Tank gauging plays an important role in the smooth functioning of the Petroleum Supply Chain. Some gaseous petroleum products like LNG and LPG (despite being part of the gas supply chain) are also measured by tank gauging while in the liquid phase at the time of custody transfer or fiscal metering.
Industrial storage tanks usually contain large volumes of liquid product with significant fiscal value – the larger the tank larger is the financial impact of any incorrect operations. Tank gauging is critically important for measuring liquids in large storage tanks. The ultimate objective is to accurately determine the value of volume and mass of the product in the tanks. The oil and gas industry generally uses static volumetric assessments of the tank content. However, mass measurements are also implemented in China.
Tank gauging involves liquid level, temperature and pressure measurements. Since liquids undergo volume changes, depending on individual thermal expansion coefficient, there is an additional requirement for proper volume compensation during calculations of volumes at varying temperature conditions. Often, more significantly, for high vertical tanks and pressurised tanks, pressure measurement of the liquid head is important and included in calculating the pressure correction factor. This, in turn, provides an accurate assessment of the average observed density for converting volume to mass.
In addition, dimensional correction factors for variations in tank structural volume under changing operating parameters are applied to maximise liquid product quantity measurement accuracy. Tank gauging scope varies and is dependent on 1) type of tank, 2) type of liquid, and 3) the purpose storage tank is used for.
Tank gauging configurations vary with changes in basic designs of storage tanks that usually come as:
Tank gauging configurations vary with changes in products contained in storage tanks that include:
Tank gauging configurations vary depending upon the usage and purpose of information from a tank gauging system. The most common are:
The traditional tank gauging technique is hand gauging which can only be performed on atmospheric tanks. A specially designed metallic measurement tape measures ullage or innate (liquid level). The ullage is the distance from the reference point of the tank down to the liquid surface. The tank level is calculated by taking the reference height minus the measured ullage.
Tank gauging is swiftly moving towards automatic tank gauging systems. These are not just instruments on the tank. Rather, they combine field instrumentation, data acquisition, data processing, data communication, data storage, and retrieval. Automatic tank gauging systems are based on reliable data communication between control room servers and field instrumentation over large field bus networks, often wired and wireless. When buying and selling large volumes of liquids, automatic tank gauging systems serve as the main input for establishing correct invoicing and taxation. Certified tank gauging systems can provide more accurate transfer assessments than dynamic metering (LACT or ACT Systems) when performing large transfers from a tanker ship to a shore tank.
Float gauges, servo gauges and radar gauges are most commonly used in automatic tank gauging systems. As part of automatic tank gauging systems, all these gauges are configured to determine accurate values of ullage, innate, and water cut – where required. The transmitters attached to the tank gauge send the tank level values through signal cables (or in the form of radio signals) to the control room. Among the various tank gauges in today’s industry, radar level gauges are usually considered better because they have no moving parts and require no regular maintenance. However, proper use of technology is important while selecting automatic tank gauging systems based on radar gauges. Another characteristic associated with radar devices is their ability to carry out tank fluid measurement in dry mode – they do not require direct contact with the liquid. This unique feature makes it possible to use a radar gauge on various liquids such as corrosive chemicals, heated heavy asphalt, cryogenic liquefied gases like Liquefied Natural Gas (LNG), liquid Oxygen, Liquid Nitrogen, etc. etc.
Radar tank gauges are commonly referred to as microwaves – ultrasound and capacitance level sensors have faded with time due to the effectiveness and accuracy of microwave-based radar gauges. Their initial applications were for automatic tank gauging of marine petroleum tankers but were further developed to fit onshore storage tanks.
For high-performance requirements of custody transfer accuracy in tank gauging applications, the Frequency Modulated Continuous Wave (FMCW), also referred to as “Synthesized Pulse”, signal processing method is used in radar gauges. The FMCW method sometimes goes under the. FMCW can deliver an instrument-level gauging accuracy better than a millimetre over a 50+ meter range. The latest design has been miniaturised to small enclosures. The power requirements are reduced so that radar tank gauges can be made intrinsically safe and require only a 2-wire bus for power and communication.
FMCW technology makes a radar tank gauge accurate, but this is not enough on its own. Precision radar gauges must also have specially designed microwave antennas to deliver instrument accuracy and installed accuracy required by custody transfer standards. One important property of radar antennas is that they should be designed to drip off any condensation quickly. Therefore, antennas inside tanks require sloping surfaces to avoid the accumulation of condensate liquids. To understand this application, the reader is referred to American Petroleum Institute Standard (API MPMS ch. 3.1B, ed. 1) related to antenna design with no horizontal surfaces.
Several international standards are relevant for tank gauging. The main purpose of these standards is to serve as guidelines for both users and manufacturers of tank gauging equipment. The members of the working groups behind the development of these documents are, in most cases, experienced users from the petroleum industry or manufacturers with large tank gauging knowledge. The present trend is to avoid technology-specific standards as much as possible and specify the requirements on equipment for a certain application, thus leaving the door open for any technology to confirm if it can be proved that it fulfils the requirements.
However, to prove compliance to a standard is not always easy since there must be an independent authority/body available with the knowledge and resources to test a tank gauging system. ISO (International Organization for Standardization) and API (American Petroleum Institute) are responsible for the most important standards within tank gauging but do not have their test organisation and are not organised as typical test institutes.
National metrological authorities in a country with this expertise are required with legal requirements for tank gauging equipment. There should also be a department within a metrological organisation that handles tank gauging equipment’s legal aspects. Depending on how custody transfer based on tank gauging equipment has been implemented in their country, they have (to a varying degree) the necessary experience, skills and resources. Therefore, it often works as a step-process with the following sequence:
Fortunately, the national institutes that perform testing cooperate within OIML (International Organization of Legal Metrology). Several test procedures are defined in this organisation, and there is a special procedure defined for tank gauging equipment called OIML R 85 (Recommendation 85).
A tank gauging system that has been tested by an accredited OIML R 85 institute in one country may not need to repeat the same test in another (exceptions occur if the evidence is lacking that the R 85 procedure has been duly followed as intended).
The API standards provide useful experience-based facts and solutions to daily tank gauging problems by summarising know-how from practical investigations performed by research departments major IOCs. Some important API standards in MPMS related to tank gauging are listed below:
Tank gauging system accuracy is fundamentally dependent on accurate input of the tank’s dimensional values into the data processing system at system commissioning. Tanks undergo dimensional variations due to maintenance operations, accidents, or upgrades. In such instances, tanks must be re-calibrated, and new dimensional values are ascertained for input to the automatic tank gauging system.
When variations occur due to any of the activities above, storage tanks require verification of Dimensional Measurements and generation of Tank Capacity Tables (also called Strapping Table, Calibration Table, Tank Chart, Tank Calibration Chart, Tank Gauge Chart, Gauge Table, Dip Charts). This is required to maintain the accuracy of conversion of liquid level measurement in the tank to more meaningful volume or mass values. As per standards, physical calibration requirement or “Wet” calibration is required to meet final product metering accuracy requirements – wet calibration is the physical dimensional measurement and recording of tank sizes after its complete installation at site. Tank calibration is performed independently of the actual tank gauging system components to minimise intrinsic error. Following are the recommended tank calibration methods:
Crude refineries are sensitive industrial facilities where millions of crude oil are refined to different petroleum fractions. The processing of crude oil in refineries is carried out at high pressures. For this purpose, pressure testing is carried out in the refineries to ensure a safe production process. Pressure testing is equally important for the storage and transportation of petroleum fractions. Usually, the highest chances of production failure are linked to the pipeline system and the storage tanks in the refinery. This article discusses several leak testing methods, the planning process, the test’s preparation, the pressure testing’s execution, documentation, and acceptance of the test standards.
Pressure testing in the piping system is performed according to the piping codes. It is ensured that the newly installed or the already existing repaired piping system can handle the required pressure of the system and whether the system is leakage proof.
International regulatory bodies already define pressure testing standards that ensure the quality of the pressure testing performed. In pressure testing, the tests are performed according to the piping codes defined by the regulatory bodies. The codes have been generated by implying test procedures on prototype equipment. It involves increasing the pressure to a limit where measurable yield occurs, or the prototype reaches a point of rupture. From the acquired experimental data, pressure ratings are defined according to the code specified in the system.
Piping codes are numerous, with different codes relevant to different piping systems. However, two codes are usually important in pressure testing. These codes are defined by the American Society of Mechanical Engineering (ASME). These important codes are ASME B31 Pressure Piping Code and ASME Boiler and Pressure Vessel Code. These codes are usually universally applied to all piping systems; however, some piping systems need other codes defined by the design authorities and the commissioning branch of the industry. Other such codes can be AWWA standards for transmission and distribution piping and ASME B31 Pressure Piping Code. A detailed list of the piping code is given in the following table.

Different pressure testing methods are used in refineries to test leakages in pipelines and tanks. Following is the list of the commonly available method

The detail of each method is given below:
This is the most frequently used method in pressure testing. Hydrotesting is preferred over other testing methods because it is relatively safe compared to the pneumatic testing method. As water is used in hydro testing, its incompressible property makes it a safer medium than air. Moreover, it is an energy-saving process, as the amount of energy spent on hydro testing is lower than air compression for pneumatic testing. In hydro testing, energy is stored in the form of potential energy that can easily be released in case a failure during the test occurs. However, during hydro testing, chances of the presence of air trapped in the pipes remain high. Therefore, the highest levels of precaution must be taken while conducting hydro testing.
In pneumatic testing, the fluid medium used is compressed air or nitrogen if the source is bottled gas. However, nitrogen should be used in the pipeline only. Its testing tanks should be avoided as pressure testing involves confined space entry, and nitrogen can rapidly replace oxygen in the working environment. Workers can become unconscious and faint in a matter of seconds if the oxygen levels are not continuously monitored during pneumatic pressure testing. For some piping codes, pressure in pneumatic testing is kept lower than hydro testing for leak detection. It is because the chances of injury in pneumatic are greater than hydro testing. For instance, in the ASME B31.1 pipe system, the pressure kept less than 100psig during the entire operation.
In hydro-pneumatic testing, a combination of pneumatic and hydro testing is used. This method is considered safe as compared to the other two methods. In this method, pneumatic testing at low pressure, say 25psig, is performed first to indicate any major leaks in the system. This method is particularly useful in testing leakage in the pipes. In case of any leakage, required repairs are performed before moving to hydro testing. This method is not only safer but also a less time-consuming procedure. In hydrostatic testing alone, the entire system needs to be filled with water to find any leakage.
Another hydro-pneumatic is performed in which a combination of water and air system is used. It is particularly useful in the pipe and tank system in which both liquid and gaseous system is involved. In refineries, as petroleum products also travel in liquid and vapour phases, testing the system in both phases is important. Because at times, the system may not report leakage in the liquid medium, but it can report leakage in the gaseous medium.
The initial Service Leak testing is suitable for certain conditions only by code. ASME B31.3 limits it to category D fluid service, which is nonhazardous to humans and operated below 150 psi and at defined temperatures. Moreover, it does not allow this type of testing for external boiler piping but other piping systems. This type of testing can also be used to inspect nuclear power plants as per the ASME Boiler and Pressure Vessel Code Section XI. This test is conducted when the operation begins initially. The method gradually increases to normal operating pressure and then retains the pressure to check for leaks, as required in ASME B31.3.
This is an effective method to ensure whether there are leaks in the system or not. The methodology is to draw a vacuum on the system and trap the vacuum in the system. A leak is probable if the vacuum trapped in the system increases the atmospheric pressure. This test is often used as a production leak test by the manufacturers of various components. Although this test depicts a leak, highlighting the leak’s location is nearly impossible. For this purpose, smoking generators are used. However, a smoking generator isn’t functional for smaller leaks as a small leak does not draw the smoke into the piping. Thus, this method is unsuitable for piping tests where the pressure is more than the operating pressure.
The static Head Leak Testing is also known as the drop test because while retaining the required pressure, a drop in the water level in the standpipe depicts a leak. The level is noted when the sandpipe and the system are added with water. The height is re-taken after a specific time, and the decrease, if any, is noted. The visual scrutiny then determines the leak location.
The Halogen and Helium Leak Testing use tracer gas to detect leak location and intensity. In case of leakage detection, the system is charged by halogen gas. The detector probe senses leakages of any exposed joint. It consists of a tubular probe that draws a blend of the leaked halogen gas and air into an apparatus sensitive to a minute amount of halogen. The Helium test has two other more accurate methods in leakage detection. These methods are the Tracer mode and Closed System mode. The tracer model involves a vacuum drawn on the system with helium sprayed at the outer side to detect leaks. The hood or closed system model is one where the system is tested by enveloping it with concentrated helium. This is the most accurate method and is the only method accepted by ASME Code Section V as a quantifiable method. The manufacturers who use a hermetic seal usually need to use the hood method of leakage detection. The system is surrounded by helium in a chamber. The system is then linked to the helium leak detector, which draws the system’s internals to a vacuum close to absolute zero.

Hydrostatic Testing
The test method opted, and the medium for the fluid test will together establish the rules required in calculating the test pressure needed. Usually, the pressure to be applied is slightly greater than the design pressure applied for a short time, often 10 minutes. The intensity of this pressure is often 1.5 times the standard design pressure. However, it varies upon the code and the type of test to be conducted, whether hydrostatic or pneumatic.
Moreover, the limit of the test pressure should never be greater than the pressure that would result in yielding. The ASME B1 and the Boiler & Pressure Vessel Codes state the maximum test pressure as 90% of the component’s yield to be tested. Test pressure demonstrates that the vessel can endure the rated pressure. Following this period of more than design pressure, it is often acceptable to decrease the pressure to a lower value for inspection of leakages. The examination pressure is maintained for the length of time necessary to conduct


Pressure Test Failure
Pressure vessel and piping systems are used through the industrial processes and consist of great energy concentration. The design of these vessels is subject to federal, state, and local regulations and specific industrial standards. However, there are still various equipment failures.
The reasons for equipment failure include dilapidation and material damage during operation, ageing, problems during fabrication. Opportunely, continual testing and examinations increase the safety of a pressure vessel or piping system. Thus, this is vital for successful scrutiny and examination and the development of procedures for particular types of vessels. Various accidents have focused on hazards and risk factors associated with the storage and handling of fluids under pressure. Typically, vessels fail due to shell failure due to corrosive factors.
A proper pressure test program is the one that can identify issues and ageing problems, erosion, and other equipment failures and can identify
All companies have a complete set of guidelines that often work with pressurised apparatus for testing pipes and tanks. Such procedures are prepared after thorough scrutiny and safety standards of OSHA, DOT, ASME, local, state, and other standards.
Such papers involve details of responsibilities and roles, management functioning and safety guidelines, requirements for equipment and materials, various testing methods to validate the system and its mechanisms, guidelines for tests, emergency and hazard handling, etc. These guidelines include various protection and safety standards against toxic gases, high pressures, etc.
Rocha-Valadez, T., Mentzer, R. A., Hasan, A. R., & Mannan, M. S. (2014). Inherently safer sustained casing pressure testing for well integrity evaluation. Journal of Loss Prevention in the Process Industries, 29, 209-215.
Jie, X., Xiaoming, Q., Xianlin, X., & Li’na, L. (2008). Research on the garment pressure testing methods [J]. Knitting Industries, 9.
Xiaohuan, L., Lihuan, Z., Chong, H., Cannong, X., & Qi, Z. (2016). Study of the making and pressure testing methods of pressure garments. Knitting Industries, 04.
Power, R. B. (1994). Steam jet ejectors for the process industries.[Glossary included].
Killeffer, D. H. (1925). Catalyst Testing—The Basis of New Industries. Industrial & Engineering Chemistry, 17(8), 789-792.
This article presents a general overview of a water treatment and distribution system. The system described comprises source well pumps, settling tanks, filter charging pumps, multimedia filters, carbon activated filters, potable water storage tanks, backwash pumps, water distribution pumps, chemical injection systems, potable water storage tanks, and piping systems.
The water treatment system described in this article does not cover saline water such as seawater. The focus is on freshwater extracted from boreholes or other open sources.
Water is an essential commodity required in our daily activities. Water has a wide range of applications, including irrigation in agriculture, domestic use such as washing dishes and equipment, and, most importantly, human consumption.
There are two categories of water; Freshwater and Saline water; the other, described as brackish water, is a transition from freshwater to saline water. There are different types of Saline Water; slightly saline water, moderately saline water, and highly saline water.
Below is a brief description of the categories of water
Any naturally occurring water containing low concentrations of dissolved salts (usually Sodium chloride) but may contain other dissolved minerals and particles is termed freshwater.
While some sources place the dissolved salt concentration in freshwater at 500 parts per million (ppm), some other sources estimate the salinity of fresh water at lesser than 1000 ppm.
Freshwater can be obtained from ponds, lakes, swamps, underground etc.
Freshwater is, most time, not potable water. Much of the fresh water on the earth is contaminated and polluted; therefore, substantial treatment is required to make the water fit for drinking. The contamination may result from human activities such as sewage contamination or naturally occurring processes, including erosion, landslide, etc.
When freshwater appears physically clean, it may contain pollutants such as minerals, particles and other suspensions that are not visible. These pollutants must be eliminated by subjecting the water through a treatment process before usage. The degree of treatment depends on the application of the water; water for general utility application such as the washing of farm equipment etc. may undergo lesser treatment than water required for drinking and washing of dishes. Note that the treatment process specified should be tailored to the water analysis results. The analysis gives details of mineral concentration, particles concentrations, colour etc.
Saline water, popularly known as saltwater, contains a high salt concentration (Usually Sodium Chloride). Depending on the salt concentration, saline water is categorised into
Water with salt concentrations ranging from 1000ppm to 3000ppm is slightly saline water.
Water with a concentration ranging from 3,000 ppm to 10,000 ppm is termed slightly saline water.
Water with salt concentrations ranging from 10,000ppm to 35,000ppm is highly saline.
Note that ocean water contains about 35,000 ppm of salt.
Brackish water occurs in a natural environment with salinity higher than freshwater but not as high as seawater. Brackish water may result from the mixing of freshwater and seawater as in Estuaries, may also occur in brackish fossil aquifers, or may be formed due to human activities such as civil engineering projects like dikes etc.
Though there is no actual defined salinity range of brackish water, a salt content between the ranges 0.5 to 30grams of salt per litre of water is used to describe brackish water.
In simple terms, Potable water means water that is safe to drink.
For water to be potable, in most cases, treatment is required.
This section describes a standard freshwater treatment process. The system may vary slightly across facilities due to the varying degree of treatment required.
The best form of water treatment is tailored to the results obtained from the water analysis performed. The major difference is the chemical injection and filtration required to bring the water composition to a specified standard such as EPA, WHO or local standards.
The treatment process described does not cover saline water, employing two main treatment processes: distillation or reverse osmosis.
The below sub-section describes a typical water treatment process.

Figure 1: Potable Water Treatment Unit
This process aims to cause the tiny particles (dirt) in the water to coagulate or stick together. Liquid alum sulphate Al2(SO4)3 and polymer is introduced into the untreated water to coagulate the particles. The coagulation causes the tiny particle to stick together to form larger, heavier particles called flocs. Due to their weight, the flocs may settle to the bottom, forming sludge that can be easily removed or trapped in the water filters.
As the flocs flow through the treatment process, they move into settling or sedimentation tanks. In some designs, the water flows slowly through the sedimentation tanks to allow the flocs to gradually settle to the bottom, while in some systems, there are dedicated settling tanks. When the water flows into the settling tank, a settling period is allowed for the heavy flocs to fall to the bottom.
The flocs that settle at the bottom are called sludge and are piped out to sludge drying beds or processing units. In some systems, such as the direct filtration system, the sedimentation step is excluded, and the flocs are removed by filtration.
The filtration process removes suspended particles or flocs in the case of direct filtration. Perfect or near-perfect filtration is usually achieved in two stages of filtration. The water flows through multimedia filters and carbon-activated filters. Note that other filters may be applicable; however, all filters must be routinely cleaned by backwashing.
Disinfection is performed to ensure disease-causing microorganisms are destroyed. Chlorine or chlorine compounds such as hypochlorite are used to achieve disinfection because they have proven to be very effective. The disinfectant is introduced into the water before entering the potable water storage tanks or distribution systems. In some systems, a UV disinfection unit is used against chemical disinfection. UV system major advantage is that there is no chemical injection into the water.
A sludge processing unit is an external unit to the water treatment plant. The flocs collected at the bottom (Sludge) are piped into a sludge drying bed or sludge processing unit. The dried sludge can also be used for other purposes, such as a sand filling.
Fluoridation entails increasing the Fluoride concentration in the water to an optimum level of approximately 0.7 ppm, or 0.7milligrams of fluoride per litre of water. At this optimal level, tooth decay is prevented. Usually, Fluorides are present in natural water but at different concentrations, but in cases where the concentration is below 0.7ppm, fluoridation is required. Fluoridation is an optional treatment process; in some cases, calcium compounds may also be introduced into the water.
pH correction is achieved by introducing Sodium Hydroxide (NaOH) into the filtered water. The Sodium Hydroxide raises the pH of the potable water to a level that minimises metal corrosion. This method is one of the most effective ways of reducing lead corrosion and minimising lead levels in potable drinking water.
The components of a portable water treatment unit may vary; however, some major equipment such as storage tanks, treatment units, source well pumps, piping, and end-user features are common to all systems.
The pressure to sufficiently deliver water to the most remote location in the network is key; therefore, a detailed network analysis must be performed. The analysis is performed using software such as Pipeline. The software determines the pressure and flow rate available at each node within the network. Also, note that software calculated pressure and flow rate is compared to the required pressure. Refer to the link below for details of the required flow rate and pressure for water distribution system features.
https://www.engineeringtoolbox.com/fixture-water-capacity-d_755.html
See below the Process flow scheme of a water distribution system.

Figure 2: Typical Flow Scheme Potable Water Treatment and Distribution System
P – 01A & P – 01B: Source Well Pumps
ST – 01A: Inline Static Mixer
T – 01A & T – 01B: Settling Tanks
P – 02A & P – 02B: Filter Charging Pumps
S – 01A & S – 01B: Multimedia Filters
S – 02A & S – 02B: Activated Carbon Filters
T – 02A: Ground Storage Tank
P – 03A & P – 03B: Potable Water Pumps
P – 04A & P – 04B: Backwash Water Pump
01: Alum Feed System (Pump and Storage Tanks)
02: NaOH Feed System (Pump and Storage Tanks)
03: Hypochlorite Feed System (Pump and Storage Tanks)
04: Polymer Flocculant Feed System (Pump and Storage Tanks)
05: Calcium Chloride Feed System (Pump and Storage Tanks)
The source well pumps are the first treatment and potable water distribution systems. In most cases, the pumps are submersible pumps installed in underground boreholes, while surface pumps may be used when the pump takes water from an open-source. Note that there are cases that surface pumps are used to transfer water from boreholes. Source well pumps should generate good heads to transfer the water to the settling tanks efficiently.
The inline mixer is installed on the piping between the source well pump and the raw water settling tank. The mixer ensures that the chemical dosed into the raw water, such as Alum, etc., is properly mixed into the water stream before entering the settling tanks. As the appropriate chemical quantity is dosed into the pipe, the chemical is mixed with the water utilising the energy of the flow stream.

Figure 3: Typical Static Inline Mixer
The settling tanks are primary treatment units in a water treatment system, primarily used to settle particles collected from the water source. When flocculating agents such as alum are introduced into the water, they aid aggregation of smaller particles that settle to the bottom of the tanks forming sludge. The sludge from the tanks is disposed of at intervals.
When a sedimentation basin is used, the water flows through the basin very slow while the flocs fall to the bottom to form sludge.
Raw water tanks may be made of corrosion-protected steel materials or non-metallic materials.
The filter charging pumps transfer untreated water from the settling tanks into the water treatment unit. The flow rate of the filter charging pumps is aligned to the filtration unit’s flow rate, i.e., the flow rate should not be more than the maximum specified flow rate of the filters; else, the filtration beds will not function properly.
Minimum two fully rated filter charging pumps should be installed.
The water treatment unit is the heart of the water distribution system. It is responsible for providing potable water. It consists of different filters, chemical injection tanks and chemical dosing pumps. A typical water treatment unit will be discussed in the next session.
The treated water is stored in the tanks. Sometimes, a ground tank (Tank installed at grade level), an overhead tank or both ground and overhead tanks are installed. The decision to install a ground tank is a function of the required water volume; a larger quantity of water is stored on ground tanks. Also, suppose the water distribution system is pressurised. In that case, there might be no need for overhead storage because the pressure generated by the pump will be sufficient to distribute water to the entire network.
Most water storage tanks are Braithwaite Steel or GRP, galvanised tanks with appropriate lining or non-metallic storage tanks.

Figure 4: Internally Line Galvanised Tank
Piping is a key component of every potable water distribution system. Piping connects all the equipment and transports the treated water to the end-users. Piping material selection is a function of pressure, temperature and corrosion resistance. Below are some piping materials used for transporting potable water.
Due to cost, stainless steel, copper and GRP pipes are not as popular as PVC and Galvanised carbon steel pipes.
Since water distribution systems are usually low-pressure systems, non-metallic piping materials are the primary choice; however, metallic pipes are preferable for increased pressure systems and large diameter piping systems.
Kindly refer to the individual material pressure rating to select appropriate materials.
These pumps transfer water from the potable water storage tanks to the end-users. When overhead tanks are used, the pressure generated by the tank’s elevation may be sufficient to transfer the water to the end-user; however, in most cases, a pump is required to supply the desired water flow rate to the end-users.
This section briefly gives the details of a typical water treatment unit. The specified treatment unit is usually tailored to the result of the water test analysis performed. In most systems, there are two filtration trains, one running while the other is on standby to be used during the maintenance of the other unit.
The filters are the main components of the treatment unit. Two types of filters are usually installed.
Unlike Single media filters that utilise only sand or other loose materials, Multimedia filters utilise three layers of filtration media in a single vessel. The layers are made of anthracite, sand and garnet. The basis for selecting these media is the obvious differences in their densities. Anthracite is the lightest filtration media, followed by sand and then garnet. Anthracite has the largest particle size, followed by sand and then garnet. The largest particle media (Anthracite) naturally stratifies at the top of the filter, followed by sand, while the heaviest media (Garnet) settles at the bottom.
It should be noted that the water to be filtered flows from the top of the filter to the bottom. The largest contaminants are trapped on the Anthracite layer as the water flows downward while smaller contaminants sift further downward. The three media filtration results in more efficient turbidity (suspended solids) removal and allows the filters to be operated longer before backwash than single media filters. Usually, sand filters can remove contaminant particle sizes down to 25 – 50 microns, while multimedia filters can eliminate 10-25 microns.
After using the filter for some time, maintenance should be performed to remove the trapped contaminants through a process called backwash. Backwash may be required when there is a significant pressure drop across a filter. In some units, the pressure drop across a clean filter may be between 3–7 psi, while filters with a pressure drop of about 10psi should be backwashed. In general, a backwash should be performed when the differential pressure exceeds 1.5 to 3psi over the differential pressure of a clean filter.
Backwash means reversing the flow through the multimedia filters resulting in loosening the beds to remove trap contaminants in the beds. The backwash flow rate is usually higher than the water filtration flow rate; the flow rate should be sufficient to loosen the entire beds, thereby driving the contaminants upward above the filtration media. Also, note that the flow rate should not be sufficient to drive the filter media out of the vessel; therefore, the backwash flow rate/velocity should not exceed the vendor specified parameters. During backwash, both the suspended contaminants and the water exits the top of the filter.
In most filtration processes, carbon is a commonly used medium. They are used to reduce or remove organic chemicals and chemicals that give odours or tastes to water, chlorine, herbicides, etc., through adsorption. Adsorption means the contaminants are attracted and held to the surface of the activated carbon in the same way a magnet attracts and holds iron filings. Note that a carbon filter cannot remove chemicals like iron and nitrates; therefore, other filters such as greensand filters may be required. Kindly contact the filter manufacturer for specific advice on the removal of chemicals.
Filters made from carbon for water filtration are produced by grinding up a carbon source such as bituminous coal, coconut shells etc. though coconut shells are the most widely used.
Making the filter material entails heating the material to 1000oC without oxygen to bake off impurities. The material is later subjected to steam at about 1600oC to activate the carbon; the effect of the steam leaves carbon granules filled with cracks and pores, which enables them to store many chemicals and contaminants. As the water from the multimedia filters flows into the activated carbon filter, contaminants are attracted to the carbon to perform the filtration. The service life of the filters depends on the concentration of the contaminants; therefore, the manufacturer’s recommendation is key.
Carbon filters may be of different types, including; Granular Activated Carbon (GAC) Filters, Carbon Blocks Filters etc.
Based on the water analysis result, different chemicals may be required to be injected into the water, such as Sodium Hydroxide (NaOH), Flocculants, Hypochlorite, etc. Each of the required chemicals is stored in a separate tank. The size of each tank is a function of the number of chemicals to be dosed into the water.
Each dedicated chemical dosing pump delivers the appropriate required quantity of chemicals into the filtration system. Refer to Fig 2 for typical examples of chemicals dosed into the water treatment system. Chemical dosing pumps are mostly positive displacement pumps.
The backwash pumps are integral components of any water treatment plant. They are only used during maintenance. They provide the required flowrate to loosen the filter beds to eliminate the trapped contaminants in the filters. Centrifugal pumps are used as backwash pumps.
In some water treatment processes, chemical injection is minimised by introducing an aeration unit and UV disinfection Box. Water aeration can precipitate dissolved iron and manganese, raise water pH, and eliminate dissolved gases such as carbon dioxide, hydrogen sulfide, and volatile organic compounds. Aeration is performed before the water flows into the filtration unit.
The UV disinfection process eliminates micro-organisms such as bacteria, algae, viruses etc. this is achieved by exposing the micro-organism to the ultra-violet rays of light for a specified period. The UV treatment replaces chlorination; however, UV treatment does not eliminate all micro-organisms.
Note: The water treatment process must be tailored to the water analysis results.
Petroleum subproducts are an essential part of our everyday lives. They heat our homes, fuel our cars, power industry, schools and hospitals, and are turned into hundreds of consumer goods, from cellphones to clothing to cosmetics. But before those products turn up, crude oil must be refined into petroleum.
Assembled in the 1960s, Line 3 is a 1,100-mile crude oil pipeline going from Edmonton, Alberta to Superior, Wisconsin, and is an essential part of Canada’s Mainline System operated by Enbridge Corporation. Enbridge proposed to replace Line 3 to restore the historical operating capabilities of Line 3, reduce future maintenance activities, create fewer disruptions to landowners and the environment, and maintain its high safety standards.
A new 36-inch diameter pipeline will substitute the existing 34-inch diameter pipeline along most Line 3 route [1]. In the U.S., the renewed pipeline will follow the existing Line 3 route from Joliette, North Dakota, to Clearbrook, Minnesota. It will primarily follow existing pipeline and transmission routes from Clearbrook to Superior.
The $2.9-billion U.S. chunk of the Line 3 Replacement Program, known as the Line 3 Replacement Project, replaces the existing 34-inch pipe with a new 36-inch pipe for 20.9 kilometres in North Dakota, 542 km in Minnesota, and 21.5 km in Wisconsin. The latter entered service in May 2018, after construction and commissioning were completed in December 2017; the North Dakota segment was concluded in December 2020; in December 2020, Enbridge began construction in Minnesota.
Line 3 pipeline has been and continues to be an essential component of North America’s pipeline transportation network to deliver the crude oil allocated for refiners and used by residents. Line 3 will ensure that the operator can transport the crude oil refiners needed in Minnesota, neighbouring states, Eastern Canada and the Gulf Coast. The existing Line 3 project will be operationally integrated into the Enbridge Mainline System and ensure crude oil transportation from Alberta to Wisconsin.
The main project benefits comprise about 8,600 jobs (6,500 of them local) in Minnesota over two years, including new 4,200 union construction positions, half of which are expected to be filled locally [2]. A $2 billion incentive to the Minnesota economy during design and construction would indeed have a measurable impact on the state’s economic activity, with $1.5 billion of that in Enbridge spending alone. Then there is the significance of $334 million in payroll to workers (about 50% of that to local workers) and a $162-million construction-related benefit for local economies due to non-local workers in Minnesota. Enbridge alledges would translate into the purchase of local products/materials and the use of local hotels, restaurants, and services.
It is also expected that the replacement project will increase long-term property tax revenue in each county crossed by the pipeline. Enbridge pays more than $30 million in the state’s property taxes annually; this will rise incrementally by more than $35 million commencing the first full year of service. The Line 3 Replacement Project will diminish apportionment, continue reliable crude oil delivery, and provide energy savings on a per-barrel basis; by doing so, it will support Minnesota refineries.

Figure 1. Final Line 3 Replacement Project route through Minnesota territory. Source: https://www.enbridge.com/projects-and-infrastructure/public-awareness/minnesota-projects/line-3-replacement-project
In October 2014, Enbridge filed its Notice Plan with the Minnesota Public Utilities Commission (MPUC); MPUC approved the Notice Plan by the end of January 2015. Enbridge conducted seven Open House meetings along the proposed route two months later.
In April 2015, Enbridge filed its Certificate of Need (CN) and Route Permit (RP) applications with MPUC, which by July that year deemed the CN and RP applications complete. Therefore, it commenced its regulatory approval processes in both applications.
In August, the Minnesota Department of Commerce (MDOC) held public information and environmental analysis scoping meetings along the existing and proposed route.
In January 2016, the MPUC order referred joint CN and RP proceedings to the Office of Administrative Hearings (OAH). It also ordered Environmental Impact Statement (EIS) for the project; further ordered the completion of the EIS before commencing the CN and RP permitting processes. A month later, Enbridge filed a petition for reconsideration with the MPUC, asking it to reconsider its decision to require the final EIS be issued before commencing the CN and RP permitting processes. The MPUC adopted a final EIS scoping document in October.
In December 2017, construction on the 13.3-mile Wisconsin segment of the project concluded to enter service in May 2018.
On June 28, 2018, a significant milestone was achieved: MPUC approved the Line 3 Replacement Project, granting a Certificate of Need and approving Enbridge’s preferred route with minor modifications and specific conditions.
Three months later, Enbridge submitted permit applications for the Minnesota and North Dakota project. North Dakota’s Department of Health issued the 401 Water Quality Certification, so Enbridge received all necessary permits from the state as soon as February 2019. As per the State of Minnesota, certifications on all remaining licenses required for the construction of Line 3 were provided in November.
Lately, the MPUC ruled that the L3RP’s second revised Final Environmental Impact Statement (FEIS) was adequate and reaffirmed L3RP’s applications for a certificate of need and pipeline routing permit (February 2020). Construction in Minnesota and North Dakota will begin concurrently once all permits and approvals have been received in a due date to be announced.
Line 3 is one of the six assets that comprise Enbridge’s primary pipeline system, and it is a mixed-service line conveying a variety of crude oils. The firm’s assessment of the pipeline in 2013 highlighted the need for segment replacement and integrity digs to maintain the system’s stability.
Around 4,000 investigatory digs were estimated to be required to maintain the integrity of the US segment alone. The assessment also acknowledged that the digs would disrupt landowners and the environment. Hence, replacing the pipeline was the best solution to maintain the integrity and reduce disruption to landowners.
The project will replace the existing 34-inch diameter pipe of the Canadian segment with a 36-inch high-strength steel pipe, while the US segment will be replaced with a 34-inch diameter pipe. The new pipeline will feature the most advanced coating technology and associated pieces of equipment. More than 90% of the pipeline’s right-of-way will be implanted on private land. The average annual capacity of the replaced channel will increase from the actual 390,000 barrels per day to around 760,000 barrels per day.

Figure 2. Enbridge Line 3 pipeline construction, in Hardisty, Alberta. Source: https://edmontonjournal.com/business/energy/construction-starts-on-enbridge-line-3-pipeline-replacement-from-hardisty-to-wisconsin
The asset will be constructed by dividing the network into manageable sections, ranging from 90km to 140km. Segments will be transported to the site before being welded and lowered into trenches dug by tracked excavators. These will be backfilled once the pipeline is deployed. Hydrostatic testing will be used to evaluate the integrity of the new pipeline. The present Line 3 infrastructure will be decommissioned once the new pipeline becomes operational.
The plan includes the installation of 55 remotely-operated valves, including those to be deployed near watercourses. The valves will allow the pipeline to be shut off when required. Additionally, 18 pump stations and related facilities will be erected at the Hardisty terminal and three new tanks. The storage tanks will have a volumetric capacity of up to 375,000 barrels each and are set to booster pumps, secondary containment systems and associated facilities. New launcher/receiver traps will also be installed at some pump stations.
Environmental impacts due to the pipeline’s construction will be related to temporary disturbance to the land, water bodies, and wetlands. Environmental impacts derived from pipeline operations will primarily be associated with maintenance repairs, overhauling and mowing activities. Almost a decade ago, company men started working with federal, state, and local regulatory agencies to design project plans and facilitate conditions to minimise environmental impacts. Enbridge is committed to retaining environmental inspectors during Project construction who will be in charge of all regulatory compliance, enabling permit conditions, and ensuring that contractors abide by these circumstances. The project will also be overseen by third-party ecology monitors who report any concerns directly to appropriate agencies.
The U.S. Army Corps of Engineers (USACE) began tribal consultation for the planned Line 3 Replacement Project in 2015 [3]. They interacted with 43 Tribes, resident Tribes and those with ancestral ties to the area and remain in consulting stages with 39 Tribes. A tribal cultural survey, led by Fond du Lac Band of Lake Superior Chippewa, was conducted along the Project corridor, across Minnesota and into North Dakota. The tribal survey crews re-visited previously recorded sites, modified boundaries of a few previously documented spots, and identified 22 archaeological resources along 560 km— all this to identify significant cultural resources to be avoided by earthworks.
Above 20 federal, state and local permits and approvals were needed before constructing this pipeline project, maybe the most studied work in Minnesota history. These environmental permits relate to how the pipeline construction will ensure the protection of cultural resources, water, land and wildlife:
Some of these licenses are devoted only to water conservation. Pipelines are, by definition, similar to other forms of transportation infrastructure. The project site’s dewatering and stormwater management are the only water-related concerns. Unlike mines, paper mills, and other industrial uses, water is not a continuous process that needs treatment and monitoring.
Work in wetlands and water bodies is deemed temporal during construction, pumping water out of ditches and utilising water to pressure test the new pipeline. The Minnesota Pollution Control Agency imposes that possible consequences be identified and addressed. In addition, operators might expand their activities at Clearbrook Terminal, which will impact previous air permits.
The pipeline sector has sought to minimise required approvals by employing existing infrastructure, which entails a less time-consuming review [4]. The reversal of the Enbridge Line 9 pipeline to transport diluted bitumen eastward rather than refined product westward and to replace the Line 3 pipeline running through Minnesota offer examples. However, these two have indeed faced public contestation.
To many Indigenous people, framing fossil fuels and other energy sources as “natural resources” does not accurately define energy projects or capture related risks. Some Anishinaabe pipeline opponents have suggested that traditional harvesting protocols—culturally embedded moral precepts that govern the gathering of food and medicinal plants—also be applied to activities that produce energy. This section explores how this could be done, focusing on tar sands extraction and the Line 3 expansion plan.
There is mounting Anishinaabeg resistance to pipeline projects throughout Anishinaabe Aki, including opposition to the Line 9 reversal, Line 3 replacement program, Line 4 expansion project, and the continued operation of Line 5 . In November 2016, the Canadian federal government approved the pipeline replacement and construction commenced on the Canadian side of the border. The Assembly of Manitoba Chiefs appealed the NEB’s decision in December 2016, challenging the project’s approval due to improper consultation. In response to premature construction in Canada and Wisconsin, resistance camps formed across northern Minnesota in February 2017 (including the Makwa Camp and White Earth Spirit Camp).
A significant development in the struggle against Line 3 took place in December 2018. The White Earth Anishinaabeg unanimously enacted the Rights of Manoomin (“the good seed” or wild rice), which recognise s that wild rice within the White Earth territory has the inherent right to exist, flourish, regenerate, and evolve, as well as the right to restoration, recovery, and preservation (White Earth Band of Minnesota Chippewa Tribe 2018). The rights of Manoomin include but are not limited to: (1) the right to freshwater habitat, (2) the right to a healthy climate, and (3) the right to be free from patenting and genetic engineering.

Figure 3. The magic universe of the Anishinaabeg. Source: https://commons.wikimedia.org/wiki/File:The_Magic_Universe_of_the_Anishinaabeg.jpg
The scope of Manoomin’s rights are far-reaching: Manoomin not only has legal rights, but White Earth recognises these rights as being brought into action in the name of Manoomin as the real party in interest. Manoomin has the right to intervene in any action concerning their rights legally, and other parties to that action (lawyers, for example) cannot entirely represent Manoomin’s particular interests. Manoomin has a genuine and distinct role in decision making.
Moreover, Section 3 (Enforcement) outlines how the Tribal Government will take all necessary actions to protect and implement the Rights of Manoomin. Law enforcement is prohibited from arresting or detaining persons defending these rights. Any business or government that violates the Rights of Manoomin are punishable by tribal law and liable for any damages to Manoomin and their habitat. The Rights of Manoomin demonstrate that Anishinaabe people are involved in local actions on a national scale.
[1] https://www.hydrocarbons-technology.com/projects/line-3-pipeline-replacement-programme/
[2] https://www.enbridge.com/projects-and-infrastructure/public-awareness/minnesota-projects/line-3-replacement-project
[3] https://www.mvp.usace.army.mil/Portals/57/docs/regulatory/Enbridge/Combined%20PN%202014-01071_FINAL.12.20.18.a.pdf?ver=2018-12-21-083755-370
[4] Gilbert, L., & Zalik, A. (2018). The limits of audit culture extractivism: Risk and reinsurance in Canadian oil transport by rail and pipeline. The Extractive Industries and Society. doi:10.1016/j.exis.2018.09.015
Pressure testing is a common industrial procedure carried out in all process industries. It is a procedure conducted to ensure that piping and vessel systems can safely operate at the design parameters. High-pressure operations involve a high level of risk, and it is pertinent to carry out all the safety procedures before conducting the pressure testing. Before any pressure testing is carried out, a systematic inspection is required to make the procedure hazard free and safe for operation. For industry-standard safe practices for pressure testing, a dedicated safety officer decides the parameters required. This document highlights all the industry-standard safety practices involved in pressure testing procedures.
This article is applied to all the operations involved in the safety practice.
Hydrostatic Testing: usually, the preferred method of testing is hydrostatic testing, as it involves less stored energy and carries less potential of hazard. In hydrostatic testing, water at low pressure is pumped into the system, and no air is used. This reduced the overall stored energy of the system.
Pneumatic testing: this type must be used only when hydrostatic testing cannot be performed in the system. As the stored energy in pneumatic testing is very high, it has a great potential for hazard. As water cannot be compressed in hydrostatic testing, pneumatic testing causes air compression at high pressures making it highly dangerous for workers.
In pressure testing, most of the hazards are associated with the sudden release of the stored energy in the system. As the system contains joints, valves, gauges, and other components, the free fall or release of these components with high pressure can result in a potential hazard at the workplace. This intends a safe workplace environment for pressure testing procedures.
Following pressure testing hazards are involved in the pressure testing practices:
The following are the most frequently registered injuries involved in the pressure testing sites:
Less common but other possible injuries at the pressure testing sites are:
The above-discussed injuries are inevitable if the Standard Operating Procedures (SOPs) for the safety of workers is not performed. In addition, safety training of the workers and careful implementation of safe practices are important to avoid any injury.
Following are the common failures that occur during the pressure testing procedures:
Over pressurised systems: to control the over pressurising of the system, it must be first tested with a test pressure. The safety engineer studies the design pressure first to know the maximum pressure the system can be tested. Many parts of the system, including valves, gauges, pipe fittings and others, can withstand a limited amount of pressure. The system designers already provide the design pressure of the system and its components in the process manual. These manuals should be frequently referred to during pressure testing procedures. The Safety and process engineers must perform the following calculations.
Lack of proper pressure testing equipment: valves, gauges, pipes, hoses and pipe fitting are the usual pressure testing equipment involved in the pressure testing procedures. Test equipment can fail during the procedure if low quality and cannot design at high pressures. In addition to its proper calibration of the equipment is also important. Following steps can be taken to avoid safety hazards:
Loopholes in the design of the pressure testing system: Possible loopholes in the system design can affect the system’s operation. This also included improper functioning of the part of the system. Mostly system failure occurs due to design errors failing the system components.
To avoid this, it is important to verify the system before commissioning. It is also necessary to cross-check the original design data before initiating the pressure test.
Human error is the most anticipated error in the pressure testing process. It usually occurs when the operators rush towards the test without performing the necessary checklist. Operators also fail to follow the standard operating procedures of the pressure testing, the process guidelines and equipment specification list.
To avoid this, the following procedure must be followed:
Improper repairing in the system: Error in the repair system before the pressure testing or modification of the existing process can cause problems in the pressure testing procedure. For example, improper fittings misaligned or ruptured gaskets can cause pressure failure in the system. To avoid this, the following measures must be taken:
Failure to segregate the area in which pressure testing is being performed: It is important to isolate all the parts of the system involved in the pressure testing. If the system is not isolated, it can affect other system parts that are not under test. As a precedent, if a relief valve not included in the pressure test is not isolated, high pressure can fail the valve leading to damage to the entire system. Moreover, high pressure can shatter the components of the system and cause hazardous conditions for the workers involved in the pressure testing procedure. To avoid this, the following precautions must be taken:
Ensuring the Standard Operating Procedures:
Apart from this document, all the ASME standards should be followed in the SOPs during hydrostatic testing.
Use of all the SOPs defined for the hydrostatic pressure testing.
The safety engineer must draft a pre-test safety plan based on the defined SOPs for hydrostatic testing. This pre-test safety plan must include the following:
All the workers involved in the process must be trained for hydrostatic tests and the specifications involved in the test.
Before initiating the safety process, the workers should be briefed about the test:
Before starting the pressure testing, process and safety engineers should perform a walk-down procedure to inspect the system physically. At this stage, the safety checklist is important.
The final test checklist must be carefully prepared in light of the following points:
Before initiating the process, the use of PPEs by every person involved in the test must be ensured. In the pressure testing process, the following PPEs must be used.
The following SOPs must be followed during the pressure testing procedure:
After the test is successfully conducted, a post-test inspection is necessary. The following procedure must be ensured:
Ensuring the Standard Operating Procedures:
Use the same pre-test safety plan as listed in the hydrostatic testing.
Work permit for Pneumatic testing must be obtained from the safety supervisor.
Use the same training plan as listed in the hydrostatic testing.
Use the same safety briefing as listed in the hydrostatic testing.
Use the same walk down procedure as listed in the hydrostatic testing.
Use the same final test checklist as listed in the hydrostatic testing.
Before initiating the process, the use of PPEs by every person involved in the test must be ensured. In the pressure testing process, the following PPEs must be used.
The following SOPs must be followed during the pressure testing procedure:
After the test is successfully conducted, a post-test inspection is necessary. The following procedure must be ensured:
The supervisor is responsible for the following acts:
Water is a valuable commodity, and its scarcity is becoming an ever-increasing problem worldwide. In North African countries, water supply is limited, the quality is deteriorating, and there is an ever-widening gap between availability and increasing demands. All these factors make it imperative that action is taken to avoid an impending shortage and avoid disputes and international conflicts over transboundary water resources.
From a very early stage, the Libyan authorities were aware of the imminent water crisis in Libya and the North African region generally. They decided to implement their own national solution [1]. The Great Man-made River scheme—the first two phases completed in 1991 and 1996—involves conveying high-quality water from groundwater in the southern basins to coastal regions where the country’s leading domestic, agricultural and industrial demands need to be met.
The Great Man-Made River (GMMR) consists of a vast network of underground pipelines and aqueducts bringing high-quality freshwater from ancient aquifers deep down the Sahara to the Libyan coast for agriculture, domestic use, and industry. The GMR has been defined as the largest irrigation project globally — indeed, the Libyan government proudly proclaimed it “the Eighth Wonder of the World.” Since 1991, the project has supplied the much-needed water resources to populous cities and farming areas in Libya’s north, which previously depended on desalination plants and declining rain-fed aquifers near the coast.
As a result, Libya is now a world leader in water engineering, and it wants to find a market for its expertise in other African and Middle-Eastern countries facing similar problems with their hydrological systems.
In the XX century, Libya’s population growth and severe drought circumstances had put a heavy strain on its water supply, especially since the country does not enjoy a renewable water source, relying mainly on groundwater to satisfy its historical water demand. In the 50s and 60s, enormous quantities of fresh groundwater were discovered in aquifers in the deserts of the south during oil explorations.
To reconcile the gap in its traditional supplies, the national government, headed by Muammar Gaddafi, undertook one of the most significant civil engineering projects in the world to green the northern shore. [2]. The project aimed to supply H2O for agriculture as well as for municipal and industrial uses from “fossil” water collected more than 35,000 years ago in the Nubian Sandstone Aquifer. This was accomplished by constructing an underground network of pipelines to transfer water from Libya’s southern deserts to its northern towns.
The earliest feasibility studies were carried out in 1974, and construction began in 1984. Evaluation and tenders for the detailed design were concluded in 2005. The project’s water was intended to be utilised for agricultural uses to the tune of 80%. For example, the town of Abu Shieba in the west had 700 hectares of irrigated land before the project. After output from the project reached the place, agricultural lands increased to 1600 hectares, and the number of farmers more than doubled from 117 to 305. Following the experiment, water-intensive crops such as maise, peanuts, and vegetables like cauliflower and cabbage and fruits like oranges and grapes were planted, improving farmer revenue.

Figure 1. A fleet of more than one hundred transporters carrying four meters-diameter pipe modules. Credit: https://file.ejatlas.org/img/Conflict/3317/transport.jpg”https://file.ejatlas.org/img/Conflict/3317/transport.jpg
The project’s goal was to make Libya self-sufficient in terms of water imports by generating enough water to meet its municipal, agricultural, and industrial needs. Government officials had planned that Small farmers would be provided land to raise produce for the home market, and large farms would also be built to cultivate Libyan-imported crops. The initiative might also allow Libya to launch an agro-business comparable to California’s San Joaquin, a desert valley that has become one of the world’s top producers thanks to irrigation projects [3].
In 2011, NATO bombed the Great Man-Made River — an attack over essential civilian infrastructure [4]. 70% of Libyans depended on water piped in from the works under attack. Since the water pipe infrastructure is probably the most essential civilian infrastructure in the country, particularly in the time of war (2011-2020), bombing the Brega pipe factory, which enables leaks and breaks in the system to be repaired, was allegedly a war crime. NATO admitted that its jets attacked the pipe factory, claiming in justification that it was used as a military storage facility, and rockets were launched from there.
The GMMR has established important water supply wellfields, including Sarir-Sirt, Tazerbo-Benghazi System (SSBT); Kufra/Tazerbo System; Sirt/Assdada System; Jagboob/Tobruk System; Hasouna-Jeffara System; and Ghadamis/Zwara system. The Tazerbo Wellfield is situated in southeastern Libya. It is located in a flat desert area at the southern limit of the Sarir plain and covers an area of 1000 square kilometres. The Tazerbo Wellfield lies along the south – west north – east alignment of the southern flank of the Hercynian uplifts, which forms the boundary separating the Kufra and Sirt basins.

Figure 2. The layout of the various phases of the Great Man-made River project. Source: http://dx.doi.org/10.1680/cien.2006.159.5.39
In 2005, the Great Man-Made River Authority awarded one of the most challenging sections of Libya’s mega water transmission scheme: construction of 380 km for water conveyance between Al Khufra and Tazerbo. Free issue post-tensioned concrete pipes, each with a length of 7,5 m, a diameter of 4 m, and a weight of 72 t, were transported and erected in the harsh conditions of the Sahara Desert. The project is part of a multinational scheme monitored and supported by International Fund for Agricultural Development (IFAD), an organisation under United Nations.
So, what are its main highlights?
The Tazerbo Wellfield consists of 108 wells that will discharge their flow into a collector pipeline and then into the header tank at Tazerbo [5]. These wells are distributed into three parallel lines; each line is divided into two sections, and each line is 50 km long and consists of 36 wells. The well numbers in the first line are 101-118 and 201-218, the second line as 301-318 and 401-418, and the third line as 501-518 and 601-618. These lines are named line 100 to line 600. The spacing between the wells is 1.3 km, and the distance between these three parallel lines is 10 km. The total depth of the production wells (108 wells) in Tazerbo Wellfield ranges from 460 to 580 m.
The wellfield system also comprises more than 98 exploratory and piezometric wells. At present, the well field produces approximately 490,000 m3 /day and is planned to produce 1,000,000 m3 /day in the future. Kufra basin, from which Tazerbo groundwater is extracted, is one of four principal groundwater reserves of good to excellent quality fossil water in the middle and south of the country, as shown in Figure 2. High drawdown has been noticed in the centre of the wellfield due to limited pumpage (Max: 500,000 m3 /day).
The pre-stressed concrete cylinder pipe factory located in the northeastern port of Brega is one of just two such facilities in Libya – the other being at Sarir oil district to the south. This makes it a crucial component of the Great Man-Made River, with two production lines making up to 80 pipes a day.
At first, the plant had to rely on foreign-owned companies to do the work. But now, it is government policy to involve Libyans in the project. Nationals are gaining experience and know-how, and now more than 70% of the manufacturing is done by them. With time, officials hope to decrease the foreign percentage from 30% to 10%.
According to the Great Man-Made River Authority:
The primary operational objective is to ensure that inflows to the system match outflow from the system as closely as possible at all times. Under normal conditions, the inflow to the system will be determined by agreed quotas based on the forecast requirements registered by end-users. The influx from the wellfields into the system can vary based on the number of well pumps brought into operation. Any differences between inflow and outflow will be balanced at the Ajdabiya holding reservoir.
The operating philosophy of the Sarir–Sirt/ Tazerbo–Benghazi system provides for overall operational control to be exercised from the main control centre, located initially at Ajdabiya and ultimately at the Benghazi headquarters. Area operations centres located in the operation, support and maintenance facilities at Ajdabiya, Tazerbo, Sarir and end reservoirs will operate as instructed by the main control centre or following defined procedures in the event of a communications failure. A maintenance strategy addresses all aspects of maintenance management, which is organised and carried out to a predetermined plan with support from relevant information systems.
The computer maintenance module supports the maintenance function by allowing staff to plan and schedule work, print maintenance work orders, monitor work plan compliance, record plant historical information, and compile performance reports.
The quality of the water produced in phase one generally conforms with World Health Organisation standards. However, water produced from the Tazerbo wellfield requires treatment. Dissolved carbon dioxide, iron and manganese are removed by aeration at the wellhead sites. At two agricultural projects in the Sarir region, fields have been cultivated using sprinkler systems since 1970. No adverse soil conditions have been encountered, and no significant water quality changes with time have been recorded.
As expected, water losses along the conveyance lines are insignificant, but substantial evaporation losses have been experienced from three balancing reservoirs—estimated to be about 3 million m3 annually. An evaporation retardant or floating solar panels could save about 35% of this. However, additional water losses through the municipal distribution networks may exceed 20%. The latter losses can be substantially reduced by early notification of leaks and rehabilitation of the distribution systems.

Figure 3. Earthworks and pipeline deployment by Tekfen Construction and Installation Co. Source: http://www.tekfeninsaat.com.tr/#/en/projects/al-khufra-tazerbo-water-conveyance-system
Pipe failures and rehabilitation is also critical project component. The phase one system consists of 60% ‘white’ (uncoated) pipes and the remainder ‘black’ (coated with coal tar epoxy). The latter is used in areas initially deemed as corrosive.
Pipes have failed from time to time in the Sarir–Sirt line and the Tazerbo–Benghazi line. Investigations determined that the failures were caused by chloride-induced corrosion of the pre-stressing wires. An extensive survey was then carried out, initially using traditional techniques such as tapping, close-interval potential surveys and potential mapping. Later, electromagnetic inspection and acoustic monitoring techniques were applied. The extent of the problem was then assessed, and it was found that only some of the uncoated pipes were affected.
The next challenge was to rehabilitate the pipelines without interrupting flows. Since phase one has two parallel lines, it was possible to keep the system in operation by diverting the incoming flow of the line being repaired into the adjacent line, in some instances via cross-connections.
A crash programme was implemented to repair only the most severely distressed pipes on the Sarir–Sirt line. This was then recommissioned, following which there was a full-scale rehabilitation of the parallel Tazerbo–Benghazi line. Some pipes that exhibited a lesser degree of stress but could not be replaced at the time on the Sarir–Sirt line are currently being monitored using the acoustic technique. Owing to the bursts of uncoated pipes of phase one, only coated tubes were used on phase two and will be used in future phases.
The Great Man-Made River is a remarkable feat of engineering, but the entire system could collapse if the mayhem in Libya continues. By the time the rebellion against Gaddafi started in early 2011, more than 70 per cent of the work on the GMMR was completed [6]. Still, with the chaos resulting from the subsequent civil war, the project and its web of infrastructure are under serious strain, threatening water supplies to a majority of Libya’s 6.8 million people.
Chronic power shortages in most areas of the country are dangerously impeding the operation of water-pumping stations and wells. The many causes of the current deplorable state of the Libyan electricity sector are relatively well known. They are listed below, in no order, as factors to consider in the design, financing and implementation of the turnaround programme. Many of the causes are interconnected and overlap.
Meanwhile, power blackouts imply people in Libya’s two main urban centres – Tripoli and Benghazi – have to go without water for up to six hours a day, sometimes longer. Farming regions and other parts of the country dependent on the GMMR are similarly affected.
There are deeper concerns about the long-term fate of the GMMR. Though there is a vast amount of water under the desert, it is not being sufficiently replenished. Local officials once said there was enough water to last for several centuries; others warn it could be exhausted within 80 years. The massive aquifer system in southern Libya crosses into the territory of Egypt, Sudan, and Chad.
The claim of “the eighth wonder of the world” could collapse if social pressure, underinvestment and overexploitation of Libyan water resources continue – resulting in a chronic crisis affecting millions of people.
[1] Kuwairi, A. (2006). Water mining: the Great Man-made River, Libya. Proceedings of the Institution of Civil Engineers – Civil Engineering, 159(5), 39–43. doi:10.1680/cien.2006.159.5.39
[2] Libya’s thirst for ‘fossil water’ – BBC BBC NEWS | Science/Nature | Libya’s thirst for ‘fossil water’
[3] Frances Thomas, The GMMR Project: Libya’s achievement and NATO as war criminal party-pooper, OpEdNews, 01 Sep 2011
[4] NATO bombs the Great Man-Made River
[5] Elmabrouk, Faraj. (2006). WATER QUALITY OF TAZERBO WELLFIELD GREAT MAN-MADE RIVER PROJECT.
[6] Trouble ahead for Gaddafi’s Great Man-Made River
One of the critical problems of our industrialized civilization and social-economic systems is the destabilization of the biosphere by artificial emissions, which can no more be controlled and absorbed by natural processes. Increasing emission of carbon dioxide (CO2) has a major impact on global warming. Significantly large quantities are created as exhaust gases from global industrial production – such as cement and steel industries, but mainly from fossil fuel-driven electric power plants – but also as associated gas from oil and gas production. CO2 has not only a negative impact on the environment as the so-called “Greenhouse Gas” – CO2 at higher concentrations is directly “lethal” for the human body.
In the light of current knowledge and technical developments, the only way to reduce those emissions is to separate CO2 and store it underground. There is no other solution – and this solution is technically possible. The industry aims to extract CO2 from exhaust gases and capture it in large quantities in artificial storage in subsurface geological formations [1]. Such underground storages are already geologically very well known and sometimes applied as storages for natural gas in subsurface underground formations, e.g., saline aquifers.

Figure 1. What is Carbon Capture, Storage and Utilization? Source: https://www.iea.org/reports/about-ccus
According to the International Energy Agency [2], carbon capture and storage (CCS) is a central measure to substantially reduce CO2 emissions and meet the target (∼26 GtCO2/year by 2030) sought by the international community. CCS involves the capture of carbon dioxide from point sources of emissions and its injection into geological bodies, where it would be permanently retained.
While the broad deployment of CCS has significant potential for carbon mitigation, there is growing interest in using the trapped CO2 in a way that can create economic value [3], often referred to as carbon capture and utilization (CCU). The most extensive use of CO2 today is enhanced oil recovery, which creates economic incentives for the permanent storage of a large volume of CO2 in geological formations. Apart from EOR, in recent years, CCU has progressively become focused on converting CO2 into carbon-based economically viable fuels and feedstocks, not only for economic reasons but also because these products could reduce the use of their fossil fuel-based equivalents, act as a dense energy carrier for renewable electricity, and be necessary for a net-zero emissions future.
CO2 capture technologies are currently available for removing CO2 from industrial processes and flue gases of power plants. The three main CO2 capture systems associated with different combustion processes are pre-combustion, post-combustion and oxyfuel combustion. In addition to them, CO2 capture during natural gas production can also be considered [4]. Indeed, in the gas conditioning process, CO2 is typically removed from raw natural gas in the Acid Gas Removal Unit (AGRU) in order to meet downstream sales specifications. Many CO2 separation technologies can be successfully applied for both purposes, namely for CO2 capture from emission sources and for CO2 removal from natural gas. This is the case, for example, when considering the conventional chemical absorption process that makes use of aqueous solutions of amines to capture CO2 from flue gases as well as to remove CO2 from natural gas (preferably, if the CO2 content is not higher than 15 mol%).
More recently, some studies have been carried out to identify and understand the similarities and contrasts between the CCS industry and the Liquefied Natural Gas (LNG) export industry. The global LNG trade is expected to grow in a significant way soon, giving a major contribution to the expansion, integration and flexibility of the global natural gas market. LNG production requires a deep removal of carbon dioxide, down to levels of ppm, to meet LNG downstream process specifications allowing to avoid CO2 freezing.
Controlled by Occidental Petroleum (Oxy), the Century natural gas processing facility in West Texas, U.S., is the world’s single biggest CCS plant [5]. Oxy and Sandridge Energy entered an agreement to build and operate the Century CCS facility back in 2008. Built with an investment of approximately $1.1 billion, the plant captures carbon dioxide that is used for the company’s enhanced oil recovery (EOR) projects in the Permian Basin. The CO2 capturing plant began operations in 2010 by commissioning its first train, which has a design capacity of 5 Mtpa of trapped CO2. The second line was commissioned in late-2012 to add an additional capacity of 3.4 Mtpa. The gas captured by the facility is delivered to an industrial hub located in Denver City (Texas) through a 160 km pipeline.

Figure 2. The Century CCS Plant in Texas. Source: Google Earth.
The oilfields which have been developed gradually entered the stage of high water cut and recovery degree in China. The newly discovered oilfields are mainly composed of ultra-low permeability reservoirs and tight reservoirs, which are difficult to be recovered. As a consequence, China faces the severe challenge of increasing or even maintaining oil production; there is an urgent need for a new method to enhance the oil recovery of old oilfields and producing rate of new reservoirs.
In China, as early as the mid-1960s, some laboratory experiments regarding carbon dioxide flooding were carried out in Shengli Oilfield and Daqing Oilfield. Furthermore, in the mid-1990s, some pilot tests were conducted in Daqing Oilfield, Jiangsu Oilfield, Zhongyuan Oilfield, and Shengli Oilfield. During the period of “the eleventh five-year plan”, PetroChina discovered a natural gas reservoir that contains a large amount of carbon dioxide in the Songliao Basin.

Figure 3. Map of the Songliao Basin. Source: https://www.researchgate.net/figure/Map-of-the-Songliao-Basin-showing-the-study-area-in-the-Changling-Fault-Depression-a_fig1_274320962
After years of research, scholars and engineers have deepened two fundamental theories, which are suitable for the Chinese continental sedimentary reservoir of CO2 miscible flooding theory and the storage mechanism of CO2 storage in the reservoir and saline layer. They also formed and developed six key technologies: the reservoir engineering technology of CO2 flooding and storage, CO2 flooding technology with high efficiency of injection and production, CO2 long-distance pipeline and supercritical injection technology, treatment and cyclic gas injection technology of the produced fluid by CO2 flooding, monitoring and dynamic analysis and evaluation technology of CO2, and CO2 flooding and storage potential evaluation and strategic planning. Relevant research results supported the Black 59, Black 79, Black 46, and Yi 59 Blocks in Jilin Oilfield to build five kinds of demonstration areas of CO2 storage and flooding, covering the geological reserves of 12 million 880 thousand tons, 69 gas injection wells groups.
The cumulative gas injection was 970 thousand tons, which has increased 102 thousand tons of oil. The annual oil production capacity reached 121 thousand tons. So it showed significant economic benefits. The CO2 yearly storage capacity was 350 thousand tons, indicating a crucial social significance of greenhouse gas emissions. At present, the technology has been extended to the oilfields in Western China, and Ordos Basin and Junggar Basin pilot tests are being carried out. The prospect of carbon dioxide flooding and storage technology in China is broad.
Tomakomai is Japan’s first full-chain CCS project, which captured and stored CO2 from a coastal oil refinery on Hokkaido Island in Japan. The refinery’s hydrogen production unit produced off-gas containing about half carbon dioxide, which was captured in an active amine process. The venture caught around 0.1 Mt CO2 during each year of operation (2016-2019) for injection into two nearby offshore saline aquifers for storage and monitoring. By the end of the demonstration period, the project achieved its target of 0.3 Mt of CO2 captured and ceased injection as planned. Measurement and monitoring of the stored CO2 will continue during the post-injection stage.
The CCS Demonstration Project is led by Japan CCS Co. Ltd, established in 2008 by major national companies interested in advancing and testing CCUS technology and safety. The objective of this consortium is to implement and demonstrate CCUS projects in the country and investigate associated technologies through international collaboration. The Tomakomai project was commissioned to the Japan CCS Co. Ltd in 2012 by the Ministry of Economy, Trade and Industry, and from 2018 onwards by New Energy and Industrial Technology Development Organization.
Within LNG processing, there are two major CO2 streams where CCS can be implemented: (i) CO2 capture in the gas conditioning process, where the CO2 present in the feed gas is removed, and (ii) CO2 capture from combustion sources (flue gas) from the various gas turbine drivers in the LNG process, particularly the LNG liquefaction process.
Considering the first opportunity, the CO2 captured from the AGRU is already part of CCS, where the CO2 will be sequestrated in a saline aquifer, for example, in two LNG projects: the Snøhvit project and the Gorgon project. The former was constructed to exploit three gas fields (Snøhvit, Albatross, and Askeladd) in the Barents sea: the gas production system uses a subsea production platform, which feeds gas to an LNG processing plant located on Melkøa Island (near Hammerfest, in Norway) via a 143-km pipeline. The CO2 removed from the gas stream is piped 152 km back to the field for injection into an offshore deep saline formation through a dedicated well (it has been reported that around 0.7 MTPA of CO2 have been safely injected and stored since 2008).

Figure 4. The island of Melkøa in Norway. Source: https://commons.wikimedia.org/wiki/File:Melkoya.jpg
The carbon dioxide capture and storage facility lies 2.6 km beneath the seabed of the Snøhvit field and a 153 km pipeline for reinjection [6]. The facility can store 700,000t of carbon dioxide annually. Statoil led the project as part of a consortium of eight companies: Petoro, TotalFinalElf, Gaz de France, Amerada Hess, and RWE-DEA.
The second previously mentioned project (i.e., the Gorgon project) is being constructed on Barrow Island. It will receive its entire feed from subsea wells, as already done in the Snøhvit project, but at a larger scale (the Gorgon project will be a factor 4 times larger than the Snøhvit one in terms of LNG capacity). This project is handling a relatively impure feed stream, with CO2 being one key impurity that has been committed to being sequestered in a saline aquifer below Barrow Island.
Commissioned in 2017, the Petra Nova-WA Parish Carbon Capture Project is located in Fort Bend County, approximately 60 km southwest of Houston, Texas. It is designed to capture roughly 90% of the carbon dioxide from a 240 MW slipstream of flue gas from the Petra Nova power plant’s 610 MW coal-fired unit eight and extract approximately 1.6 million tonnes of carbonated gas a year.
The extracted CO2 is used for EOR at the West Ranch Oil Field located on the Gulf Coast. The process involves the discharge of captured carbon dioxide into mature reservoirs in the property asset to release more crude, making the most of the existing oil field while extending its useful life.
The project is owned and operated by Petra Nova CCS I, a joint venture between JX Nippon Oil & Gas Exploration and Petra Nova, where the former is a wholly-owned subsidiary of JX Nippon the latter is a subsidiary of NRG Energy. Built at an estimated cost of $1 billion [7], the project received $190 m in funding from the US Department of Energy as well as project management guidance from the US Department’s National Energy Technology Laboratory.
When it launches operations in 2024, DAC 1 is set to become the world’s largest direct air capture (DAC) facility. This landmark facility is an important project that can help demonstrate the valuable and singular role of DAC for meeting net-zero goals. DAC 1 is being financed and built up by 1PointFive, a development company created by Oxy Low Carbon Ventures (OLCV). It will be placed in the Permian Basin of the United States.
The facility will use DAC technology from Carbon Engineering, a Canadian company founded in 2009 with the mission to develop and commercialize a technology that captures CO2 directly out of the atmosphere at a megaton-scale [8]. It features a scalable setup including air contactors that pull in atmospheric air, which, in the presence of a potassium hydroxide solution, reacts to bind and separate the CO2. Through a series of chemical reactions, this process yields a pure, compressed stream of CO2 that will be sent to geologic storage sites to remove this carbon from the atmosphere permanently.
In 2021, OLCV awarded the Front End Engineering and Design phase to a global professional services provider. This phase of DAC 1 is focused on a first capture train with a planned annual capture capacity of 0.5 MtCO2; the project’s total capacity will subsequently increase to 1.0 MtCO2/year. The project is backed by a multi-million dollar investment from United Airlines and, upon approvals, two key policies: the United States’ 45Q tax credit and California’s Low Carbon Fuel Standard [9].
SaskPower’s Integrated Carbon Capture and Storage Facility is the world’s first fully integrated and full-chain CCS facility on a coal-fired power plant — precisely on Unit 3 of the Boundary Dam power station (BD3 ICCS). The captured carbon is used for EOR in a nearby oilfield and injection into a deep saline reservoir at a research project called Aquistore [7]. The complete chain cluster of facilities is close to the BD3 facility, providing a full demonstration and operation of proven and safe CCS.
The CANSOLV process, an amine solvent system, was selected as the capture technology for the BD3 ICCS project. As depicted in Figure 5, this process consists of two distinct processes working in series: the CO2 Capture Train and the sulphur dioxide (SO2) Capture Train. The latter is a Cansolv amine-based desulphurization process that extracts 99% of the SO2 from the flue gas. The fixed SO2 is sent to a Sulphuric Acid Plant, where it is converted into sulphuric acid. The desulphurized flue fluid passes through the CO2 Capture Train, where up to 90% of the dioxide is removed. Steam pulled out from the Intermediate Pressure – Lower Pressure (IP-LP) crossover on the BD3 turbine is needed to regenerate the amine in both flows. The CO2 product is compressed to 2500 psi and is conveyed approximately 70 km by pipeline continuously for utilization in the enhanced oil recovery operation at the Weyburn oilfield. Once there, it is injected 1.7 km below the surface into the oil-bearing Midale geological formation – and – on a sporadic basis, CO2 is transported by a 2 km pipeline to the Aquistore site for recharge and long-term geological storage in the Deadwood deep saline aquifer at a depth of about 3.4 km.

Figure 5. Cansolv’s SO2 and CO2 Amine Capture System as Deployed at SaskPower’s BD3 Power Unit. Source: http://dx.doi.org/10.2139/ssrn.3820191
[1] https://www.climatecouncil.org.au/resources/what-is-carbon-capture-and-storage/
[2] https://www.iea.org/fuels-and-technologies/carbon-capture-utilisation-and-storage
[3] https://cen.acs.org/energy/fossil-fuels/Carbon-capture-projects-proliferate/99/i27
[4] Pellegrini, L. A., Guido, G. D., Lodi, G., & Mokhatab, S. (2018). CO2 Capture from Natural Gas in LNG Production. Comparison of Low-Temperature Purification Processes and Conventional Amine Scrubbing. Cutting-Edge Technology for Carbon Capture, Utilization, and Storage, 281–308. doi:10.1002/9781119363804.ch20
[5] https://sequestration.mit.edu/tools/projects/century_plant.html
[6] https://www.hydrocarbons-technology.com/projects/snohvit-lng/
[7] https://www.nsenergybusiness.com/features/top-carbon-capture-storage-projects/
[8] https://carbonengineering.com/news-updates/
[9] https://www.iea.org/reports/ccus-around-the-world/dac-1#abstract
Megaprojects are a part of our everyday life as well as our history. The Great Pyramid of Giza, built almost 4700 years ago by the Egyptian civilization, was a megaproject. Six of the seven wonders of the ancient world were megaprojects at the time of construction (Hanging Gardens of Babylon, Colossus of Rhodes, Temple of Artemis at Ephesus, Mausoleum at Halicarnassus, and Lighthouse of Alexandria, and Great Pyramid at Giza). Further historical examples of megaprojects are the Suez or the Panama Canals, the Pont du Gard, the Colosseum in Rome, or the cathedrals of the Middle Ages. As the initial debate among the Burj Khalifa and Masdar City
Administrators indicate that ancient and current megaprojects are connected with adoration and major obstacles.
At least one megaproject is under construction in almost every region on the planet. Trends toward urbanization and globalization are the primary drivers of megaproject demand. In 1950, 30% of the world’s population resided in urban areas; in 2014, this percentage increased to 54%; and by 2050, it is projected to reach 66% [1]. With a growing world population, approximately 7 billion people will live in existing or new cities by 2050. A primary facilitator of this is the relative abundance of capital to finance more megaprojects than ever before.
This massive movement from rural to urban areas entails construction demands: new cities or new quarters in cities (living, servicing, manufacturing, entertainment, and worshipping), new infrastructure (roads, rail, and utilities), and new logistical hubs (stations, ports, and airports). Globalization requires connections between hubs and shifts facilities from one country to another (e.g., manufacturing or servicing). There are also truly global megaprojects such as China’s New Silk Road (Belt and Road Initiative).
Desjardins [2] provides a list of the seven most significant projects under construction in 2017:
This list is most likely incomplete since nobody collects information about megaprojects systematically. However, these projects show what civil engineers do: planning and constructing the built environment. The built and the natural environments have a common border, and when we expand the built environment, the natural environment will suffer. There are trade-offs to pay while establishing the borderline; it would be naïve to admire the size and grandeur of megaprojects without thinking about their impact on the natural environment.
The town of Al-Jubail on the Eastern Coast of the Kingdom of Saudi Arabia was established around 7000 years ago. The nearby presence of potable water wells ensures the continued viability of human settlement. Crude oil was found in Saudi Arabia in 1933. Jubail staked an even bigger claim to fame in 1983 by establishing Jubail industrial city project as the largest engineering and construction project ever attempted [3]. With more than 170 industrial enterprises and 75,000 inhabitants, Jubail Industrial City is the region’s largest industrial hub.
The Saudi government has widely employed massive oil resources to enhance municipal and industrial development during the last forty years. This was crowned by two giant urban & industrial projects, one of them in Jubail. The planning efforts attempt to provide the funds to control and manage the community’s industrial development and physical growth. The Saudi government employed an independent planning commission known as the Royal Commission for Jubail (RCJ) to achieve planning objectives. This commission undertook the responsibility to design, build and manage large-scale industrial cities. The system of Commissions and Higher Committees was followed and still practiced in the planning of seaports, airports, medical cities, universities, and residential neighborhoods.
In Jubail City, Saudi Arabia, primary industries produced 7% of the world’s petrochemicals, contributed 11.5% of the Kingdom’s gross domestic product and created 85% of the Kingdom’s exports when not considering oil. The Annual growth is sustained at 6%. Therefore Jubail had attracted over 50% of the Kingdom’s total foreign investment (2014 Annual report of the Royal Commission Jubail and Yanbu – RCJY). 87% of Saudi investment was in primary industries, which have reached about 613 billion Saudi Riyals, 68 % was invested in Jubail city [4]. Jubail’s primary industry companies consist of 25 companies.

Figure 1. Saudi petrochemical company (SADAF) complex in Jubail. Source: https://doi.org/10.1016/S0197-3975(01)00026-1
Jubail-1 Industrial City has three industrial sectors, viz., Primary, Secondary and support industries. At the same time, Jubail-2 has Primary, Secondary, support, value park and logistic area. The Primary industrial park in Jubail’s industrialization strategy with hydrocarbon-based and heavy mineral installations. The Secondary industries include products, such as petrochemical intermediates, plastics, steel, agrochemical, etc. Industrial Wastewater treatment network is available in the Primary and Secondary industrial sectors.
The Industrial Area in Jubail envisaged 19 primary industries and 136 secondary industries, and 100 ancillary industries to operate under the capital concentration method. These industries created more than 100,000 jobs by the beginning of the millennium. The industrial city utilizes an estimated 4 billion US dollars’ worth of natural gas, recently considered an expendable product. It also produces steel, aluminum, plastics and fertilizers for local and international markets.
Jubail Industrial City, built more than three decades ago, will double its size once completed upon integrating a second part. With $80 billion for infrastructure works only, Jubail II is allegedly the largest civil engineering project globally [5]. Jubail Industrial II construction is a multi-billion-dollar industrial city aiming to strengthen the petrochemical industry and create social benefits. This project will double the size of the former Jubail Industrial Complex by 6,200 hectares.
Investing more than $4 billion in infrastructure and with more than 20,000 workers during its peak season, the area will be turned into an even larger industrial park, if you couldn’t tell. The work encompasses hundreds of miles of roads, water & wastewater, utilities, and all required infrastructure. At least 18 billion dollars are being intended to build the industrial city, extending from the existing industrial park to the Kuwait-Ras Tanura corridor. The construction process is so extensive that the project has been broken into four phases. Over 50,000 residential units will be appended by 2026 as part of the expansion process. The RCJY has requested Bechtel, who handled Jubail 1, commit to Jubail II.
Over 1,900 hectares will be industrialized during the process, and a combination of highways, tunnels, and superstructures will craft an unobstructed path to development and the mining industry. The earthwork procedure will involve moving more than 30 million cubic meters of aggregates, in conjunction with the installation of almost 4.8-meter diameter pipelines to carry water from the Arabian sea into the industrial facilities at a rate of 200,000 m3 per hour.
Another one of the astounding structures is the desalination plant that will treat 800,000 m3 for cities in the Eastern Province and generate 2,750 megawatts of electricity. The area includes two large seaports built on an artificial harbor protected by 17 kilometers of the breakwater. Bechtel, acting on behalf of the managers of the project, specified that the development also comprises a 9 -by-0.3- kilometer causeway, with a module-import facility, a four-berth open-sea tank terminal, a dry-bulk terminal with nine berths, and a service quay ―all built under contracts to the Saudi Ports Authority.
On a historical scale, Jubail required strategic planning and project management. The workforce peaked at 20,000 per month, completing huge, demanding projects such as:

Figure 2. The massive Jubail-II industrial city accounts for over 7 percent of Saudi Arabia’s GDP. Source: https://www.bechtel.com/projects/jubail-industrial-city/#gallery-11
The proposed transportation system entails a six-lane highway between Dammam and Jubail. This main road is considered the focal commercial area within the project, creating robust and efficient communication systems of all mission components. Hundreds of other roads and paths have been arranged to lead to smaller towns and areas associated with the project. More than 850 kilometers and 60 bridges were built during the construction phase.
The project was meticulously planned decades before, and it was built around large oil pipes erected years before industrial growth began. The total project cost might vary even higher to accommodate changes and requests to expand its operations.
Several countries use desalination, with most desalination plants in the U.S., the United Arab Emirates, Kuwait, France, Japan, and Saudi Arabia. The largest desalination plant is the Jubail Plant, producing 1,401,000 m3/day of fresh water.
Desalination is expensive and energy-intensive, but it is relied upon in hot, water-scarce climates like Saudi Arabia and neighboring Gulf countries. A recent United Nations-backed global study of the desalination industry found the world’s around 16,000 plants produced on average 1.5 liters of brine for every liter of fresh water. Saudi Arabia produces the most amount of brine, at 22% of the world’s total.nAt al-Jubail treated waste brine plumes back into the Arabian Gulf.
Officials hope to be extracting magnesium at one desalination plant and at another to make sodium chloride for use in the petrochemical industry. As of 2020, the government’s Saline Water Conversion Corporation (SWCC) said it had completed the construction of seven new desalination plants, taking its total number of installations to 33. A few more plants are privately operated [6].
Saudi’s eastern coast hosts the record-breaking al-Jubail plant and the world’s largest plant using more modern hybrid technology at Ras al-Khair. These plants serve east coast cities and pipe desalinated water 400km into the desert to the 7 million residents of Riyadh’s capital.
Recently in 2021, the project for the design, engineering and procurement of the new 400,000m3/day Jubail II seawater reverse osmosis (SWRO) plant by SEPCO Electric Power Construction Corporation has been awarded to Metito, a provider of choice for total intelligent water management and alternative energy solutions. The SWCC will commission this state-of-the-art project worth US$132M. The Jubail II SWRO plant is a 24 months project with a commissioning date set for February 2022. The plant will serve Jubail industrial city.
McDermott International Inc has confirmed details of its scope of work on an earlier awarded contract by Advanced Petrochemical Co (APC) for subsidiary Advanced Global Investment Co’s (AGIC) proposed propane dehydrogenation (PDH) and polypropylene (PP) complex at APC’s existing operations in Jubail Industrial City.
McDermott’s Lummus Technology-alongside catalyst partner Clariant International Ltd will license its proprietary CATOFIN PDH technology process and provide the basic engineering package for a C3 CATOFIN unit to be installed at the new complex; the service provider said on May 21, 2020. Once in operation, the new unit will have a propylene production capacity of 843,000 tonnes/y.
McDermott, which reflected the order in its 1Q 2020 backlog, valued the contract at $1-50 M. This latest contract for the project follows AGIC’s contract award earlier inMay 2020 to Fluor Corp for delivery of project management consultancy (PMC) on the complex, which alongside propylene, also will produce 800,000 tonnes/y of PP that will be used for the production of specialty polymers by manufacturers in the facemask, automotive, pipes, food packaging, and textiles industries.
APC also previously confirmed AGIC haslet a contract to LyondellBasell Industries NV subsidiary Basell Poliolefine Italia SRL to license its proprietary Spherizone and Spheripol technologies for the complex’s two PP plants, each of which will have a capacity of 400,000 tonnes/y. Award of the technology and PMC contracts follow AGIC’s March 27, 2020, signing of a shareholders agreement with SK Gas Co Ltd subsidiary SK Gas Petrochemical Pte Ltd (SKGP) to establish a joint venture named Advanced Polyolefins Co (APC JV) for construction and operation of the proposed PDH-PP complex.
At a total estimated cost of about $1.8 bn, the planned PDH-PP project will be financed 25% by shareholders’ equity, while APC JV will fund the remaining 75% via borrowing from lenders, APC said. AGIC will hold 85% interest in APC JV, with SKGP to hold the remaining 15% stake. APC said APC JV expects to begin construction in 2021 on the new PDH-PPcomplex-which will receive its primary feedstock of propane from Saudi Aramco under a long-term contract for a targeted start-up of operations by 2H 2024. According to its website, APC currently produces 455,000 tonnes/y of propylene and 450,000 tonnes/y of PP at its existing Jubail Industrial City plants.
The localities are spacious, well-planned and built for Royal Commission employees. The electrical load profile of the residential compounds can be obtained from Saudi Electricity Company, SEC. This power utility company controls the generation, distribution, and transmission of electricity in Saudi Arabia, and it has more than 45 power generation plants in the country [7].
The scaled annual load demand and the peak load for the compounds have been studied, showing that the peak load can be observed in July. The maximum monthly load is observed in the peak summer months of July and August due to the high air conditioning load, while the minimum is in December and January [8]. The heating load is almost negligible in this part of the world.

Figure 3. Residential compounds site location. Source: https://doi.org/10.1016/j.jclepro.2019.117806
3 References
[1] Brockmann, C. (2020). Introduction. In Advanced Construction Management, C. Brockmann (Ed.). https://doi.org/10.1002/9781119554721.ch1
[2] Desjardins, J. (2017). Nine of the world’s largest megaprojects are under construction. Business Insider, January 11, 2017.
[3] https://www.rcjy.gov.sa/en-US/Jubail/AboutCity/Pages/default.aspx
[4] Al-Ghamdi, M., ABDEL-RAZEK, R. E. F. A. A., & ABDEL-RAZEK, R. E. F. A. A. (2015). The Impact of Human Resource Management on Technological Innovation in Jubail Primary Industrial Sector, Saudi Arabia. International Journal of Business and Management, 3(2), 1-17.
[4] https://www.gbreports.com/files/pdf/_2020/AOG_2020_-_Web_Preview.pdf
[5] https://www.thebalancesmb.com/worlds-largest-civil-engineering-projects-844606
[6] https://www.reuters.com/article/us-saudi-water-desalination-idUSKBN26Y1HD
[7] https://www.se.com.sa/en-us/Pages/AnnualReports.aspx
[8] Baseer, M. A., Alqahtani, A., & Rehman, S. (2019). Techno-economic design and evaluation of hybrid energy systems for residential communities: A case study of Jubail industrial city. Journal of Cleaner Production, 237, 117806.
Africa Oil picked up 50% ownership interest in Petrobras Oil and Gas BV for about $520 million, with the remaining 50% retained by BTG Pactual E&P [1]. To take advantage of the country’s vast deepwater exploration potential, Africa Oil Corp. showed up at the first-ever Nigeria Oil, Gas & Power Conference & Exhibition, where Nigeria’s future gas monetisation activities, downstream diversification, and marginal field licensing round were the subject of two days of discussions and deal-making.
In order to boost the burgeoning domestic oil industry’s expansion, the Ugandan Government plans to invest five billion dollars in the Tilenga and Kingfisher oil fields. The funding is expected to feed over 500 wells and construct two central processing facilities and a water plant. There were also plans to award exploration companies for five blocks by the end of 2020.
In a webinar hosted by AOP and the African Energy Chamber, officials expressed optimism toward Total’s acquisition of Tullow Oil’s long-standing stake in the Lake Albert project for roughly $575 million. This deal brings much hope to the national oil and gas sector, first put in light upon discoveries in 2006.
U.S. Secretary of State Mike Pompeo ratified that several American energy firms intended to invest about two billion dollars into Angola’s O&G projects during a meeting with the Minister of Foreign Affairs. Later this year, the Angola Oil and Gas Conference & Exhibition on June 15-16, 2021, tapped into bankable investment prospects within the country’s most lucrative sector. The two-day event pinpointed offshore oil and gas licensing, market entry, the ease of doing business and digitalisation and oilfield technologies, among other key topics.

Figure 1. Angola’s National Oil, Gas and Biofuel’s Agency (ANPG) Day 1 presentation. Source: https://energycapitalpower.com/wp-content/uploads/AOG_2021_ADM_BC_Presentation.pdf
Following the commencement of COVID-19, Equatorial Guinea’s Ministry of Mines and Hydrocarbons waived fees for oil and gas services companies operating in-country for a period of three months. The waiver was brought in to avoid job losses and grant relief to the sector – which acts as the chief private-sector employer – and served as one of the first actions to be taken in support of the domestic industry.
The final investment decision (FID) by ExxonMobil for the Rovuma liquified natural gas project was postponed to 2021 due to COVID-19. The Area 1 project intends to extract natural gas for liquefaction from a deepwater block offshore northern Mozambique containing more than 85 trillion cubic feet (tcf) of natural gas.
Also, Total secured $15 billion funding for another LNG Project. The French oil giant clinched nearly $15 billion in senior debt financing for its Mozambique venture from financial institutions including Rand Merchant Bank, Standard Bank Group, and Société Générale SA, among others. The project is scheduled to produce 12.9 million tons of LNG per annum.
Angola published Presidential Decree 271/20, which endorsed a new legal regime for local content in the country’s oil and gas sector. The regulation promotes the use of national raw materials, encourages local entrepreneurship, and is anticipated to aid in the republic’s wealth creation and economic diversification.
Total and its partners (Qatar Petroleum, CNR International and South African consortium Main Street) made a new gas condensate discovery on the Luiperd zone located in Block 11B/12B offshore South Africa. The Luiperd-1X deepwater well was safely and efficiently drilled during the coronavirus pandemic and austral winter season. The discovery reconfirms this world-class exploration play with substantial follow-on potential as part of a joint venture operating Block 11B/12B.
The Tema LNG facility in Ghana continued to gain financial traction by December 2020. The Emerging Africa Infrastructure Fund (EAIF) approved a $31-million loan with a 10-year term to a specialist floating LNG infrastructure provider. To date, more than $400 million have been committed to the project, of which $170 million had been utilised by then. The Tema LNG terminal will contribute to power generation solutions for the population, enabling current thermal power generators to transition from reliance on burning light cycle oil and heavy fuel oil to natural gas.

Figure 2. The Tema liquefied natural gas (LNG) import terminal. Source: https://www.nsenergybusiness.com/projects/tema-lng-import-terminal-project/
The world economy and energy markets have been wreaked by the COVID-19 pandemic, with oil found to be particularly vulnerable. In response, affluent countries have accelerated the renewable energy transition through greening policy, economic stimulus and investment. COVID-19 has spurred the pace of energy transitions, according to PwC [2]. Prompted by the COVID-19 global pandemic, the world is finally jolting its commitment to move towards a greener future by this mid-century, and the global energy transition is the cornerstone of this new normality.
This shift to renewable energy will continue to gain momentum throughout the current decade, led by policy shifts towards clean incentives as developed economies begin to “build back better”. The striking global oil demand slump, triggered by economic lock-down and a result of the downgrading of long-term global oil demand outlook, has left African economies under significant increased monetary and fiscal distress, especially those reliant on fossil fuels.
In this shifting scenario, however, there is an opportunity for the continent to take advantage of the inclusive energy transition and the new global markets taking shape. The energy transition provides an opportunity for African nations to address energy poverty, diversify their economies, create new employment sectors and capitalise o the investment incentives out of the developed world.
The buzz word ‘Net Zero’ and the energy transition are significantly transforming the energy and utility sector, with 2020 seeing the five biggest players in oil and gas having written down reserves by 87 billion American dollars, rapidly diversifying portfolios towards renewables and reformulating their business strategies. An illustration of this is BP setting out its strategy to achieve ‘net zero’ by 2050” [3].
The COVID-19 market disruption has given us a new perspective on the importance of a clean and sustainable environment, as well as insight into the future energy system. It has also permanently impacted our behaviour. This commotion and transformation are taking place against the backdrop of increasingly fragile African economies under fiscal pressure from both the immediate pandemics responses required as well as depressed markets and specific declines in fossil fuels production and exports.
The development and early adoption of transparent, regionally aligned national strategies and policy dialogue aimed at exploiting the global energy transition and harnessing the attractive wind and solar array across Africa may be an engaging and sustainable outcome for the continent.
In 2019, the oil and gas industry faced a number of issues, namely a slowing global economy and talk of a possible global recession, the ongoing rise in shale production, the prospect of a deepening trade war, structural surplus of LNG production and concerns over security of supply with increased assaults on production sites.
African oil production saw a modest increase of 0.5% from 2019, amounting to 8.3 million barrels per day. This accounts for almost nine per cent of global production. However, in 2020, production registered a decline of ten per cent relative to the previous year driven by the demand slowdown for exports during the global pandemics. Africa’s proven oil reserves have remained deadlocked at 125.7 billion barrels of oil from 2019 to 2020. Almost 40% of these reserves are located offshore, while 59% are onshore [2]. Proven gas reserves have also frozen at 527 trillion cubic feet between 2019 and 2020 — a third of these reserves are offshore. Production saw a slight increase of <1% from 2018 to 2019. But production declined by nine per cent last year due to COVID-19.
Due to the oil price crash between 2014 and 2016, Africa has seen a significant decline in capital expenditure on production, totalling less than half for the period from 2014 to 2018. Africa’s oil and gas sector exhibited a positive recovery in 2019. However, there has been a significant drop in CAPEX spending, with crucial projects shown in the following image being deferred by one to three years in the past few months.

Figure 3. Major O&G projects in Africa. Source: https://www.theafricareport.com/27566/coronavirus-pandemic-puts-strain-30-major-african-oil-and-gas-projects/
An EITI report stated that in 2017 Senegal produced approximately 17 million m3 of gas. Since then, there have been a few new developments and discoveries, and we expect production levels to increase by 2022. The Ministry of Petroleum and Energy has set up a Gas-to-Power strategy to produce cheap electricity using natural gas as feedstock. Petrosen also expects to see an increase in FDI into Senegal’s oil and gas sector moving forward [4].
The oil and gas industry is still experiencing volatility; however, there are positive signs on the horizon. Over the past few years, the significant change in Africa has been the investment decision by operators to progress in Mozambique. Mozambique is currently receiving considerable attention and has excellent growth potential.
Broadly speaking, in short to medium term, Fugro sees opportunity in Mozambique, Senegal, Mauritania, Ghana, and possibly Angola. In the longer time, we hope that South Africa will gain traction and provide more growth opportunities. It was unthinkable twenty years ago to consider an off-grid natural gas network. Africa can now construct it using our innovative and efficient technologies, which operate as effectively in large producing countries as well as countries interested in importing gas or monetising modest gas reserves.
Others see that South Africa has a disproportionally large fleet of trucks on the road relative to its economy. For instance, Renergen foresees a phase two ‘blue sky’ scenario covering just 0.7% of the demand coming from trucks alone. So, the market is massive, and every litre of diesel that is replaced with LNG has the potential to reduce carbon up to 90%.
Despite challenging market conditions all along 2020, exploration activity restarted in Africa, with the Southern Africa region holding potential in previously unexplored territories. Namibia has received attention from an exploration standpoint, with Total’s Venus delayed due to Covid-19 but due to start in 2020 and Exxon increasing its offshore acreage. ReconAfrica is one of the junior players active in Namibia; formed in 2015 due to a quest conducted by a group of geoscientists and investors who had been looking at source rock opportunities worldwide.
The search led them to Namibia, where they observed a high-resolution aeromagnetic survey over lands of interest within the government database that had not yet been interpreted. Upon data analysis, the team realised they had discovered a large, deep (up to 30,000 feet) sedimentary basin. ReconAfrica immediately licensed 25,000 sq km over the entire new Kavango Basin within the Namibian border and proceeded to bring in a group of investors with expertise in geoscience, finance, and petroleum regimes.
Although Namibia does not have commercial discoveries producing oil and gas yet, its mining experience could give it a regulatory framework and a solid understanding of the extractive industries. The government took it seriously as the Namibian Ministry of Mines and Energy (MME) declared drilling an essential service during the pandemic.
While the energy transition has been a major worldwide disruptor this decade, data suggests that it has had a significant beneficial economic impact and created additional opportunities. Africa can greatly benefit from technological initiatives and learning curves that are funded mainly by the developed world. Despite most countries having ‘greening’ policies in place, implementation is largely lacking, domestic market momentum is low, and governments can’t afford the level of investment or incentives being implemented elsewhere.
Remarkably, some countries have taken steps to implement some form of elementary energy transition policies, plans or strategies. South Africa, Kenya, Algeria, Egypt, and Morocco have been the most hands-on with progressive and clear policies, yet all remain short of their original renewable energy installation targets. Countries such as Algeria, Gabon, Egypt, Angola, and Uganda have updated fossil fuel legislation and regulations over the last three years concerning local content, transparency, government revenue, fiscal measures and other reforms. However, they haven’t always been in line with a broader national energy policy that includes clean energy growth. Various oil and gas exporting countries, specifically Nigeria and Angola, focus heavily on policy accompanying regulation and taxation of the oil and gas sectors, which has detracted from progressing renewable energy policy.
In general, O&G exporting countries do not have acceptable energy transition policies in place and are still largely directing hydrocarbons for domestic power and continued exports. Fast-tracked adoption of low-carbon energy could be the economic game-changer for many African countries. Renewable energy industries have been publicised to have a positive and inclusive economic impact. This provides prospects for developing economies to diversify through, among others, leveraging their natural resources, including wind and solar arrays, but also new-age minerals.
Significant progress has been made in some African countries in terms of policy and planning frameworks. On the other hand, the main issue is exponentially expanding the volume and speed of execution, which raises concerns about the economics of renewable energy in African markets and governments’ shrinking financial capacity. Perhaps a more ‘fair transition’ would be a deeper investment stimulus and focused support for clean energy in Africa by the developed world. This would help hasten positive global climate response, support equitable, sustainable Africa economic growth and thus create a win-win for all citizens.
[1] https://energycapitalpower.com/africa-oil-powers-top-25-of-2020/
[2] https://www.pwc.co.za/en/press-room/africa-oil-and-gas-review-2020.html
[3] https://www.bp.com/en/global/corporate/news-and-insights/press-releases/bernard-looney-announces-new-ambition-for-bp.html
[4] https://www.gbreports.com/files/pdf/_2020/AOG_2020_-_Web_Preview.pdf
Mechanical contaminants, grit, mud, heavy metal compounds, hydrocarbons, tar, and other heavy oil components contained in the oil product will naturally settle during the long storage process of the oil tank due to the specific gravity differential. These elements will pile up in the base of the oil tank, forming a thick and black gelatinous material layer that is storage tank sludge. The sludge will accumulate with the perpetual increase in time of oil transport and storage, influencing the transport and storage of storage tank over period, so it is critical to clean the oil tank on a regular basis, as required by international safety standards.
Chemical cleaning is one of the most effective and prevalent method of cleaning of oil tanks. In chemical cleaning, first of all, the oil is drained from the tank and the oil tank is adequately ventilated and the oil tank is measured to keep the oil and natural gas concentrations within a safe levels. Workers cleaning oil tanks enter the tank to remove oil, mud, and other debris. The tank cleaning machine is used to clean the structure and apparatus.
The most important part of the process is the application of de-rusting and pickling chemicals which removes all the impurities like inorganic compounds, depositions, stains and rust from the surface of the oil tank. This process generally takes around 2 hours but the exact time of cleaning a specific tank depends upon its condition and other factors. After this process, the acid is completely removed from the tank and it is washed with natural whishing liquid. The washing is done for around 30 minutes and it is ensured that the acid is completely removed from the tank.
After removing all the waste the passivation treatment is done in the oil tank for 2 to 3 times depending upon the conditions. The passivation treatment uses an acid solution in order to remove any free iron from the surface of the tank which prevents the rusting of the surface of the tank.

Figure 1 Passivation Process
After passivation the tank is washed with water at very high pressure of around 300 kpa for 10 minutes on average. After that, all the waste is removed from the tank and the inside of the tank is mopped to completely clean up the tank. Then the tank is ventilated adequately in order to remove any moisture or humidity. At the end, the tank is inspected by the professionals look for any faults and to ensure that the cleaning process is carried out properly.
After cleaning the oil tank, no corrosion, pollutants, moisture, or grease should be completely removed from the tank. Following the completion of the oil tank cleaning process, quality check and acceptance should be performed, and the acceptance report must be signed by the concerning parties. Manhole should be sealed and pipes should be connected and the tank should be restored to its original state as soon as possible once it has been accepted. Following the completion of the oil tank cleaning process, the site should be completely cleaned in accordance with rules, and the results should be recorded. Finally it should be ensured that whole process is both safe and effective.
A variety of dangerous situations can arise during the chemical cleaning of oil tanks. This article discusses possible dangers which might take place due to oversight or negligence such as ignition, exposure to chemicals, low oxygen levels, injuries, and exposure to radiation, and offers advice on how to avoid them by taking precautionary measures. [1].
Tank cleaning is a very risky activity. Working in confined spaces, workers are exposed to many hazards, often due to human error, some of which have resulted in injury or even death.
There are many interpretations of confined spaces, but there are also widely used descriptions. A location with no natural ventilation and a hard-to-reach place that prevents rapid evacuation in an emergency.
Indoor work is associated with health and wellbeing and is not recommended for those with claustrophobia, heart or breathing problems, or those physical disabilities. Identifying and eliminating potential hazards in the reservoir cleanup planning phase improves project performance, health, safety and environmental performance. The potential dangers when cleaning tanks are as diverse as the design and physical dimensions of the tanks themselves. We have listed some of the most important errors that lead to a disaster [2].
Cleaning the oil tank with flammable materials poses particular risks. If there is a mixture of vapor and combustible air in the tank, the occurrence of a spark could cause a fire or even an explosion.
The three components of a fire triangle must be related to the explosion. If the oxygen content is kept around 7% or less, the atmosphere is considered inert, and the fire cannot start regardless of the oil content. [3].
Eliminating any combustion sources or reducing the hydrocarbon vapor content below the combustion threshold has the same effect.

Figure 2 Combustion Triangle
When the access ports on a storage tank combustible materials are removed by mistake, the petroleum vapors inside the tank are mixed with air, and the combination reaches a flammable limit. It is critical to remove any possible ignition sources completely.
The ratio of oil vapor to air must be within certain threshold values for combustion to take place. The low flammability limit (LFL) and high flammability limit (UFL) are typically between 1 and 9% for most petroleum products. The general requirement for access to the tank with combustible vapors is 9% LFL. This means that the oil level in the air is actually below 0.2%. Be aware that tanks containing mud, which stir the mud when entered, may release trapped vapors. As a result, the atmosphere can penetrate flammability restrictions.
If this occurs, the only option is to remove workers from the tank until the atmosphere is properly tested at 9% LFL or even lower. Till all the sludge has been stripped away, the tank atmosphere must be monitored closely using appropriate safety continuous monitors installed inside the oil tank. This is especially useful in the early stages of a tank cleaning process.

Figure 3 Upper and Lower Flammable Limits
Any heat source with enough heat to ignite a combustible vapor mixture by bringing it up above its self-ignition temperature. Sparks from electronic systems, thunder, static energy and hot surfaces are all potential combustion sources in and around oil tanks.
The use of electrical appliances, lighting, internal combustion engines and battery systems must be strictly controlled to avoid accidents. Lightning is a great way to start a tank fire. In a lightning strike, all cleaning work must be stopped. Workers must use emergency evacuation methods and then evacuate adjacent tanks.
Static charge is a surface phenomenon that occurs when markedly different materials come into contact and separate. Static electricity can be generated by high-pressure water jetting, vapor cleaning, grit jetting, and air-driven lighting systems, among other things. Nozzles, valves, and other electrically conductive materials should be bound and connected to the ground to prevent static charge concentration.
Smoking and fires must be tightly monitored and permitted only in designated areas. The dangers of hot ventilation systems by placing fueled hardware at a respectable distance from open tank manholes. Steam lines, whether temporary or permanent, should be tended to lag. Other sources of heat should also be identified and eliminated.
Oil tanks containing hazardous chemicals necessitate precautionary measures during the cleaning procedure. Dangerous chemical exposure can occur through contact with skin, inhalation, or accidental intake.
Lead compounds, Sulphides, Polycyclic Aromatic Hydrocarbons, and Formaldehyde are all dangerous chemicals frequently encountered during tank cleaning. Toxic sand particles tend to lag; paint structures, grit blasting, and other processes should also be avoided.
A few of the substances have an instantaneous harmful effect on human health, while others have long-term cancer, causing an effect on worker’s health [4].
The Material Safety Data Sheet should be frequently referred for the product kept when cleaning a tank. Because refined petroleum tanks are not prone to severe sludge formation, the exposure time should be kept to a minimum. It should always be made that anyone accessing the oil tank wears the proper personal protective equipment (PPE).
The safe oxygen level in the tank environment without hazardous and flammable gases is 20%. Below this level, oxygen has to be transported. Oxygen starvation can occur for several reasons, particularly during gas delivery when the tank environment is filled with products.
Some things require an inert gas blanket, such as B. Nitrogen, which is much higher than the liquid level, leading to a lack of oxygen after opening the oil tank. Due to the oxygen consumption in the internal corrosive environment, the oxygen concentration in the washed and then resealed tank can decrease and remain inactive for some time [5].
In any event, oxygen levels should be checked before workers enter the tank without a respirator, and gas sensors should be used to monitor oxygen levels during activity frequently. Failure to follow instructions can be fatal to both workers and the thorough cleaning process.
Workers accessing an oil tank for chemical cleaning face various physical dangers like climate conditions, tripping and obstructions hazards that are unique to the location of the tank and physical design. Any mistake or negligence could result in a catastrophe. To reduce the danger of harm, it is critical to undertake a complete risk evaluation before entry and implement a safe work environment.
Oil Tank cleaners can be exposed to dangerous situations due to the weather. It isn’t easy to control the internal temperature too much, so employees should take regular breaks and drink water and a grain of salt. Loud noise and freezing weather can also be stressful [6].
Because tripping risks and other obstructions abound in oil tanks, workers must fully know the tanks inside architecture before entering. This problem is exacerbated by poor lighting conditions, which are usually difficult to fix due to the flammable atmosphere and the physical size of the tanks.
Other sources of danger include falling debris, slippery surfaces, poor hygiene, head-level obstacles in floating deck tanks, poor maintenance or inadequate equipment, etc., all of which can be reduced through risk assessment and proper training.
Many risks occur when manually cleaning a tank owing to its location and structure, and many more are created by tank cleaning equipment and workers. In an emergency, it should be made sure there is always an unrestrained exit.
The management and workers often ignore these details, and such negligence results in injury and production loss. Therefore, the conditions must not be ignored and should be considered while performing the chemical cleaning of oil tanks.

Figure 4 Sludge Removal Process
A natural radioactive material (NORM) or a specific low activity scale (LSA) can be specified in some crude oil, sludge, and degassing systems. Radioactivity emanates from the formation fluids in the borehole and appears as a radiometer in pipelines transported to reservoirs. The cleaning of tanks with radioactive substances requires special precautionary measures. If you suspect a problem with radioactivity, contact a specialist.
Microbial growth is widespread in the bottom of the tank and sludge where water is stagnant. Infections or allergic reactions might occur in extreme situations. A knowledgeable specialist should be consulted if considerable microbial growth is detected.
The radioactive and other harmful materials must be identified and properly disposed of; otherwise, the failure to do so may result in a catastrophe.

Figure 5 Chemical Cleaning Process
The enormous size of the crude oil deposit (its circumference reaches 130 meters) and the tendency of the crude oil to deposit sludge (approx. 10,000 cubic meters) deserve special attention.
A topographical survey should ensure that the floating roof lands on the mud banks and remove human footprints.
Using conventional methods with a pump, it takes around 400 working days to remove the sludge from a 90-meter long crude oil tank with 2,500 cubic meters of hydrocarbon sludge. These are the 400 working days exposed to many of the risks listed above.
Furthermore, crude oil sludge usually contains more than 90% useful hydrocarbons. This important resource must be retrieved in a usable state.
Dedicated business practices reduce import requirements for humans while extraction of soluble hydrocarbons is good for processing or export. Flood tanks and heavy furnace oil can have similar problems.
Chemical cleaning of an oil tank is a dangerous job with many difficult factors to quantify. Workers should spend as little time inside a tank as a general rule. Workers and professionals often ignore the safety guidelines and proper procedures and make mistakes due to lax attitudes, resulting in injury and financial loss for the organization. Workers participating in such operations should be properly informed and trained in all safety processes and practices. The organization has to ensure that the workers are provided adequate training and proper equipment to carry out chemical cleaning of oil tanks. Training is the key to working safely in confined spaces. Choosing the right cleaning method is an important part of reducing risk. The business methods available include semi-automated and fully automated options. In any case, there is no denying that when automated entry cleaning technologies are used, many risks are drastically reduced, if not completely mitigated. To conduct safe operations, the mentioned mistakes should not be made.
[1] B. Knegtering and H. Pasman, “Safety of the process industries in the 21st century: A changing need of process safety management for a changing industry,” Journal of Loss Prevention in the Process Industries, vol. 22, no. 2, pp. 162-168, 2009.
[2] R. Moradi and K. M. Groth, “Hydrogen storage and delivery: Review of the state of the art technologies and risk and reliability analysis,” International Journal of Hydrogen Energy, vol. 44, no. 23, pp. 12254-12269, 2019.
[3] J. Carter, T. Harrigan, and S. Punwani, “Computer Simulation and Validation of Fire Hazards in Fuel Tanks,” in ASME/IEEE Joint Rail Conference, 2007, vol. 4787, pp. 151-159.
[4] F. I. Khan and S. Abbasi, “Major accidents in process industries and an analysis of causes and consequences,” Journal of Loss Prevention in the process Industries, vol. 12, no. 5, pp. 361-378, 1999.
[5] A. T. Simpson, M. A. Hemingway, and C. Seymour, “Dangerous (toxic) atmospheres in UK wood pellet and wood chip fuel storage,” Journal of occupational and environmental hygiene, vol. 13, no. 9, pp. 699-707, 2016.
[6] J. E. Robinson, D. W. Scott, W. R. Knocke, and W. D. Conn, “Underground storage tank disposal: alternatives, economics, and environmental costs,” 1988.