Processing Unit

As previously stated, most of the sludge is lifted back into the aeration chamber for reprocessing; however, excess sludge should be discharged from the system into the sludge processing unit. The excess sludge is sent into the sludge processing unit, where most of the liquid is allowed to settle. The liquid is sent back into the aeration chamber while the sludge is sent into a sludge drying bed/unit. The dried sludge may be utilised for landfill or disposed of appropriately.

3.6.9 Control Panel

The packaged unit usually have control panels (Electrical and instrumentation) where the equipment is controlled. The panels are installed within an enclosure or outside close to the treatment unit.

1 Introduction

The production, transportation, and energy consumption through fossil fuels lead to many environmental issues today. Some of these issues include ozone depletion, acid rain, global warming, and climate change (Dincer, 2012:1954). Experts state that a rise in the average global temperature needs to be limited to 1.5°C above pre-industrial levels to avert some of the worst effects of climate change. This will be achieved when the Global carbon emissions decrease to zero by 2050 (IPCC, 2018). Various solutions to minimise the average carbon emissions have been developed, but the most promising is renewable energy and hydrogen. Increasing the use of renewable energy can help to decrease the amount of carbon dioxide emissions. Renewable energy depends on changing conditions and cannot always be supplied according to demand. Thus, it is mandatory to develop energy storage to store the generated renewable energy. One of the possible ways to store energy is through hydrogen. This report focuses on the value chain and the economic viability of hydrogen.

2 Hydrogen as an alternative

Hydrogen is the smallest and most abundant element in the universe. Hydrogen does not occur naturally but is always found in combination with other elements. Hydrogen can be produced by extracting it from a variety of compounds found in nature. Hydrogen extraction can take place in four different ways depending on the substance and the method used. Colours are used to classify the different processes (Israel et al., 2020:8).

Hydrogen production through processes contributing to carbon emissions is called brown or grey hydrogen. Brown hydrogen is manufactured from coal through a process revered to gasification. Gasification is when coal is reacted with super-heated steam to produce hydrogen and carbon monoxide.  Grey hydrogen is produced from natural gas through steam methane reforming (SMR), where natural gas reacts with steam at high temperatures (Israel et al., 2020:8). Extracting hydrogen from fossil fuels is a pollution heavy process and contributes to 843 metric tons of carbon dioxide emissions every year. It is thus necessary to divert to cleaner methods of hydrogen extraction.

The zero carbon-emitting alternatives are called green or blue hydrogen.  Blue hydrogen produces hydrogen using fossil hydrocarbons with adsorption carbon capture and storage (CCS). The carbon released during extraction is removed, minimising carbon emissions. Although this is a cleaner way of extracting hydrogen through fossil fuels, less than 0.4 metric tons of 69 metric tons of hydrogen use CCS (Israel et al., 2020:8). Green hydrogen is the extraction of hydrogen from water through electrolysis using renewable energy (Dincer, 2012:1955). This is the cleanest and most effective way of producing hydrogen from substances. However, Figure 1 shows that only 0.3% of the hydrogen produced is green hydrogen.

Figure 1 illustrates the production of hydrogen using water, coal, fossil hydrocarbons, and renewables. Hydrogen extracted from fossil hydrocarbons is responsible for 99% of the global hydrogen extraction, consuming 6% of the natural, 2% of the coal resources, and contributing to 2.2% of the carbon emissions. Conversely, zero carbon-emitting extraction methods are responsible for less than 1% of the produced hydrogen. The reason for this is that electrolysis is a costly process, and several challenges remain. Challenges include transportation, storage, and the lack of infrastructure. To ensure zero-carbon emission energy, much money and resources need to be invested in green hydrogen (Israel et al., 2020:9).

1 Global hydrogen production

Figure 1-Global hydrogen production. Source: BofA GLOBAL RESEARCH

3 Green hydrogen in a hydrogen economy

The future of a hydrogen economy lies in green hydrogen. The energy used during electrolysis needs to be renewable to produce green hydrogen. This renewable energy can be solar energy, wind energy, hydropower, runoff waters, and fissionable materials. Green hydrogen is an important concept as it can be utilised in sectors and industries responsible for high carbon emissions. This includes the oil and gas, transportation, iron, and steel industry (Dincer, 2012:1955).

Value chain of green hydrogen

Figure 2-Value chain of green hydrogen. Source: Herbert Smith Freehills.

3.1 The production of green hydrogen through electrolysis

Water can be decomposed into hydrogen and oxygen molecules through electrolysis. Electrolysis is an energy-intensive process that requires renewable energy to produce hydrogen. Electrolysers consist out of an anode and cathode submerses in water. A permeable membrane separates the anode and the cathodes. An electrical current is passed through the electrolyser, causing the water molecules to split into oxygen and hydrogen. The oxygen and the hydrogen are separated, and the hydrogen is used to store the renewable energy (Israel et al., 2020:10).  The energy required to extract hydrogen from water is higher than the energy released from hydrogen. Due to this property, hydrogen is used to store renewable energy (Barbir, 2004:661).

Conversely, the reversed reaction consumes hydrogen and oxygen and produces energy and water. Energy is produced in the form of a current and is said to be renewable. The energy can power a motor vehicle, add electricity to the grid, etc. There are different electrolysers, namely Alkaline, Proton Exchange Membrane (PEM), and Solid Oxide (Israel et al., 2020:10).

3.2 Alkaline electrolyser

Most electrolysers are based on Alkaline as an electrolyte. The electrolytes are submerged in an aqueous alkaline solution of 30% KOH. During electrolysis, charge flows between the electrodes and the current in the form of OH-. Consequently, hydrogen is formed at the cathode while oxygen is formed at the anode. A membrane separates the two reaction areas to ensure that the hydrogen and the oxygen do not mix (Artuso, et al., 2010:7956). This electrolyser is inexpensive but has a lower energy efficiency than PEM electrolysis (Israel et al., 2020:10).

3.3 Proton Exchange Membrane electrolyser (PEM)

PEM electrolyser uses a proton exchange membrane as an electrolyte. Protons pass through the PEM with the help of electroosmotic drag and form hydrogen at the cathode. Respectively, oxygen forms at the anode. Much research is currently conducted on PEM Electrolysers as it produces greater efficiencies, versatility, and higher power. The biggest barrier to overcome is the higher cost than Alkaline electrolysers (Litster & McLean, 2004:61).

3.4 Solid Oxide electrolyser (SOEC)

The electrolyte of the SEOC consists out of a solid ceramic material heated to 700°C to 900°C. Water and carbon dioxide are heated before entering the SEOC, and through electrolysis, hydrogen and carbon monoxide are formed. After that, hydrogen and carbon monoxide with a catalyst produces a synthetic fuel (Jensen et al., 2010:9544). Although SOEC is more efficient than PEM, it is still in a research phase and has not been performed on a large scale yet (Israel et al., 2020:10).

4 Storage of Hydrogen

Pure hydrogen can be stored in the liquid and the gas phase depending on the resources available.  The large-scale storage of pure hydrogen is important for a hydrogen economy to function effectively. Hydrogen is already being stored in salt caverns beneath the ground on an industrial scale. Due to the lack of salt caverns and geological conditions, alternative storage methods are being researched. These methods are liquid hydrogen and compressed hydrogen, considering storage density, costs, and safety (Andersson & Grönkvist, 2019:11901).

4.1 Salt caverns/underground storage

Salt caverns are the most suitable method to store hydrogen underground as it is inexpensive and low on construction costs. This method also has high injections and withdrawal rates, low to zero leakage rates, and low risks of contamination. Apart from the numerous advantages, this method cannot be considered the main hydrogen storage solution. The reason for this is not all regions have the proper geological prerequisites. There exists a large natural gas vessel below the ground that is lined with a steel cylinder. This lined rock cavern is in Sweden and can store approximately 740 tons of hydrogen if stored under the same conditions as natural gas. It is possible to store hydrogen the same way, but further research is needed (Andersson & Grönkvist, 2019:11903).

4.2 Compressed hydrogen gas

A storage system that compresses gas consists out of storage compartments and compressors.  Hydrogen is compressed and stored in metal containers. Metal containers are used despite the high investment costs. Metal containers ensure the purity of the hydrogen, stability of the containers, and independence of location. Compressed hydrogen gas in metal containers can be stored above and below the ground (Andersson & Grönkvist, 2019:11903).

Containers can be stored underground in cases where space is limited. Storing larger containers underground saves space, protects containers against weather, and insulates pure hydrogen gas. However, maintenance of underground containers is difficult and external coatings are needed to prevent corrosion. The same types of vessels used to store natural gas can be used to store hydrogen gas. The three main types of vessels include gas holders (storage pressures slightly above atmospheric pressure), spherical pressure vessels (storage pressures below 20 bar), and pipe storages (storage pressures below 100 bar) (Andersson & Grönkvist, 2019:11903).

For large-scale storage, pipe storages are the most suitable due to the higher storage pressure. A series of pipes are placed a couple of meters below the ground with the ends sealed. The length of a pipeline series can be several kilometres long, storing up to 12 tons of hydrogen per kilometre of pipeline. The construction of hydrogen pipelines is more expensive than that of natural gas. This is due to hydrogen embrittlement that negatively impacts the mechanical properties of steel materials (Andersson & Grönkvist, 2019:11903).

4.3 Liquid hydrogen

Hydrogen can be stored in the liquid phase through liquefaction. With liquefaction, very high hydrogen storage densities can be gained at atmospheric pressure. The biggest disadvantage of liquid hydrogen is the cost of liquefaction. This process is very expensive due to the extremely low boiling point of -253°C, and that hydrogen gas needs to be precooled through evaporating liquid nitrogen. In addition to the high costs of liquefaction, the capital costs of a liquefaction plant consume 40-50% of the total costs of liquefaction. Nevertheless, hydrogen liquefaction is a well-developed process used in the industry (Andersson & Grönkvist, 2019:11904).

Once the hydrogen has been liquefied, it should be stored in vessels designed to minimise liquid hydrogen evaporation. The evaporation of hydrogen leads to a loss in the energy used for liquefication and a loss in the hydrogen escaping through the vessel’s vents. The loss of evaporated hydrogen per day is known as the boil-off rate. The storage vessels are designed with two walls with a high vacuum between them to prevent heat transfer. Additional materials such as alumina-coated polyester sheets are also placed between the walls to prevent heat transfer due to radiation. The high degree of insulation in large spherical vessels can limit the boil-off rate up to 0.1% per day. The largest operated storage vessel stores up to 270 tons of liquid hydrogen. It is believed that even larger liquid vessels are possible (Andersson & Grönkvist, 2019:11904).

The boil-off of hydrogen is less concerning when the liquefaction plant and the storage are close in approximation. This is because the evaporated hydrogen can be injected back into the late stages of the liquefaction process and be converted into liquid again.

Although liquid hydrogen storage is more complex, it obtains a lower cost per weight of hydrogen stored than pressurised hydrogen on a large scale (Andersson & Grönkvist, 2019:11904).

5 Transportation of Hydrogen

Hydrogen can be transported in liquid and the gas phase.

5.1 Gaseous hydrogen transportation

Hydrogen gas can be transported through gas containers in tube tanks or through gas pipelines.

5.1.1 Pipelines

Gas pipelines can stretch for several kilometres transporting hydrogen gas from hydrogen plants to consumers. This type of transportation can have a high investment cost. Because of this fact, researchers are exploring the use of existing natural gas pipeline infrastructure to transport hydrogen gas (Moradi & Groth, 2019:12259).

5.1.2 Tube trailers

Researchers are in the process of designing a high-pressure tube trailer. These tanks can store up to 616 kg of hydrogen at 250 bars. This mass is 7% of the total weight of the high-pressure tube trailer. This method of transport is favourable as it does not require specific infrastructure. Furthermore, hydrogen loss in tube trailers is minor, and the compression cost is low. The compression cost can reduce up to 60% in comparison with liquid hydrogen transportation. In terms of safety, tube trailers undergo penetration tests, hydrostatic burst, cyclic temperature tests, leakage tests, and pressure tests. Some concerns include liner blistering because of saturation and decompression at 350 bar, the high cost of production, the small capacity of tube trailers, and the restriction of size and pressure due to regulations (Moradi & Groth, 2019:12259).

5.2 Liquid hydrogen transportation

Liquid hydrogen transport is economical if the demand is high (more than 500kg/day) and the travelling distance is not extremely far. This type of transport is known as cryogenic hydrogen delivery. Cryogenic tanks are used to transport liquid hydrogen from liquefaction plants to consumers. Hydrogen fuel stations are supplied with liquid hydrogen rather than gas hydrogen because of the higher capacities of liquid hydrogen transport (Moradi & Groth, 2019:12259).

6 Applications of Green Hydrogen

Hydrogen can be used in the transportation, industrial, energy, and agriculture sector. In transportation, hydrogen powers hydrogen fuel cells in trucks, cars, and trains. In the energy sector excess, renewable energy is stored as chemical energy in hydrogen. This can overcome the unstable and unpredictable energy supplied by renewable energy sources. Hydrogen can also be injected into gas networks for domestic use (Developing Green Hydrogen projects, 2021)

Schematic of the distribution of renewable energy through hydrogen

Figure 3-Schematic of the distribution of renewable energy through hydrogen. Source: Yang, Ma, Lian, Zhang & Pang, 2021:126830

6.1 Hydrogen fuel-cell

Hydrogen can act as a fuel in a hydrogen-powered vehicle. Using hydrogen as a fuel source can help implement renewable energy in the transportation market. Hydrogen fuel cells are proven to be more efficient and sustainable than electrical batteries (Dincer, 2002:273).

The first focus of transition is on fleet vehicles like transit buses. The reason for this is that depots will facilitate hydrogen as fuel, buses are a significant source of carbon dioxide emissions, and hydrogen-powered buses are expected to be low on maintenance costs. Hydrogen is pumped into a fuel cell bus, and compressed hydrogen is fed to the engine. The performance of the bus is the same as a diesel-fuelled bus with more advantages. These advantages are softer engines and less harmful emissions. Major automobile companies are also turning their attention to fuel cell technology. Most companies have already launched hydrogen-powered vehicles that are available for public purchasing (Dincer, 2002:273).

Fuel cells have numerous advantages. It can produce electricity efficiently without any moving parts. The temperatures at which electricity is generated are relatively low since no combustion is required. Without combustion or moving parts, the vehicle can go longer before going for a service. Fuel cells were proven to be safe, very reliable, and less prone to break. Also, fuel cells can help reduce carbon emissions as the energy used to produce hydrogen is entirely renewable energy (Dincer, 2002:274).

Fuel cells are based on the same principle as a battery, but it does not run down or need to be charged. Hydrogen reacts with oxygen in an electrolyte to generate a current between two electrodes. Therefore, it converts the chemical energy of hydrogen and oxygen to water, electricity, and heat. Oxygen is obtained from the atmosphere and hydrogen from a hydrogen fuel station. As long as hydrogen is supplied to the engine, electricity will be generated along with water and heat as by-products (Dincer, 2002:274).

Hydrogen reacts with oxygen in an electrolyte to generate a current between two electrodes. Fuel cells can be categorised based on their operating temperatures, namely low temperature and high-temperature fuel cells. Low-temperature fuel cells have a quick start-up time, a smaller volume, and lower weight than high-temperature fuel cells. Examples of low-temperature cells are PEM, alkaline, phosphoric acid, direct methanol, and unitised regenerative fuel cells. High-temperature fuel cells are more power-efficient than low-temperature fuel cells. These fuel cells produce excess heat, which is problematic in transportation. However, this excess heat is favourable in stationary applications (Dincer, 2002:275).

Schematic of the working of a fuel cell 1

Figure 4-Schematic of the working of a fuel cell. Source: Dincer, 2002.

6.2 Green hydrogen in a smart grid

Renewable energy is integrated into the main energy grid through means of storage. Energy can be stored in hydrogen as chemical energy. The demand for renewable energy is increasing due to the environmental crisis caused by carbon emissions and the increasing prices of fossil fuels. Renewable sources supply unstable and unpredictable energy as it is dependent on numerous factors, like the time of day, weather, and the season. This can lead to an electricity shortage during peak usage. To resolve this problem, monitor, sensor, and communication systems should be implemented into smart grids. Furthermore, excess renewable energy can be stored in hydrogen. Storing excess renewable energy in hydrogen can overcome shortages during peak periods (Lin et al., 2020:20165).

Microgrids are small power systems that are an important development regarding smart grids. These girds are highly reliable and can supply electricity to local demands. They are comprised of a solar panel, a hydrogen fuel stack, and a tank that stores hydrogen. Microgrids can either be stand-alone or grid-tied (Lin et al., 2020:20165).

This sector still needs more research and resources to achieve zero carbon emission energy by 2050.

6.3 Hydrogen in existing natural gas networks

Hydrogen injected into natural gas networks can allow for indirect electricity transport and storage. The composition of the gas mixture can vary at different locations. A mixture can consist of up to 10% hydrogen in the volume of natural gas. If a natural gas refuelling system is connected to the network, this ratio can crop to 2%. More research is necessary to inspect the impact of the gas mixture on the pipe network (Abeysekera et al., 2020:992).

7 The Cost and Viability of Hydrogen

The two sectors developing at an immense speed are fuel cells in transportation and hydrogen injection in existing gas infrastructure. This is because major automobile companies compete to develop a hydrogen-fuelled vehicle at low cost and high efficiency. Hydrogen injection is a more cost-efficient way of adding hydrogen power to the grid.

7.1 Hydrogen cost development

Large industrial producers determine the internal Hydrogen prices in Europe. This price depends on the consumer’s location, which determines if the hydrogen is delivered in a gaseous or a liquid phase. This price is also dependent on the quality and the purity of the hydrogen. Transportation, storage, and distribution are important in hydrogen production and contribute to the total cost of hydrogen. In Europe, the main production method used is Steam methane reforming (SMR). As mentioned in Section 2, SMR produces carbon dioxide; thus, the produced hydrogen is classified as grey hydrogen. This is expected, as 99% of hydrogen production is through fossil fuels. Today the price of hydrogen varies between 10 and 60 €/kg of hydrogen, where 60 €/kg is the purist available hydrogen. The futuristic prices of hydrogen are calculated by analysing its production costs. As the cost of hydrogen decreases, the demand will increase. It is predicted that the demand will increase to around 750000 tons/year in 2030. Figure 5 illustrates the cost of hydrogen in the past and the predicted costs according to different studies (Jovan & Dolanc, 2020:3).

Cost of hydrogen from 2015 to 2030

Figure 5-Cost of hydrogen from 2015 to 2030 (7. Financial viability_3)

7.2 Cost of hydrogen for household consumers

Hydrogen gas prices for household consumers are 6 €/kg. This price cannot compete with the price of natural gas at 1 €/kg. (https://www.euractiv.com/section/energy/opinion/what-is-the-real-cost-of-green-hydrogen/)

Researchers show that injecting hydrogen into exciting gas infrastructure is more cost-efficient than integrating hydrogen into main grids. The reason for this is costly grid upgrades and storage facilities (Erbach & Jensen, 2021:2)

7.3 Cost of hydrogen fuel

The cost of hydrogen fuel will mainly depend on production, transportation, and distribution. It is expected that hydrogen fuel costs will be high initially due to high production costs and low purchases (Jovan & Dolanc, 2020:3). In Germany, the hydrogen fuel price currently is 9.50 €/kg (one kilogram of hydrogen can fuel a fuel cell for 100 kilometres) (H2. LIVE: Hydrogen Stations in Germany & Europe, 2021). At the same time, the price of gasoline is 1.39 €/litre (Gasoline prices Germany 2021 | Statista, 2021). Although the price of hydrogen fuel is costly compared to gasoline, the hydrogen fuel prices are decreasing as the total consumers increase (Jovan & Dolanc, 2020:3).

8 Conclusion

Green hydrogen is a promising solution to zero-carbon emission energy. Since 99% of the hydrogen produced today is extracted from fossil fuels, a great deal of capital and resources is necessary to make green hydrogen the main production method. Although green hydrogen is more expensive than fossil fuels, the reduction in environmental impact, competition between major automobile companies, and decreasing hydrogen prices are making green hydrogen more attractive.

1 The Background of Hydraulic Fracturing

1.1 Types of unconventional hydrocarbon resources

Oil sands

Extra heavy crude oil or bitumen trapped in unconsolidated sands. Examples include the Athabasca Basin tar sands in the McMurray Formation, Alberta, Canada, and the Orinoco Basin heavy oil belt in Venezuela. Oil sands are extracted using surface mining and in situ steam‐assisted gravity drainage (SAGD), and significant post‐extraction processing is required, which is energy-intensive.

Oil shale

Organic‐rich shales and fine‐grained rocks containing significant volumes of kerogen. Oil shale is extracted in open‐pit mines and in situ. An example of oil shale is the thick deposits of the Piceance Basin. Southwestern Wyoming, northwestern Colorado, and northeastern Utah host some of the largest oil shale deposits in the world. Significant post‐extraction processing is required, which is energy-intensive. The oil shale is heated up to about 500°C in the absence of oxygen as part of the energy‐intensive post‐extraction processing.

Coalbed methane

Natural gas associated with coal seams. Removal of methane prior to mining has been ongoing for decades. A standard method of extraction, hydraulic fracturing, and horizontal wells has been designed for coalbed methane projects to maximise the intersections of the natural fractures found in coal. Water is coproduced with the methane. In the early 1980s, methane was extracted from the bituminous coalbeds in the Black Warrior Basin in Alabama. Other areas of coalbed methane include the Powder River Basin in Wyoming, the San Juan Basin and Raton Basin in Colorado and New Mexico.

Residual oil zones (ROZs)

Well‐documented ROZs exist in the Permian Basin in West Texas in the San Andres dolomites as well as near Prudhoe Bay on the North Slope of Alaska. ROZ formations, which are now a target for unconventional oil production, appear in cores and geophysical logs as a partially produced oil field with a portion of residual oil left in place.

ROZs are frequently produced in areas with (i) existing oil production infrastructure and (ii) a large number of existing wells and geologic data, which lowers the exploration risk of a dry hole. In addition, the unconventional oil and gas production methods of horizontal drilling combined with high‐volume hydraulic fracturing using specialised chemicals can be used.

Tight oil

Light to medium crude oil trapped in shales and low‐permeability sands require hydraulic fracture stimulation, horizontal drain holes, and specialised extraction chemicals. The Bakken Formation in the Williston Basin in North Dakota, Montana, Saskatchewan, and Manitoba is an example.

Tight gas

Gas produced from regional sandstones and carbonate reservoirs with low porosity. These reservoirs contain the gas that migrated into the tight formation, generally having <0.1 millidarcy matrix permeability and <10% matrix porosity but were sourced from other formations. Horizontal drilling has been used successfully to extract the tight gas.

Shale gas

Thermogenic methane and natural gas in black shales with high organic content. The extraction of shale gas requires hydraulic fracture stimulation, horizontal drain holes, and specialised extraction chemicals. An example is the Marcellus Formation in Pennsylvania and several other states within the Appalachian Basin.

1.2 How does it work?

Hydraulic fracturing was commercially introduced by the U.S. company Statolind Oil in 1949 but had its origins in the use of explosive liquids to “shoot” (i.e., stimulate) oil wells in the 1860s (Montgomery & Smith, 2010, p. 27). Now commonly referred to as fracking, it has developed into a process that involves the pumping of “frac fluids”—a mixture of primarily freshwater, proppants such as silica sand and chemicals—under very high pressure into low permeable gas-bearing formations. This creates fractures that enable gas flow through these fractures to the well.

fig1

Figure 1. The general process of hydraulic fracturing. Source: https://doi.org/10.1016/j.envint.2019.02.019

The hydraulic fracturing process begins with finding water sources, stipulating the amount of water required, and conducting convenient wastewater management. The water obtained from the source is transported to fracking wells by a pipeline or truck and stored until used in chemical mixing. The posterior perforation process uses a mixture of water, sand, and exclusive drilling additives. During drilling, steel pipes used for casing the well should be implemented with cement to prevent entry by water, oil, or gas.

Once construction is completed, the obtained water is supplemented with additives to begin the fracturing process. The resulting fluid is injected into the well at a high pressure to fracture the rock deposit and release oil and gas. The flowback process happens before oil and gas production. It can recover the oil and gas initially generated utilising a high proportion of flowback water, which mostly contains injected water and some shale formation water [1]. Next, the process begins to produce formation water and hydrocarbons [2].

During the production phase, which lasts until re-fracturing or the well is abandoned, oil, gas, and generated water made up primarily (or totally) of formation water, arrive at the wellbore to be collected at the surface. Both the retrieved flowback and produced water undergo one of the following paths: (i) storage, (ii) disposal, (iii) treatment and reuse, and (iv) treatment and disposal. The fracking process continuously stimulates the production of oil and gas until the well is no longer productive. At this stage, the well is clogged or sealed with cement barriers and then abandoned. The process presented in Fig. 1 is a universal procedure, and some alternatives that are slightly different are adopted at various locations.

1.3 Why is it resisted?

Public acceptance is crucial for implementing energy technologies like hydraulic fracturing but currently finds strong public opposition worldwide, especially in Europe. Shale gas exploitation faces growing public opposition among individuals and civil organisations, who argue that granting permits infringes local water resource legislation that they were obtained without conducting environmental studies and that public information and participation are not allowed.

Though natural gas produces fewer carbon emissions than other fossil fuels when it burns, for some, it is questionably a “clean” energy source — especially when it comes via fracking. Moreover, as science increasingly shows, the extraction of natural gas or oil via fracking can release significant amounts of air and water contaminants that imperil the health of local communities and the environment. Consequently, many municipalities have rallied against fracking projects [3].

Shale gas development is a controversial subject, and the lessons learnt from recent negative experiences (France, Ireland, Wales, states of Washington and Maryland, the province of Mendoza, the Burgos province) can be vital for policymakers seeking to balance the needs of local communities grappling with unconventional oil/gas development with those of broader regional or national populations.

The decisive rejection for shale gas revealed in many communities at an individual level can be potentially explained by the proximity to the area, protection of rural areas, and mainly the lack of presentation of environmental compensation programs and practices. However, to date, the absence of comprehensive financial and impact compensation programs for the areas and communities where shale gas projects are likely to be developed can be understood as another relevant driver of public rejection.

fig2

Figure 2. Risks associated with fracking to the environment, human health, and climate Source: https://www.nrdc.org/stories/fracking-101

2 The Ecological Aspects of Fracking

2.1 Water-related risks

The attention given to water resources could point toward the most sensitively negative impact caused by shale gas exploration, which is also a well-known public concern.

The focus on water contamination, wastewater treatment requirements, and water resources allocation is predictable due to advancing practical industry experience and new legislation. Nevertheless, cost-effective wastewater treatment remains a challenge with no 100%-favourable solution soon [4].

There are five main stages for the water life cycle in the hydraulic fracturing process: (i) water acquisition, (ii) chemical mixing, (iii) well injection (fracking), (iv) flowback process and produced water manipulation, and (v) wastewater treatment and disposal.

tabl1

Table 1. Potential risks on the different water life cycle stages. Adapted from https://doi.org/10.1016/j.envint.2019.02.019

Water allocation

The hydraulic fracturing process is widespread in Texas (U.S.) and Neuquen (Argentina), where most wells are located in regions facing moderate to extreme water stress. The climate of these areas varies from semiarid to sub-humid, and the state of Texas has faced exceptional or severe drought in recent years. Nevertheless, it can be expected that the water usage for hydraulic fracturing in these and other host areas will reach unprecedented levels.

The potential for water shortages is dependent on both the available water capacity of the system and the schedule of withdrawal [5]. Pennsylvania is another hotspot for shale practices. Recently, the state’s Department of Environmental Protection and a River Basin Commission have implemented strategies to avoid water stress due to fracking operations: tailoring the permitted volumes of water acquisition and maximum daily withdrawals according to the stream size, identifying the minimum requirements of daily pass-by flow based on the ecological functions, and encouraging recycling/reusing the wastewater.

Chemical mixing

The fracturing fluid consists of water (~94%), proppant (~5%), and various chemical additives (~1%) [6]. Sand is the most commonly used proppant — an agent that can maintain the fractures to release the hydrocarbons. Alternative proppants include resin-coated sand, intermediate-strength ceramics, and high-strength sintered bauxite and zirconium oxide. A commonly used formula of chemical additives consists of an acid, surfactant, biocide, corrosion inhibitor, breaker, crosslinker, friction reducer, clay stabiliser, gel, iron control, non-emulsifier, scale inhibitor, and pH-adjusting agent. To provide a general overview of the total amount of chemical additives used in fracking, the Council of Canadian Academies [7] reported that approximately 1000 kg of friction reducer, 0.3 m3 of corrosion inhibitor, 900 kg of disinfectant, 1.5 million kg of proppant, and 100 m3 of acid are used in a single fracturing operation per well in Canada.

Some organic components of the fluid could remain over a significant percentage of the initial concentrations at a transport distance of several meters, with an increased probability of exposure via groundwater based on mobility, persistence, toxicity, and frequency of use. Also, some biocides potentially transform into more toxic or environmentally persistent compounds, which may accumulate by adsorption onto soils and sediments.

The EPA has classified over a thousand chemicals used as fracturing additives. Nearly thirty of these were acknowledged or suspected to be carcinogens or recorded as dangerous contaminants of drinking water. What is more, fracturing additives, such as biocides, electrophilic monomers, and strong oxidants, were identified as primary risks to human health. In addition, the compositions of chemicals reaching the surface from the fracturing of the geologic formation, including petroleum hydrocarbons and metals/metalloids, are labelled as drivers of ecosystem toxicity.

Flowback and process water

The flowback and process water components that cause major concern are salt, oil and grease, natural organic and inorganic compounds, chemical additives, and naturally occurring radioactive materials (NORMs) from the shale formation. Spills and leakages could cause surface and groundwater pollution comparable to that during the chemical mixing and well injection phases.

fig3

Figure 3. An impoundment containing produced waters at a drilling operation in Texas. Source: https://www.americangeosciences.org/critical-issues/faq/what-produced-water

For example, the Texas Railroad Commission and the Commission on Environmental Quality identified that spills predominantly consisted of oil, gas, and liquid condensate rather than fracking [8]. Others observed that inorganic contamination (e.g., Cl, Na, Pb, Br, Se, V, NH4, Ra228, and Ra226) associated with spills of fracking wastewater in North Dakota is remarkably persistent up to four years following the spill events. Sadly, it has also been demonstrated that biodegradation of organic compounds in this wastewater could be inhibited in the presence of the biocide glutaraldehyde, which might be relevant for the fate and transport of potentially hazardous compounds due to accidental release or leakage.

During the last decade, many cases of pipeline leaks were documented in North Dakota, Colorado, New Mexico, and Pennsylvania, in which up to a fifth of these spills occurred within the surface water setback distance of current regulations. However, specific spill and leakage information for flowback and produced water is not easily reached by the public, hindering the risk assessment of this stage.

2.2 Carbon footprint

The climate change section will focus on the two main direct GHG resulting from shale gas exploration and exploitation, namely, methane and carbon dioxide. First, methane leakage rate is an extremely important value for GHG estimations, though widely contested in standards and the literature. Defined as the percentage of methane leaked over the total gas produced, methane leakage rate estimates vary from 0.42% to ranges of 0.66–3.9% and even as high as 3.6–7.9%.

Life cycle assessments (LCAs) are often performed for more accurate GHG emissions assessments. For example, a research study developed a systematic review of eight LCA and concluded that emissions from shale gas averaged approximately 488 CO2 equivalent/kWh [9]. With that being said, shale gas entire life cycle GHG emissions are still lower than coal for electricity generation and heating. Conflicting results were also reported for conventional versus shale gas operations for GHG emissions. The same study concluded similar emissions for this energy source, while other authors declare an increase of 1.8 to 17% for shale gas over conventional gas.

An essential aspect of unconventional carbon footprint is the proposed or implemented mitigation strategies to attenuate total GHG emissions. This focus has primarily been on initial well completion since methane leakage may be extremely high during this process. In order to mitigate these GHG emissions, a wide variety of technologies are available and are referred to as reduced emission completions (RECs).

One alternative option to venting is to recapture with the intention to sell. This option may be economically feasible considering that expected methane losses are much higher during well completion of shale gas than conventional gas because of hydraulic fracturing. From a regulatory standpoint, the USEPA defined that each well completion occurring after January 1, 2015, must employ REC in combination with a completion combustion device (flaring) [10].

Other technologies that may be considered are carbon capture and storage (CCS) in depleted shale gas reservoirs and the use of supercritical CO2 as a working fluid in hydraulic fracturing. However, studies on CCS in depleted shale gas reservoirs have yet to prove that the sequestration capacity is sufficient to offset overall GHG emissions from the industry. Supercritical CO2 has the potential to simultaneously reduce water requirements and sequester CO2, thereby reducing two critical aspects of shale gas production. However, additional tests are needed to determine the efficacy of this technology in the field.

2.3 Other environmental standards

Air quality

The fast development of shale gas in proximity to residential areas and heavily populated areas has raised concerns on the impact of local and regional air quality. Although there remains much uncertainty over this issue to date, it may be related to the fact that air pollution generated by the shale gas industry is challenging and costly to monitor. For example, sampling must take place over a long time to obtain robust results.

Therefore, it is not surprising that only a few relevant reports were found to report raw data emissions. Furthermore, of the published data, comparisons between the studies were limited due to the highly heterogeneous nature of the data collected, the number of samples taken, the type, and even the specific compounds analysed [11]. Nevertheless, some general trends are found through the analysis of available information.

Emissions are generally classified into the following categories: VOCs, PAHs, particulate matter (PMx), NOx, SOx, carbonyls—such as formaldehyde, and ozone, a secondary pollutant resulting from the reaction of NOx and VOC in the presence of solar radiation. One important contaminant that is hardly ever addressed is radon.

There is an excellent variety of equipment that may be considered a source of air pollution either through combustion or fugitive emissions. For combustion, an assortment of devices (generators, compressors, among others) utilise diesel engines during their operations since they are traditionally used in shale gas exploration and operational activities and emit various air pollutants listed above.

Land use

Land use can be defined as the conversion of land from one type of biome/management to another. Shale gas exploration and exploitation involves various building activities in the selected area. Following the successful identification of potential areas using different methodologies, well pad construction requires the removal of soil and vegetation and the transport, handling, and storage of chemicals and other materials for the building of gas pipelines, water extraction structures, and other operational facilities. These activities are liable to impact land use, cause habitat disruption, erosion, and increase noise pollution.

fig4

Figure 4. View of fracking from the air at Jonah field, Wyoming. Source: https://ecoflight.zenfolio.com/p648196342/h32638d19#h32638d19

Shale gas exploration and exploitation construction activities mainly result in risks to biodiversity due to the direct impact on habitat fragmentation and pollutant dispersion. However, these risks are still poorly reported in sustainability reports or investigated in the literature, which may be due to the required time to observe this type of impacts. Another aspect of land use relates to waste management and disposal.

Land use may also be a highly contested issue among stakeholders in highly populated areas. The European Academies Science Advisory Council highlighted that the latest multi-well pads and horizontal drilling techniques reduced building surface areas. These new methods are now commonplace in the industry, even in heavily populated areas such as Pennsylvania, which has a population density similar to most of Europe.

2.4 Requirements from governments and financing institutions

Command-and-control regulations are by far the most commonly used to minimise damage caused by unconventional extraction. As a result, they are most often used by countries where regulators are under-capacitated to police self-regulation, such as developing countries. Specialists, however, stress the importance of flexibility in environmental command-and-control regulations to optimise the environmental benefits of the regulated activities. In addition, command-and-control laws have been criticised for imposing high financial and administrative costs on companies.

In contrast, market-based regulations may impose a lower cost burden on companies and incentivise companies to implement specific regulatory measures. Some command-and-control rules can be executed voluntarily by O&G companies. In this case, companies usually pre-emptive respond to possible new regulations that may be implemented or avoid future surprises due to a sudden increase in standards or to gain competitive advantages. Voluntary code, in contrast, provides incentives but not mandates for pollution control.

Given the long-term nature of the risks that fracking poses to groundwater, operators must provide some form of financial security. This must at least be sufficient for the maintenance and continuous monitoring of wells in the long term and a contingency fund in the event of contamination, in which case the company may be required to compensate landowners financially for their losses. Financial security can be required in addition to any other financial provisioning requirements to ensure safe operations during shale extraction. In addition, the possibility of bankruptcy must be covered by adequate financial assurance, as governments mostly end up with the liabilities of bankrupt companies [12].

Finally, the sustainability transition in finance has primarily consisted of a taxonomic exercise that aims to label old finance under various declinations of sustainability (socially and/or environmentally responsible, green, ethical, etc.) designed to match multiple investors’ preferences. Although the merits of such advances have been somehow acknowledged, the sustainability transition in finance requires sustainable development goals to be embedded in the negotiation. The human and environmental aspects of fracking require a more hands-on engagement with the world of finance.

Even before COVID-19 pandemics, shale operators were facing financial challenges to maintain steady production. However, progressively stringent ESG frameworks and the decline in energy prices have reduced the revenue inflow. The debts are also escalating for some companies due to earlier taken loans. In addition, central banking institutions have shown reluctance to lend to the shale operators amid low economic activity and reputational concerns [13].

2.5 The human dimension

Anthropologists have studied the social and cultural aspects of unconventional gas developments since about 2010. This section reviews the published anthropological record and critically comments about how the topic has been addressed so far. The importance of qualitative anthropological research on the environment and fracking lies in that it can elucidate the human dimensions of contested developments otherwise largely discussed in terms of scientific risk calculations and engineering procedures.

Anthropologists have since published qualitative accounts, initially based on ethnographic fieldwork, especially in the United States and Australia, but now increasingly from places around the world. These accounts have focused on the diverse societal debates and consequences associated with unconventional gas developments and fracking. They have addressed, for example, neoliberal politics and powers of persuasion and community organising in response to fracking. Others examined the diverse social and economic impacts of unconventional gas developments on local communities, the consequences of environmental change and place-related identities, as well as debates about agricultural futures and Indigenous engagements with the gas industry.

Future anthropological research program on water and fracking might address historical diversity within communities, imaginaries and associated water values, the unfolding of epistemological tensions and fractious relationships at different scales, and variously envisioned environmental and economic futures that arise in the context of unconventional gas development. Interdisciplinary research collaboration among anthropologists, hydrogeologists, engineers and economists can assist in addressing these matters in mutually comprehensible ways and of potential value to policymakers.

A more humanistic view of natural resources surrounding fracking projects should also fuel the path of shale operators towards a more sustainable and socially engaged production.

3 Technological Challenges

3.1 The case of Vaca Muerta, Argentina

Argentina is home to the world’s second-largest shale gas prospective resources and fourth-largest shale oil prospective resources. Vaca Muerta is currently the leading commercially producing shale play outside North America.

The Vaca Muerta Formation lies beneath much of the Argentinian Neuquen Basin, which encloses a near-continuous Upper Triassic-Lower Cenozoic succession covering about 100,000 square kilometres. Thermal maturity data and modelling analysis has defined the oil and gas generation zones in Vaca Muerta. The formation comprises the following thermal maturity windows: Dry Gas, Wet Gas, Gas Condensate, Volatile Oil, Peak Oil, Early Oil, and Immature.

fig5

Figure 5. Thermal maturity windows in Vaca Muerta. Source: https://www.researchgate.net/publication/301551124_Source_rock_properties_of_Vaca_Muerta_Formation_Neuquina_Basin_Argentina

The conformation shown above leads to a transition zone (roughly the green zone) located between gas-rich and oil-rich districts; this, together with peak and early oil windows, contains crude oil with high molecular weight gas. Thus, enhanced oil recovery (EOR) is potentially promising in those, and some preliminary studies confirm the potential.

Local experts [14] have found the following parameters to describe auspicing reservoirs for EOR application:

It is also crude rich in associated hydrocarbons (C3, C4, C5+), with an accompanying gas difficult to separate and deliver to commercial specification. These conditions cause extra venting at the tank level, excessive recycling, and a negative impact on carbon footprint due to excess methane (CH4) venting. Moreover, the gas from Vaca Muerta light oil separators has an undesired dew point for pipeline specifications [15].

3.2 Problems and common solutions

Traditional solutions for these issues. Low-temperature separation (LTS) with mechanical refrigeration and reducing the dew point by Joule-Thomson (JT) expansion are common for lower flow rates of feed gas. Even combined approaches of these two can be performed, although recycling currents might turn these technologies impracticable. Even if LPG recovery was required, its storage might cause storage limitations and entangle transport logistics.

Another usual practice in the LNG industry is to use a scrub column or a C2+ recovery unit with a turbo-expander, which is comparatively higher in CAPEX and more challenging to operate. Summing up, all processes, including gas dehydration using mol sieves, heat transfer via plate heat exchangers (PHE), and LPG fractionation, contribute to raising capital expenditures.

Flow assurance is of great importance in the oil and gas industry, where the main aim is to supply and secure the transport of the well stream fluid from the reservoir to processing facilities. A root cause of many complications is paraffin wax, especially in cold fields such as Vaca Muerta. Hot oiling is one of the most popular methods of deposited wax removal in the flow lines and downhole [16]. Hot oil is heated to a temperature beyond the melting point for wax when pumped into the well.

3.3 Innovation through greener solutions

When addressing the most common challenges and limitations of shale reservoirs and their carbon footprint, a group of premises are to be considered. Firstly, one should avoid propane refrigeration. This gas can produce refrigeration at −40°C, which is not adequate for rich gas, such as shale gas, with a higher ethane content; here, a lower refrigerant temperature is required to comply with the pipeline gas-heating value specifications. Secondly, additional pressure or temperature changes needed for further separation to occur should be minimised due to safety concerns and high equipment costs associated with storing pressurised liquids. Thirdly, using recycled currents with high molecular weight is foreseen as a source of electricity for the well pad and an energy efficiency measure [15].

Electrifying well pads has many positive impacts on the environment and operational safety. The benefits of oilfield electrification are cutting GHG emissions, facilitating distributed information and remote control equipment (valves, AIB, manifolds, chemical injectors), accurate heating (electric), simplifying logistics for diesel distribution, compressors running on electricity are more efficient and less noisy, less physical space is required thanks to a more compact layout.

In North America, The USEPA Underground Injection Control (UIC) program governs more than 800,000 injection wells. To implement the UIC program, six classes of underground injection wells are established based on categories of materials injected into the ground by each type. Each class of wells also shares a similar design, construction, injection depth, and operating techniques. Wells within a class are required to meet a set of appropriate performance criteria for preserving underground sources of drinking water [17]. The UIC regulatory program includes the following broad elements: site characterisation, area of review, well construction, well operation, site monitoring, well plugging and post‐injection site care, public participation, and financial responsibility.

Oil and gas wells are conventionally abandoned once such wells are no longer deemed economically viable as production wells or enhanced production wells or have well integrity issues and problems that require closure. This class of wells historically has been more of an afterthought, but all oil and gas production states now have regulations that require the adequate plugging and abandonment of oil and gas wells no longer useful to essentially prevent migration of fluids and gas from migrating upward within or along with the well casing and potentially adversely impacting other formations and freshwater‐ bearing zones and allowing gas to migrate to the surface.

As an example of how state regulations have evolved into specific technical details, California’s plugging regulations require cement plugs to be placed at:

4 Conclusion

The potential impacts of the hydraulic fracturing process are categorised as follows: (i) water resources, (ii) atmospheric emissions, (iii) induced seismicity, (iv) land use, (v) occupational health and safety, and (vi) other impacts (e.g. air quality). The aspects and current consensus covered in the most relevant of these fields are discussed above, derived from previous studies’ conclusions. They are essential for facilitating more informed decisions by policymakers.

Recent studies investigated the impact of contaminated flowback waters on environmental quality, soil ecological health, and human health risk exposure to the surrounding soils of representative shale gas areas in the U.S., China, and Argentina.

Additional research and regulatory efforts are needed considering these potential risks since long-term direct measurements of air pollutants are incredibly scarce. Finally, there is growing recognition of the need to understand public attitudes to energy sources, such as shale gas, and to consider these views in policymaking.

5 References

[1] EPA, U. (2012). Study of the potential impacts of hydraulic fracturing on drinking water resources: progress report. EPA/601/R-12/011.

[2] Beckman, A., Ambulkar, A., Umble, A., Rosso, D., Husband, J., Cleary, J., … & Jeyanayagam, S. (2015). Considerations for accepting fracking wastewater at water resource recovery facilities. Water Environ. Fed.

[3] https://www.nrdc.org/stories/fracking-101#alternatives

[4] Torres, L., Yadav, O. P., & Khan, E. (2016). A review on risk assessment techniques for hydraulic fracturing water and produced water management implemented in onshore unconventional oil and gas production. Science of the Total Environment, 539, 478-493.

[5] Freyman, M. (2014). Hydraulic fracturing & water stress: Water demand by the numbers (p. 85). Boston, MA: Ceres.

[6] https://www.fracfocus.org/

[7] Xia, Y., & Boufadel, M. C. (2010). Environmental impacts of shale gas extraction in China. Adv Resour Environ Econ Res, 212-216.

[8] http://www2.epa.gov/sites/production/files/documents/hf-report20121214.pdf

[9] Heath GA, O’ Donoughue P, Arent DJ, Bazilian M (2014) Harmonisation of initial estimates of shale gas life cycle greenhouse gas emissions for electric power generation. Proc Natl Acad Sci U S A 111:E3167– E3176. doi:10.1073/pnas.1309334111

[10] https://www3.epa.gov/airquality/oilandgas/actions.html

[11] Costa, D., Jesus, J., Branco, D. et al. Extensive review of shale gas environmental impacts from scientific literature (2010–2015). Environ Sci Pollut Res 24, 14579–14594 (2017). https://doi.org/10.1007/s11356-017-8970-0

[12] Esterhuyse, S., Vermeulen, D., & Glazewski, J. (2019). Regulations to protect groundwater resources during unconventional oil and gas extraction using fracking. Wiley Interdisciplinary Reviews: Water. doi:10.1002/wat2.1382

[13] https://www.offshore-technology.com/comment/shale-oil-gas-trends/

[14] Evaluación de la Formación Vaca Muerta como Reservorio No Convencional: Estado Actual y Perspectivas, Manuel “Fantín” 9 de Junio de 2017

[15] https://www.wartsila.com/energy/pages/webinars/reduccion-de-huella-de-carbono-en-og-incrementando-la-rentabilidad

[16] Thota, S. T., & Onyeanuna, C. C. (2016). Mitigation of wax in oil pipelines. Int J Eng Res Rev, 4(4), 39-47.

[17] Surface and Groundwater Risks, Resource Quality Management, and Impacts. (2019). Environmental Considerations Associated with Hydraulic Fracturing Operations, 183–201. doi:10.1002/9781119336129.ch6

1 Introduction

1.1 The nature of environmental mitigation

When we say environmental aspect, we mean an element of an organisation’s activities, products or services that can interact with the environment. When we say environmental impact, this is a planned or known or expected impact upon the environment. When we say environmental risk, this is an unplanned or unexpected event that gives rise to environmental harm, so something accidental. Environmental regulations frequently require offsetting mitigation for negative impacts of extractive activities.

A couple of practical concepts to carry out mitigation measures are BAP and BAT. Best Available Practice (or BAP) applies the most appropriate combination of environmental control measures and strategies. Best Available Techniques (or BAT) is about the best available techniques which are the latest stage of development — so state-of-the-art process or facilities or methods operation — which indicate the practical suitability of a pretty particular measure for limiting discharges, emissions, and waste.

Mitigation can occur on-site or off-site. On-site mitigation entails enhancing environmental attributes at the development site to compensate for ecological harm caused at that site. In many situations, on-site mitigation is not feasible, and the focus transfers to off-site mitigation, in which environmental attributes are improved elsewhere to compensate for ecological harm at the development site. Anticipation and mitigation by energy firms can also help address the issues that can accompany the urbanisation that often occurs around oil and gas developments.

O&G companies can help operationalise the Sustainable Development Goals (SDGs) in their core business practices by integrating them into their corporate systems, policies and processes. Different projects will have disparate impacts on different SDGs. Therefore, identifying the local area’s social, economic and environmental baselines and the potential implications of operations will inform engagement, contribution, and mitigation measures. Other baseline assessments considered in environmental mitigation include human rights, health, lifecycle assessments and landscape-scale plans [1].

1.2 The exploration and production lifecycle

When we refer to upstream, we talk about the exploration and production life cycle, consisting of five phases: survey, exploration, development, production, and decommissioning. Let’s illustrate the different environmental impacts at each stage with an offshore oil & gas example.

In the survey, which is the first phase, engineers try to understand the geology, so where in the seabed do we have a reservoir. To do that, they perform a seismic activity, which means we use vessels equipped with emitters that send waves down to the seabed and then collect back these waves. The data collected will be analysed to draw geological maps, which will later define where there might be geological traps for oil and gas — and eventually drill a well. Of course, this activity is associated with environmental impacts: we have atmospheric emissions from the seismic activity, limited discharges to the sea, the vessel could go into an accident, etc. Yet, the major impact of seismic activity is its impact on mammals because it generates noise and generates waves, which deters mammals.

The second phase would be exploration. There is already a geological map at this stage, and we do know where we might expect oil and gas. So, a rig or a module, a mobile offshore drilling unit, is placed above the well location and drilling is started. This activity is also associated with impacts: atmospheric emissions, which are basically from the rig itself because it has combustion, generators on board, and also from helicopters that are used to transport personnel from onshore into the rig as well as from support vessels which are moving continuously back and forth between the offshore and the onshore. If we move deeper or into more complicated geology, oil-based mud is required and consequently, drilling cuttings become hazardous materials.

If we do have a discovery, then we move into development and production. Here, oil and gas are taken up into the rig and then processed for use. This phase is also associated with multiple environmental impacts: from emissions to discharges, going through accidents and routine impacts. In the case of accidents, we are talking about fire or explosion, an oil spill, a blowout (uncontrolled release of crude oil or natural gas from a well), a vessel incident, a helicopter crash on the way on the route between the rig and the onshore, among others. We will go over decommissioning and closure issues later in this document.

figure 1

Figure 1. Petrobras P-36 Sinking was the biggest oil Rig sinking in the oilfield industry. Source: https://www.drillingformulas.com/petrobras-p-36-sinking-the-biggest-oil-rig-sinking-in-the-oilfield-industry/

Besides offshore O&G, there are also some specific issues relating to hydraulic fracturing. For example, modelling earthquake rate changes and the analysis of earthquake seismicity data by the USGS [2, 3] suggest that the significant increase in earth movements over the past few years is likely triggered by waste liquids, such as flowback from hydraulic fracturing operations and coproduced fluids, being injected under high pressure into deep geologic formations.

2 The Phases Prior to Environmental Mitigation

2.1 Assessing impact significance

Several methods and processes support the prioritisation of environmental impacts and risks when establishing mitigation activities. The best recognised of these methods is to use matrices for whittling down the long lists of ecological impacts and threats to a shorter list of those requiring control. Figure 2 provides an interpretive matrix that enables consideration of the sensitivity receptors against the magnitude of change; it can be used before prioritising the bulk of attention to receptor interactions that fall within the bottom right to the matrix.

figure 2

Figure 2. Matrix for significance assessment. Source: Morlais Project Environmental Statement Chapter 24: Seascape, Landscape and Visual Impact Assessment Volume III

When assessing and prioritising environmental impacts and risks, the criteria used to do this should be clear, unambiguous, robust, and proportionate to the project. This is illustrated by the weighting that should be applied to consider the severity of consequences.

The potential impacts of each proposed activity and the alternatives can also be assessed using the impact significance classification system [4] as follows:

2.2 Environmental appraisal

The environmental mitigation program for an asset must include detail and supporting information on the potential environmental impacts of the proposed remediation and mitigation activities themselves; this is based upon a starting presumption that, wherever possible, all resources will be reused, recycled, or disposed of through BAP.

The environmental appraisal must be documented in a report providing details of any mitigation measures or remedial works required to manage or address the significant environmental impacts or risks. The following steps outline the staging process that can be followed to live an environment appraisal for mitigation in oil and gas.

The environmental appraisal process can be broken down into four key steps. The first step is defining mitigation activities or parameters and understanding the nature and extent of proposed actions. The second is to identify potential mitigation activities and environmental receptor interactions. The third is to characterise the baseline environment. This is based on understanding the receiving environment and considering the relevant environmental aspects, impacts and risks that pose and are opposed by the mitigation program. Step four is to assess the significance of the environmental interactions, factors, effects, and risks; at this stage, you will also seek to define mitigation measures according to BAP and BAT. Once all this has been done, it is documented with an environmental assessment report.

2.3 Stakeholders

Part of the environmental mitigation activities require operators to develop and manage a public consultation process — this should be proportionate to the level of interest from stakeholders. While stakeholder engagement and consultation is a topic on its own, it is worth highlight the complexity of stakeholder interactions associated with remediation, decommissioning, and closure programs; this is because a large number of stakeholders may have relevant environmental concerns, constraints, or information.

figure 3

Figure 3. Typical Stakeholders for Oil Spill Response. Source: https://doi.org/10.7901/2169-3358-2014.1.1172

It is also worth noting that consulting and engaging with stakeholders provides an optional process and informed decision-making during environmental mitigation. During the planning process, operators will consult with government departments, agencies and non-government agencies; this may include, but is not restricted to, organisations with some environmental concerns or constraints upon the program — some organisations may even have information that could support the environmental appraisal. The stakeholder engagement process can take up to 12 months, so it is recommended that the stakeholder consultation and communication process is first well understood and considered, and then it commences at a very early stage.

3 Summary of Resources and Mitigation Measures

A variety of resources and issues are described below with suggested mitigation measures [5].

3.1 Air resources

Impact

This includes exposure to noise, odours, volatile chemicals, silica dust from proppants, and construction dust. Methane and other GHG released as fugitive emissions from oil and gas wells and fracking operations are seen by some researchers as a concern [6]. Besides fugitive emissions, numerous VOCs and semivolatile organic compounds (SVOCs) are present at drilling and production facilities related to operational chemicals such as fuels, lubricants, cleaners, drilling additives, or fracking chemical additives. Old or abandoned oil, gas, and water wells may not have proper construction and lack adequate cement seals. Consequently, these historic wells may act as conduits for methane emissions from the subsurface into the atmosphere. Flaring of unwanted natural gas contributes to GHG. On a global scale, the use of fossil fuels produces GHG.

Mitigation measures

Mitigation measures of air resource impacts focus on:

3.2 Ecological resources

Impact

Wildlife impacts, habitat fragmentation, and invasive, nonnative species are the issues included in ecological resources. The unconventional resource assessment and extraction require clearing substantial amounts of land and grading for drilling/production pads and pipelines and developing new or improving access roads. For remote production pads, new roads to nearby towns and supply centres will also be constructed. The additional traffic and air pollution from trucks, barges, and trains also disrupt wildlife in the area. These changes also can impact landscapes as well as the quality of life.

Mitigation measures

Mitigation measures of ecological resources impacts comprise:

3.3 Cultural and paleontological resources

Impact

Previously inaccessible historical artefacts, petroglyphs, and fossils may be collected or vandalised by persons using newly constructed access roads. Disturbance of the surface while building drilling/production pads and pipeline trenches can damage buried cultural and paleontological resources. Excess air pollutants from vehicles, pumps, engines, and vibrations caused by activities can damage fragile rock art and some historical artefacts.

figure 4

Figure 4. The remains of a Titanousaur (circa 98 million years ago), one of the largest dinosaur species ever, were found in Sierra Chata oil and gas field by Pampa Energía Oil Company. Source: NEUQUEN: Conocé el hallazgo que puede batir un récord

Mitigation measures

To preserve the value of cultural and paleontological heritage and scientific evidence, here are some practical actions to implement within oil and gas developments:

3.4 Water quality

Impact

Spillage of hazardous compounds or leakage of produced liquids or gases produced by brines and other chemicals can impact surface or groundwater quality. Water quality of surface and shallow groundwater can be degraded by contamination by toxic compounds, including shallow aquifers with spilt liquid compounds from the surface. Leakage can occur in lined pits, from above or underground storage tanks and tanker trucks, oil tanker ships or barges, tank railcars, pipelines, etc.

Besides the possibility of leaking fluids from poorly contained or spilt sources on the surface, hydrocarbons, metals, NORM, brines, and drilling or fracking wastes could also enter surface waters or shallow water supplies should connections between the contaminant sources exist to allow entry.

Mitigation measures

Measures for mitigating impacts on water quality include:

3.5 Landscapes, scenic views, night skies

Impact

Not only are the obvious areas near drilling pads, production facilities, and pipelines affected, but some environments and communities that are located hundreds or even thousands of miles away from the nearest hydraulic fracturing operations are also potentially impacted. Areas with mines for fracking- and drilling‐related resources; mines for proppant sands or bentonite used in drilling muds; and resource processing plants, transportation hubs, refineries processing the crude oils, natural gas processing plants, bulk storage terminals and ports, and disposal facilities. Environmental concerns about oil and gas fields are amplified in pristine, highly visible sensitive areas such as wetland areas.

Flaring unusable methane from the Bakken oil production in North Dakota disrupts the serenity of the night skies (Figure 5). Due to various economic realities and demands on operators in many basins, including debt obligations, drilling and production requirements to maintain the lease, legal requirements, investor demands for production cash flow, and rapid crude oil production are the norms.

Natural gas reserves in the right location at the right time are a valuable commodity. The crude oil is produced and sold immediately to address the economic realities listed above. Since there are no pipelines to carry the methane to market, the coproduced methane is flared as a waste product, increasing GHG and lighting the night sky in a brightness seen from space. Scenic views and natural soundscapes are likewise impacted by drilling and production activities.

figurer 5

Figure 5. North America at night, natural gas flares from the Bakken Formation in Williston Basin in North Dakota can be seen from space. Illustration by NPR/NASA. Source: https://www.npr.org/sections/krulwich/2013/01/16/169511949/a-mysterious-patch-of-light-shows-up-in-the-north-dakota-dark

Mitigation measures

3.6 Seismicity Issues

Impact

Injection of large volumes of fluids during hydraulic fracturing operations occurs; however, the impacts are uncertain. The injection of waste fluids from oil and gas operations into large-diameter injection class II injection wells can cause low‐magnitude tremors. By 2014, Oklahoma had 528 magnitude 3.0 and greater earthquakes, 300 times the number of earthquakes recorded in 2008 [2].

Mitigation measures

This is an exploratory field in the oil and gas industry; however, seismicity issues impacts are generally managed by:

4 Case-Specific Measures

4.1 Response to oil spills

Oil spill response is a process that has evolved to address lessons learned and ensure systemic coordination resulting in efficient cleanup operations [7]. For example, in the U.S., the federal requirements to have adequate equipment, trained personnel, and oil spill response plans that are exercised regularly ensures everyone has a chance to practice their roles and responsibilities.

The grounding and release of oil from the Exxon Valdez in 1989, the Deepwater Horizon event in 2010 and other major events caused a major revamping in the pollution prevention for offshore drilling and major changes in the requirements to conduct spill exercises. In general, laws give the federal government enforcement authority over the responsible parties and have planning and preparedness components under the Oil Pollution Act of 1990.

The term responsible party refers to the owner or operator of a vessel or facility from which oil is discharged. The regulatory role that the accountable party performs during the oil spill is a major distinction between a Stafford Act response to a natural disaster and an oil spill exercise or event. The oil spill response community operates within a more extensive preparedness and response system made up of government public and private stakeholders. The responsible party or the federal government has the ultimate responsibility for containing mitigating and cleaning up the spill.

An oil spill response can be complicated and evolve. The requirements to have oil spill response plans and exercises are critical to ensuring that everyone knows and practices their roles and responsibilities. These exercises do not just happen, and careful thought goes into planning the training to incorporate recent lessons learned, conducting the exercise to practice skills, and evaluating the activity to enhance response capabilities continually.

4.2 Offshore decommissioning

Legal background

Let’s start by providing a little bit of context around the policy and regulatory framework governing environmental appraisal for decommissioning offshore assets. Most nations are signatory to several international conventions that govern activities in the marine environment. Some of these place obligations which impact offshore oil and gas and, more specifically, upon the decommissioning of offshore assets.

To put this into a bit more context, it happens that states’ international obligations and policies on the decommissioning of offshore installations have common origins in the United Nations Convention on the Law of the Sea 1982. This includes a requirement that any installations and all abandoned or disused structures should be removed to ensure safety and navigation; it also consists of a need to remove out of the assets should have due regard to fishing and the protection of the marine environment.

In 1992 the Convention on the Protection of the Marine Environment in the Northeast Atlantic (the OSPAR Convention) was agreed. The most significant obligations for decommissioning offshore oil and gas operations a set out in OSPAR decision 98-3, which requires that the topside of all installations must be returned to shore and that all steel installations with jacket weight less than 10,000 tonnes (in air) must be removed entirely for reuse, recycling or final disposal on land. The decision recognises that it might be challenging to remove the footings of oversized steel jackets weighing more than 10,000 tons; similarly, it acknowledges difficulties with removing concrete installations.

Principles and stages

So, at this point, it is appropriate to ask how do these obligations translate into a requirement for environmental assessment. But, first, let’s discover some of the practicalities and approaches to undertaking environmental appraisal for offshore decommissioning.

The vast majority of policies and practices on decommissioning are underpinned by two fundamental principles: a precautionary principle that decommissioning should aim to achieve a clear seabed whilst acknowledging that this will not always be achievable, and a polluter pays principle [8]. The latter sets out an expectation; organisations who have benefited from the exploitation or production of hybrid hydrocarbons in the continental shelf will bear responsibility for decommissioning and any cleanup of this required.

These set the scene to characterise and understand the environmental impacts and risks of an offshore decommissioning process and the associated decommissioning program. Practically, there are five key stages in the decommissioning process; these start before cessations of production and continue by early identification of options to detailed assessment and drafting of the decommissioning program submitted to base.

At stage two of this process, the decommissioning program is submitted to base for consultation; this goes to operate and other interested parties for consideration. Then, at stage three, there is a formal submission for the decommissioning program in the hope of approval. The chosen decommissioning options, set out and disposed of in the decommissioning plan program, must be supported by an environmental appraisal at both stages; this should assess the impact of the project on the environment and include information on the energy balance and emissions from the decommissioning options considered. The appraisal also needs to consider the environmental impact of any explosives likely deployed during decommissioning activity.

4.3 Petroleum lubricants

This section reviews effective environmental impact mitigation for petroleum-based lubricants to reduce their negative persistence during usage and end-of-life disposal. It is time to explore initiatives that may enhance the ecological effectiveness of lubricating oils from the composition design perspective. Reference is made to mineral base oil processing, blending, application and disposal of petroleum lubricants, and current best practices that minimise or eliminate adverse environmental impact throughout the product’s life cycle.

Unlike petroleum fuel which is burnt and emitted as gaseous by-products to the environment, for which exhaust-system catalytic converters have since been fitted to vehicles to release less harmful gases, lubricants are typically dumped as liquid waste. This poses severe environmental damage in the form of soil degradation, water contamination and interference with ecosystem balance. Lubricants, both used and fresh, can cause considerable damage to the environment mainly due to their high potential for severe water pollution. In addition, the additives contained in these products can be toxic to flora and fauna. In recycled fluids, the oxidation products can be highly toxic as well. Persistence in the medium largely depends upon the base fluid; however, if very toxic additives are used, they cause this negative persistence.

The feasibility of eco-friendly bio-lubricants for total loss applications is under development given thermal stability challenges and the use of nano solid lubricants to replace fluids and grease for severe space operations. Reduction of emissions resulting from sulfur in additives is one way to save the environment, among other efforts such as recycling of used oil and proper oil handling to minimise spills and leakages into the biosphere. The three pillars guiding engine lubricant technology advancement towards environmental impact mitigation are the need to achieve significant fuel economy, appreciably extend the oil drainage period and minimise gas emissions into the environment through sulfur-less additive packages.

Recently, there has been a resurgence of eco-friendly lubricants due to increased environmental efforts to reduce the use of petroleum-based lubricants. Still, mineral oil remains to be the largest constituent and the foundation of most lubricants. Compared to petroleum-based lubricants, bio-based lubricants have a higher lubricity, lower volatility, higher shear stability, higher viscosity index, higher load-carrying capacity, and superior detergency and dispersancy; therefore, they are excellent mitigation alternatives to petroleum-based oils.

figure 6

Figure 6. Outline of the environmental impacts of regeneration versus the primary production. Source: https://www.springer.com/gp/book/9783319313573

Discharge into sewage, recycling, burning, and landfill and discharge into sewage and waterways are some of the disposal methods observed for used lubricant. There are strict regulations in most countries regarding disposal in landfills and discharge into the water as even a meagre amount of lubricant can contaminate a massive amount of water. Most regulations permit a threshold level of lubricant that could be present in waste streams. Companies spend hundreds of millions of dollars annually in treating their waste waters to get to acceptable levels.

It was established that regeneration brings about meaningful net relief concerning six environmental performance indicators, namely: resource depletion, greenhouse effect, acidification, nitrification, carcinogenic risk potential and fine particle emissions. Figure 6 illustrates the ratio between the average impact of regeneration concerning the indicators mentioned earlier and the equivalent burden that would result from primary production. It demonstrates that regeneration has a considerably lower environmental obligation than the processes it substitutes. It can be seen that the lower the impact, the better for the environment.

Concerning the other recovery options where waste oils are used as a heavy or light fuel, regeneration outperforms incineration from an ecological perspective about the six environmental performance indicators. Furthermore, with the evolution towards increasing synthetic base fluids in lubricants, the omitted ecological burden resulting from regeneration substituting primary production will increase in the future [9].

5 References

[1] https://www.undp.org/publications/mapping-oil-and-gas-industry-sdgs-atlas

[2] Llenos, A.L. and Michael, A.J. (2013). Modelling earthquake rate changes in Oklahoma and Arkansas: possible signatures of induced seismicity. Bulletin of the Seismological Society of America 103: 2850–2861.;

[3] Does fracking cause earthquakes?

[4] California Department of Conservation (CDOC) (2015). Environmental impact report analysis of oil and gas well stimulation treatments in California, State Clearinghouse No. 2013112046, Revised Draft Environmental Impact Report, June, Sacramento, CA; Vol III of III, Chapter 11 through Chapter 19, p. 1392.

[5] Overview of Impacts from Tight Oil and Shale Gas Resource Development. (2019). Environmental Considerations Associated with Hydraulic Fracturing Operations, 137–181. doi:10.1002/9781119336129.ch5

[6] Howarth, R.W., Santoro, R., and Ingraffea, A. (2011). Methane and the greenhouse gas footprint of natural gas from shale formations. Climatic Change Letters 106: 679–690.

[7] Overview of Oil Spill Exercise & Response

[8] The Environmental Aspects of Offshore Decommissioning

[9] Madanhire, I., & Mbohwa, C. (2016). Mitigating environmental impact of petroleum lubricants (pp. 17-34). Berlin, Germany:: Springer.

1 Introduction

Industrialization and urbanization have led to a huge demand for energy and water in the world. The resources such as oil, gas, power, and water that are essential assets need to be distributed across the country. The pipelines are one of the most economical means of carrying petroleum products for thousands of kilometres across the country from production fields to the refineries and from refineries to the distribution system.  These pipelines are spread over large geographical areas across the country and installed overground, underground, or underwater. They form an integral part of any country’s energy economy. Similarly, power line carries electric energy from power stations to distribution centres and then to the consumers across the country.  Monitoring and protecting the health of these distributed infrastructure facilities of national importance is necessary. It is being done using Supervisory Control and Data Acquisition (SCADA) system for the last many decades. The SCADA systems have also been used to monitor and control mining, agriculture, and other utilities. Over a period, the technology has improved, and the SCADA system has been continuously upgraded using the latest hardware and software techniques apart from the sensors. Wireless Sensor Network (WSN), the basic element in the Internet of Things for collecting environmental data, is at the forefront of any technology upgrade in the industry. As per industry reports, the use of WSN can lead to infrastructure cost reduction by 80%, and consequently, their use is growing in the oil & gas sector, with revenue are likely to be $2.2 Billion by 2023.

This article explores wireless sensor networks for SCADA applications in the utility sector, especially pipelines.

2 SCADA System

The initial phase of SCADA system implementation used proprietary technologies, including mainframe computers, remote terminal units (RTU)s, and software for monitoring and controlling systems. The RTU collected data from sensors in the field and sent it to the master control centre over available telecommunication facilities to process and initiate controls. The systems were upgraded with the advances in computer systems and industrial control systems. The high-end workstation with graphical user interface and redundant computer network upgraded the SCADA system. The use of PLC used in process control applications for the past many years for data collection instead of RTUs further enhanced the SCADA system at the field level and introduced a distributed SCADA system. The RTU’s that used to be just data collection or control passing devices were replaced by PLCs, which could process the data at the source and take necessary control action at the local level without involving the master station. TCP/IP protocol and WAN protocols in communication with remote units brought some standardization in SCADA system communication protocols. SCADA applications are limited to industrial units and are traditionally used by Oil & Gas industry, power sector, railways, mining, and other utilities. Of late, SCADA systems have been integrated with the corporate network in a limited manner for management information. The integration with the corporate network allowed management direct access to key parameters of the process and enabled them to take quick and informed decisions.

3 Wireless Sensor Network

Wireless Sensor Network (WSN) consists of many small batteries powered sensing devices placed at strategic locations on the system to the monitored.  Each sensing device is capable of monitoring and/or displaying the information or actuating the controls.  The sensors may consist of measurement of temperature, pressure, vibration, flow, etc. The data collected by the sensor is periodically sent to the main computer system using radios embedded in the sensors

The WSN is a self-configured and infrastructure-less wireless network for monitoring physical environmental conditions in large dispersed areas. The sensors can organize themselves after deployment and use multi-hop communication for sending information collected. The environmental condition may include temperature, vibration, sound, pressure, pollutants, motion, etc., as per requirement. WSN acts cooperatively, and the data collected by the sensors are passed on to the main location called sink or base station in WSN terminology. The sink acts as an interface between users and the sensor. At the sink, these are observed and further analyzed.  The data from the sink can be obtained by injecting queries and observing results. A WSN may consist of hundreds and thousands of nodes or sensors dispersed over a large area.

A typical WSN node consists of a sensor module, a microcontroller, a radio unit, and a power supply system. The sensors and actuators are usually based on a micro-electromechanical system (MEMS). The microcontroller takes care of data acquisition, scheduling, communication protocols, data packets for transmission, battery/power supply status, and other management functions. The radio part consists of a short-range transceiver. To keep power consumption low, the sensors have minimal resources regarding storage capacity, computing power, and communication bandwidth.

power supply

Figure 1 Block diagram of wireless sensor node

After recent advances in technologies, the availability of reliable, miniaturized sensors with embedded microcontrollers and low bandwidth radios on a single chip have made them usable for large field deployment. These sensors require low power and have many power conservation features. The deployment and maintenance cost of the modern sensor is low enough for these to be deployed in large numbers with battery lasting for a couple of years. These sensors are being used in a wide variety of applications, including industrial applications, agriculture, large area environmental monitoring such as forest and agricultural fields, healthcare, monitoring civil structures and many more.

However, due to their low design complexity, limited storage, low bandwidth, and low power, these have limitations in their use. It requires a delicate balance between their communication and processing capabilities. Scientists are looking for unconventional paradigms for suitable protocol and processing design to make these more useful.

The WSN uses short-range communications standards such as IEEE 802.15.4, Zigbee, Bluetooth, and Ultra-wide Band (UWB) for communicating in the network and to the base or sink node.

WSN is one of the critical components of IoT systems as they have low power and allow precise placement. The use of  WSN in the oil & gas sector is in areas such as process control, asset locating and tracking, asset monitoring, safety, and environment. The WSN sensor can be deployed without shutting down the system, such as for rotating equipment monitoring.  For example, ABB WiMon provides a complete solution for rotating equipment vibration monitoring using WSN and operates at Gudrun oil and gas field located in the North Sea.

The WSN in a mesh network can provide redundancy and high availability due to alternate communication paths in the network.

4 WSN for Pipeline/power line Applications

The traditional SCADA system uses cables connected to the PLC or RTU using cables, and power to these are also supplied using cables. These sensors, once installed, usually are never changed unless these go bad but recalibrated as per their schedule. On the other hand, the WSN sensor can be placed in the field without cumbersome cabling requirements. These can also be powered by solar panels or power available at the facility in a small setup.  However, for remote locations with limited power availability, they can be powered using batteries. The sensor output can be aggregated using the base station and then transferred to the SCADA master station over normal communication links. WSN sensors can reduce the cost of installation, reduce the maintenance required, and make the system flexible. The WSN sensor has no issues of cable cut due to wild animal damage, physical wear, corrosion, etc. These sensors can be replaced quickly in case of problems without any cumbersome procedure required in the case of wired sensors. The WSN sensor can be easily relocated, and new sensors can be quickly installed without bothering about cable trays and cable installation issues.

Mexican state-owned PEMEX used 1450 wireless sensors for monitoring wellhead pressure and temperature of scattered onshore oil fields along with long-range Ethernet modems for getting information in their control room.

BP at their production centre in Geel, Belgium, used smart wireless technology from St. Louis-based Emerson Process Management for monitoring leaks of xylene or benzene from the large plant. The system used Pentair (Tyco)- Fast Fuel sensors and Emerson’s Rosemount 702 wireless discrete transmitters to get information quickly to the control room. It saved them 50% cost that they would have incurred using wired systems.

The use of a sensor for monitoring water pipeline by allowing nodes to flow with water and then get attached to the pipe has been investigated. The advantage is automatic deployment, easy configuration, and removal of nodes when they go faulty, or their battery gets depleted by detaching them and collecting at the end. A field trial of a pipeline monitoring system called PIPENET was done in collaboration with Boston Water and Sewer Commission (BWSC). The system used to pressure, level, vibration, temperature monitoring of the pipeline using Intel Mote Sensor nodes and platform. The system provides valuable insight into the deployment issues and solutions.

International Oil and Gas Companies (IOCs) have deployed thousands of WSN nodes in oil and gas installations in the Nigeria Niger Delta region. The installation covered included oil rigs, pipelines, oil wells, and flow stations. The WSN sensors used were battery operated and had a bidirectional communication range of 4-5 miles using ZigBee/IEEE 802.15.4 based radios.

The deployment of WSN in a pipeline or power line network can be using infrastructure network mode with a back-end network being used for data transmission from the base node to the central station. The deployment model for pipeline network and utility monitoring will be deterministic rather than ad hoc. The sensor needs to be placed at fixed locations for monitoring the system. The power supply for base station nodes is not a major issue for this sector as the power available for cathodic protection of pipeline can be used. The normal communication back end such as fibre optic system or satellite or Cellular system can get all the data to master control room.

5 Challenges in using WSN for industrial applications

The WSN system is not without challenges in implementation. The challenges include using power efficient management, efficient protocols, network security, and quality of radio links. This section deals with challenges specific to the linear pipeline network.

5.1 Security in WSN

The resource limitations of WSN nodes limit the implementation of security protocols, leaving them vulnerable to attacks with implications on privacy, safety, and availability. Cisco has come out with a unique set of security devices and software for the oil & gas industry.

The wireless nature of WSN makes it prone to attacks similar to other wireless networks apart from vulnerabilities in wired networks. The broadcast nature of WSN allows anyone with proper equipment to eavesdrop on the network. The security of WSN is different from other wireless networks due to limitations of the sensor’s computational capacity, memory, battery power, random deployment, etc. The sensors can be physically removed or relocated, and their failures may not be noticed.

Some specific attacks and their mitigation against sensor networks are given below:

Denial of Service (DoS) can be launched simply by making the node exhaust their limited resources, making them unavailable for any work or at the physical layer by jamming the signal or at the link layer by creating collisions or at the network layer using misdirection, block holes and at transport layer using desynchronization and malicious flooding. The DoS due to jamming can be prevented to a certain extent using the spread spectrum technique for transmission and region mapping. The use of authentication and encryption can remove DoS attacks due to desynchronization and other threats.

The Wormhole attack: In this attack, the attacker records the packet at one place and then sends it to the network from another location. The nodes receiving the message tries to send it to their neighbours, and the neighbours try to send it to the originator whose location is camouflaged, and the message keeps on moving in the network. The wormhole attacks can be prevented by using a proactive routing protocol such as DAWWSEN.

The Sybil attack: In this attack, the node sends incorrect information such as signal strength, nodes position about itself, or making up a nonexistent node to other nodes. This attack can be prevented by using proper encryption and authentication techniques. The identity certificates can be used to prevent Sybil attacks.

Black/Sinkhole attacks: In this attack, a node tries to attract all the traffic towards itself by making it attractive for routing the information. A node with high power transmitter can act as a black hole node as it will provide a good quality route for other sensors. The use of geographic routing protocols can limit these attacks by using localized interactions without involving the base station.

Passive Information Gathering: The attacker with a good quality receiver can eavesdrop on network traffic and do traffic analysis to find the required information. The attacker can also insert its node in the network to misdirect the packets or attract the packets. The passive attacks can be prevented using proper encryption and authentication techniques.

Selective Forwarding: The attacker can use a rogue node to selectively drop few selected packets to confuse the network or refuse to forward the packets. The selective forwarding attacks can be prevented by using multiple routing techniques.

Hello flood attacks: The malicious node sends Hello packets using high power, making itself a parent node so that most messages are sent to it, causing a delay in the network. The Hello flood attacks can be prevented by checking the bidirectional link so that all nodes can reach the parent’s node in just single-hop.

5.2 Energy Management for Pipeline Network

The pipeline network is a linear network where all the nodes are located along the pipeline. Since nodes have a small battery, replacing the batteries or recharging them is an arduous task and requires efficient energy management.  This requires the use of energy-efficient protocols that need minimal communication effort. The protocol needs to work on activation of nodes transmission based on a minimum energy principle so that the life of batteries can be enhanced and minimize the overall deployment cost.

5.3 Routing Challenges

Routing in a linear network is a big challenge in the face of strict energy consumption requirements. Nodes in this scenario have to transfer data from an adjacent node as well. However, no route discovery is required as the route is already known. The protocol needs to use special schemes to overcome node failures and reduce power consumption.

5.4 Localization

Some applications require that the WSN nodes are aware of their physical location in relative or absolute terms. Two approaches can be used for localization. One is the direct approach, where a system such as GPS is used to provide location information. The other is the indirect approach, where the relative position to a fixed location allows estimation of location.

6 Conclusion

The SCADA system is being continuously upgraded with up-gradation in technology. The wireless sensor network is one such technology that is being embraced for the up-gradation of monitoring and control systems of oil & gas, power, agricultural, water, and other utilities. The cost reduction of up to 80% by using WSN nodes instead of the traditional wired sensor has prompted the utility sector to embrace this technology. The technology can be used by pipeline by replacing wired sensors in the field with WSN nodes. With necessary security measures, including encryption, safety protocols, and authentication, these can replace wired sensors to provide quick installation, easy configuration, and maintenance, as well as quick up-gradation when required. Thus, the use of WSN along with the traditional SCADA system can be very beneficial for the industry in saving deployment and maintenance costs.