Hot tapping aims to add or make new connections in an operational pipeline or equipment without disrupting the usual process operation. Therefore, in hot tapping, process equipment is hot tapped as the operation continues. Usually, hot tapping is not desirable as it makes the welding process complicated, but certain situations arise where the process cannot be stopped to perform the welding process. In these cases, hot tapping becomes inevitable. Hot tapping is regulated by certain safety protocols such as API RP 2201 Safe Hot Tapping Practices and ASME PPC-2 protocol. Despite this, certain concerns are associated with the hot tapping procedure including corrosion and material concerns. Hot tapping is a safe procedure if carried out according to the safety protocol. But in some cases, hot tapping is carried out in critical processes such as in refineries where a reactor or a pipeline working on flammable material is hot tapped. In such cases, the chances of corrosion or cracking of the oil/gas are present. Other such cases where corrosion and material concerns are present in hot tapping include taps of containers containing sour water and low alloy steels.
According to OSHA standards, hot tapping in oil refineries should be performed only when the following conditions are met:
In case any of the following standards are not met, hot tapping in refineries cannot be performed and alternate welding methods should be carried out.
Due to difficult shutdown, hot tapping is a common process in oil refineries these days and it is performed routinely. However, some concerns are still relevant and need to be addressed. To avoid these concerns, the following three areas should be carefully addressed:

Figure 1. Hot Tapping is being performed
Oil refinery industries have specific and unique considerations for hot tapping procedures. In oil refineries, when a hot tapping procedure is performed certain limitations and special requirements are added to the process which is not present in the other hot tapping procedures. These special requirements in the oil refineries are based on the following conditions:
Following are the different concerns related to corrosion and materials involved in the hot tapping process in the oil refineries.
Flammable services have a major concern for hot tapping procedures. These include the involvement of oxygen, air, and gas mixtures, air services in the presence of lubricants or other oil mixtures, and the involvement of materials such as ammonia, acids, chlorine, and sulfur in which heat involved in welding can cause decomposition of the stock gases/oils. Moreover, as oil refineries carry exothermic hydrocarbons such as propylene and xylene, they can decompose due to the high temperature of the hot tapping process. To reduce the present risk of air ingress, the flair lines must be reviewed to rule out the presence of any trapped air before the hot tapping procedure is carried out. In case air is present, nitrogen could be purged in the system to remove the resident oxygen.
Hot taps should be avoided where materials such as amine, carbonates, hydrofluoric acids, and other acids are used. In these cases, PWHT is usually required. Cracking is caused due to high temperature and internal stress on the surface. This cracking could result immediately after the welding process. When hot tapping is performed without PWHT, cracking chances are increased. The material conditions when cracking can occur after hot tapping is given in the material safety standards such as API RP 571 and NACE SP0403. In addition to these, other materials may also be prone to hazards during hot taps. These are but are not limited to nickel-copper alloys, austenitic SS, and chlorides. In case these materials are present, hot taps should be avoided.

Figure 2 Corrosion Challenge in Hot Taps
Environmental cracking could also happen due to a high-temperature hydron attack (HTHA) before performing a hot tapping procedure at the oil refineries. Therefore, before using the hot tapping process in such a situation, a complete review should be carried out to rule out the chances of HTHA. To perform a review, the existing pressure and temperature conditions could be matched with the safety guidelines mentioned for HTHA in API RP 941. However, in most cases, the chances of HTHA due to welding heat are negligible as it has a specific incubation time in which the favorable conditions for HTHA are developed.
The presence of hydrogen sulfide in the pipeline can also cause cracking and degradation if hot tapping is performed. Pre-existing H2S blisters could poop up when the tap is performed. To avoid these blisters, a prior inspection could be carried out. Sulfide stress cracking is also a similar issue that can arise during a hot tapping procedure. This type of cracking is more prone in pipelines and vessels. Several hot tapping modeling software is available that can help in the identification of this type of cracking before performing the actual operation. Hot tap modeling requires parameters such as thickness, flow rates, temperature, and heat capacity.
Another type of material concern is stress-oriented hydrogen-induced cracking (SOHIC). This type of cracking occurs in weld stress zones. To avoid SOHIC, after the welding has been carried out, a PWHT could be performed. This results in lower stress from welding and reduces the risk of cracking.
It is challenging or impossible to hot tap lines that operate at lower temperatures because, even with preheating, the minimum temperature for welding of 10°C (50°F) may not be able to be reached. There is a significant risk of hydrogen cracking while welding at lower metal temperatures. All hot tap welding should be done with low hydrogen electrodes, which help to lessen the chance of cracking at lower temperatures but do not completely prevent it. Depending on the stock temperature, heat capacity, flow rates, etc., and the number of heating coils utilized, it may be possible to achieve preheat to 10°C (50°F), or above the ambient dew point if it is lower than 10°C (50°F).
Before beginning to weld, the preheat should be measured. If the desired preheat cannot be accomplished, either more insulation and coils can be added while the temperature is still being monitored, or the hot tap attempt should be given up. Welding is once more impractical at high temperatures, and safety considerations exist for shielding the welder from hot surfaces. The hot tapping contractor will decide on a case-by-case basis what the high-temperature restriction is.
Under vacuum conditions, hot work on the piping or equipment may not be appropriate because the heat from welding could cause the pipe or vessel wall to buckle, collapse, or let oxygen (and possibly flame) into the vessel. Before performing a hot tap on vacuum services, API RP 2201 mandates that a particular engineering analysis be performed to assess these risks. Numerous operating businesses forbid welding on active or potentially vacuum-functioning pipes or equipment.
Hot tapping is still not advised for other hydrocarbon services without hydrogen because the welds won’t receive PWHT. Hot taps, though, have been used in some carefully planned situations in the past, but they were only meant to be “temporary.” One important aspect was that the high hardness weld was protected against hydrogen cracking and/or brittle fracture as long as the welds were maintained at the service operating temperature. PWHT should be carried out after the initial shutdown after the system has cooled (with the pressure being lowered throughout the cooling phase). Until the shutdown, the owner must make sure that the weld is kept above at least the alloy’s usual preheat temperatures. To guarantee the hot tap is treated at the following shutdown, special tagging and documentation should also be made (planned or unplanned)
One issue with hot tapping coated pipes or containers is that even if the new attachments are made of higher alloys, the bore of the cutout area, where the coupon or cookie was removed, would leave bare carbon steel exposed to the process. Concerns about corrosion, cracking, or exposure to temperatures over design can result from this. There are circumstances in which these worries can be resolved and/or temporarily accepted, but this should be done case-by-case with a comprehensive engineering examination. The corrosion rates can be estimated (with a safety margin) to establish a service duration restriction if the only corrosion rate issue is high corrosion rates on the exposed carbon steel. The hot tap needs to be marked as “temporary” and properly documented. The hot tapped item must be turned off and a proper repair must be completed within the allotted time frame.
The heat from the hot tap welding will likely cause the lining of organic linings (such as integrally bonded epoxies) and other lining materials to deteriorate on the internal surface across from the hot tap welding (including across from the fillet welds at the borders of the hot tap reinforcing). The base metal will likely no longer be shielded from use and be vulnerable to moderate to high rates of corrosion. To establish a service duration restriction as previously discussed, the corrosion rates should be predicted (with a safety margin). Only non-hazardous utilities, like water, normally permit hot tapping of components with organic linings.
If the organic liner is “loose”—that is, not completely attached to the base metal—hot taps shouldn’t be used. The risk of the loose liners—organic or metallic—distorting during cutting and maybe getting caught in the hot tap cutting machine is very significant. Additionally, if an inner liner perforation is established, the stock could go well beneath the liner with a significant danger of increasing corrosion or other degrading processes.
Hot tapping should typically not be permitted and should only be done after a thorough technical review on an individual basis for materials that have unique welding needs that would be challenging to regulate with hot tap welding. One instance is duplex stainless steel, which has specifications for minimum and maximum heat input as well as interpass temperature limits. These specifications are easy to meet with conventional welding, but hot taps may make them impractical or impossible to meet, depending on the stock temperature, flow rates, heat capacity, etc.

Figure 3. Material and corrosion concerns in hot tapping
The hot tap welds should be inspected in accordance with the relevant codes and standards, the Owner’s specifications, and the hydro testing that is normally necessary (provided that the safety precautions indicated in API RP 2201 are followed). Visual inspection, magnetic particle testing (for magnetic materials), and dye penetrant inspection ought to be the absolute minimum. This inspection must be performed on both the root and cap sides of branch connection welds.
The required inspection must frequently be performed at least 24 hours after the welding is finished if there are concerns that the steel may be charged with hydrogen and may be susceptible to delayed hydrogen cracking (during this time, no cutting or actions that restrict access to the weld shall be taken). Depending on their sizes and configuration, some branch connection welds can also be tested using ultrasound. Although it is usually impractical to test the weld heat-affected zones on production welds, hardness testing can be done on the weld deposit.
When hot tap welding, the safety concerns should be carefully considered both during the welding process and during any following servicing. Burn-through and hydrogen cracking are the main welding safety issues for all services. Various industry standards, including API RP 2201 and ASME PCC-2, are covered as well as ways to evaluate and reduce these hazards. Whenever these dangers cannot be avoided (e.g. if the pipe is too thin), hot tapping should not be done.
There are many particular services and/or materials used in refineries that shouldn’t be hot-tapped, while others should only be done after performing a thorough engineering review and maybe being deemed “temporary.” There is a table of these unique products and services along with the arguments against them. Hot taps in stress corrosion cracking services or on Cr-Mo materials are a couple of the situations in which they may present concerns during subsequent service. To make sure that temporary hot taps are correctly examined, repaired, post-weld heat-treated, or replaced as necessary, at the following turnaround, they need to be labeled and included in worklists for the next turnaround.
Shargay, C., Daru, K., & Desai, J. J. (2017, July). Hot Tapping in Oil Refineries: Corrosion and Material Concerns. In Pressure Vessels and Piping Conference (Vol. 57991, p. V06AT06A078). American Society of Mechanical Engineers.
Shargay, C., Daru, K., & Desai, J. J. (2017, July). Hot Tapping in Oil Refineries: Corrosion and Material Concerns. In Pressure Vessels and Piping Conference (Vol. 57991, p. V06AT06A078). American Society of Mechanical Engineers.
Buller, A. T. (2009). Oil and gas technologies. In Technology Guide (pp. 318-323). Springer, Berlin, Heidelberg.
Jarvis, W. A. (2004, January). Development and Application of Large Three-Way Hot Tapping Fittings. In International Pipeline Conference (Vol. 41766, pp. 1529-1542).
Agarwal, S. C. (2004, January). Conversion of Old Crude Oil Pipeline to Product Service. In International Pipeline Conference (Vol. 41766, pp. 791-795).
Onuoha, F. C., Ekene, E. G., & Enyiazu, C. (2017). UNBRIDLED PILLAGE: THE POLITICAL ECONOMY OF OIL THEFT IN NIGERIA. SOUTH EAST JOURNAL OF POLITICAL SCIENCE, 1(1).
Onuh, P. A., Omenma, T. J., Onyishi, C. J., Udeogu, C. U., Nkalu, N. C., & Iwuoha, V. O. (2021). Artisanal refining of crude oil in the Niger Delta: A challenge to clean-up and remediation in Ogoniland. Local Economy, 36(6), 468-486.
Wood, M. H., Arellano, A. V., & Van Wijk, L. (2013). Corrosion related accidents in petroleum refineries. European Commission Joint Research Centre, report no. EUR, 26331.
Akselsen, O. M., Fostervoll, H., & Ahlen, C. H. (2009). Hyperbaric GMA welding of duplex stainless steel at 12 and 35 bar. Welding Journal, 88(2), 21-28.
Any process that has to concentrate (purify) a stream by eliminating water or another solvent utilises evaporation. The evaporation process consumes a lot of energy. Thus any approach to designing an evaporator system should consider heat recovery and the total utility use in the final design. The system design must take product qualities into account as well; many might change during evaporation, particularly in a Food and Beverage application.
Many different industries or processes employ evaporators, including:
Each chemical species has a different boiling point and evaporates at a specific temperature; this principle is utilized in an evaporator for purification purposes. The chemical ingredient is initially put into the evaporator, then heated and transforms into a gaseous state (vapor). In a multi-effect evaporator system, the residual portion of the chemical is condensed and fed into another evaporator.
Evaporators come in many shapes and sizes and are selected based on technical requirements. Some prominent evaporator types are given below:
a) Natural circulation evaporator
b) Thin-film evaporators
c) Long tube vertical falling film evaporator
d) Long tube vertical raising film evaporator
e) Plate type evaporator
f) Horizontal tube evaporators
g) Inclined tube evaporators
h) Compact evaporators
i) Flash evaporators

Figure 1: Schematic of long tube vertical falling film continuous evaporator
The best evaporator type selection is dependent on several variables. These include, but are not limited to, i) throughput, (ii) solution viscosity, (iii) product and solvent properties (e.g., corrosiveness, heat sensitivity, etc.), (iv) fouling attributes, and (v) foaming properties.
Some other important factors are as follow:
Tube materials, tube arrangement, tube size: tube arrangement, length and diameter are determined by the hit-and-trial approach, whereas the tube material is selected based on the corrosive effects of the chemical/mixture under process and working scenarios.
Coefficients of heat transfer: heat transmission to the shell from the liquid side is often much higher. The rate of heat transmission is determined by a coefficient known as the latent heat transfer coefficient.
Operating temperature: temperature sustained for the specific metal vessel operation.
Operating pressure: the pressure that ordinarily exists at the vessel top. It should be less than any pressure-relieving device’s design or set pressure.
Maximum Allowable Working Pressure (MAWP): The MAWP is the highest pressure at which equipment can be used safely. A vessel’s MAWP is its maximum allowed pressure in its normal working state at a certain temperature, often the design temperature.
Thermal expansion: The mechanical design of equipment is substantially impacted by thermal expansion between various elements. How tubes are attached to the tube sheet may also depend on thermal expansion.
General assumptions for designing an evaporator:
Heat transmission, vapor-liquid separation, and effective energy use are the three main factors of evaporator design.
The following calculations are for a Natural Circulation Evaporator, although they can change depending on the column type.
a) The number of required tubes (N)
No. of tubes = Heating surface / π x Effective Length Mean x Diameter
where,
Effective tube length = Tube length – 2(Tube plate thickness) – 2(Tube allowance for expansion)
b) Tube plate and Downtake diameter
The area occupied by tubes in tube plate:
Tube plate area for tubes only (AT) = (Tube Pitch2 x 0.866 x Total Tubes / Proportionality factor) x %allowance.
Down take diameter:
Final tube plate diameter = √ [ 4/π x (Area of the Tube plate for tubes + Downtake area)]
c) Diameter required for vapor entry and Calendria in radial steam/vapor entry
Each steam entry diameter= √ [ (4/π) x (Area for the vapor entry / No. of vapour entries)]
Diameter of calendria at the point of radial steam entry = width of the steam entry + final tube plate diameter.
d) Vapor outlet pipe diameter
Vapor outlet pipe diameter = √ [vapor volume / (velocity of vapor x 0.785)]
e) Diameter of the condensate line
Each condensate line diameter = √ (Volume of the condensate / (velocity of condensate x 0.785).
Each non-condensable gases line diameter = √ (Total area of non-condensable gases /0.785 x no. of points)
In absorption (also known as gas scrubbing, gas absorption, or gas washing), one or more species transfer from the gas phase to a liquid solvent. Solutes or absorbates are the species that are transferred to the liquid phase. In order to separate gas mixtures, remove contaminants, or recover valuable substances, absorption is utilized. In the stripping process, absorbed solute from the solvent is extracted. Absorbers are typically employed in conjunction with strippers to enable recovery (or regeneration) and recycling of the absorbent. When utilized as the absorbent, water is often isolated from the solute by distillation rather than stripping.
The absorption process can be performed for any of the following purposes:
a) Separation of high-value components
b) As a step in the synthesis of certain chemicals
c) To get rid of undesirable elements (pollutants)
Physical equilibria control physical absorption, and the mass transfer proceeds only by diffusion.
In this absorption type, a chemical reaction starts as soon as a certain element comes into touch with the liquid that is absorbing it. The diffusion rate is then improved by lowering the component proportion in the liquid phase.
For purposes of absorption, there are two basic categories of absorbers: Plate Column and Packed Column.
The plate column has the following characteristics:
a) Various gas and liquid flow rates can be handled using plate columns.
b)More precise prediction of plate efficiency.
c) The plate column operates very smoothly.
d) The plate column can have a cooling arrangement.
e) The plate column provides stage-wise contact.
f) Even if the tray is sealed off, it is simpler to clean when the liquid produces fouling or the deposition of particulates, and manholes can be installed above the plate.

Figure 1: Plate column schematic
The characteristics of the packed column are given below:
a) Low-capacity activities are better suited for packed columns.
b) The field of vacuum distillation benefits greatly from packed columns. Column pressure loss is crucial to reduce the temperature and pressure at the bottom of the column.
c) Packed columns facilitate low liquid hold-up, making them suitable for separating compounds sensitive to heat.
d) Packing can be the sole solution if corrosion is an issue.
e) A packed column has a lower pressure drop per unit length.
f) The packed column keeps the liquid and vapor phases in constant contact.
g) Packed columns can handle the foaming system.
h) Almost every material is a viable option for modern high-capacity pickings.
i) The employment of low-weight and high-capacity packing results in a packed column with a lower overall weight.

Figure 2: Packed column schematic
a) Plate columns operate worse when using a foaming system. Anti-foaming substances can be used to reduce foam.
b) The liquid holds up quite well. Consequently, there is a significant pressure reduction.
c) The price of the plate column for corrosive liquids is costly owing to the usage of corrosion-resistant material.
d) The required supporting structure is relatively costly.
a) Predictions of HTU (separation effectiveness of the particular packing) and HETP (packing height that can provide same separation as an equilibrium stage) could not be particularly accurate.
b) For very low liquid flows, packed columns are not appropriate.
c) It is challenging to provide cooling arrangements in densely packed columns.
d) In a filled column, side streams cannot be removed.
a) It must be chemically inert to the fluids intended to use in the tower.
b) It has to be strong but not too heavy.
c) It must have sufficient channels for both streams that do not cause excessive liquid hold-up or pressure loss.
d) It must ensure that the liquid and gas make excellent contact.
e) The price has to be reasonable.
Most packaging comprises harmless, low-cost, and relatively light materials like clay, graphite or porcelain. Some limes employ thin-walled metal rings consisting of steel or aluminum. Some common packings are shown in Figure 3.

Figure 3: Some common packing types
An absorber column design involves several processes requiring theoretical and practical expertise. Some selection criteria or designing steps have been elaborated in the above sections (e.g., column type selection, packing types, etc.), and some steps are added here with brief details. Steps that require complex calculations are skipped here to enhance understandability.
a) Determining the estimated column diameter
b) Selecting the column type
c) Determining the material and packaging
d) Estimating the packing size
The largest size of packing that is frequently utilized is 50mm. Costs for smaller sizes are noticeably more than for bigger sizes. Poor liquid distribution and decreased absorption rate might result from too much packing in a small column. Size ranges that are recommended in the literature are:

e) Calculating column actual diameter
f) Calculating the flooding velocity
Depending on a column’s loading point, flooding velocity is determined. It is when the gas velocity is high enough to cease the flow of the liquid. Once the flooding point is reached, the pressure begins to fall considerably more quickly when the gas absorbs all the liquid. The flooding velocity is the gas velocity at this location (limiting velocity).
McCabe & Smith stated that the operating velocity should be between 50% to 90% of the flooding velocity.
g) Determining the no. of transfer units (NoG)
The Cornell Method and the Onda Method are the two approaches that can be applied. The following illustration shows the steps:

Compared to Onda’s method, Cornell’s is much simpler because some of the values have been presumptive. Though it may take longer to compute, Onda’s Method offers a more precise design.
h) Measuring the packing’s height
i) Determining the column’s height
j) Measuring pressure decrease
Each step that has been described here contributes significantly toward the final column design.
Hot tapping is a technique for connecting a mechanical or soldered branch fitting to in-service piping or equipment and drilling or cutting a part of the pipe or equipment within the connected fitting to create an aperture. Forming a new connection to an already pressurized pipe or vessel without halting or emptying that segment of pipe or vessel is known as hot tapping. This implies that a pipeline can keep running while maintenance or repairs are being carried out.
In the hydrocarbon industry, hot tapping is widely used. Due to the delays in product supply to clients and other facilities, shutting down pipelines is typically challenging. A hot tap can connect new links to an already operational pipeline without disrupting the flow. It can also be used in conjunction with line plugging to redirect circulation around a line or piping segment that is being repaired or maintained.[1]
A hot tapping procedure is a high-risk activity that should not be performed on a regular basis. It must only be carried out if a facility closure is not possible – an evaluation that takes into account a variety of factors,[2] including:

Before carrying out a hot tap, careful planning and design must be carried out. This will require creating several documents for the customer and other stakeholders to examine and approve. The following are some of the documents to prepare:
Although hot tapping technology has advanced significantly over time, there are still a number of limits in place to ensure the process’s safety. It should be emphasized that these limitations differ per company and are also reliant on the capabilities of hot tap equipment and staff.[3]
In most cases, hot tapping should be avoided on:
Before completing a hot tapping procedure, this section emphasizes some of the most important prerequisites. Though every hot tapping process is distinctive and should be assessed on its own merits, these factors provide a good starting point.
The most prevalent sort of hot tapping activity is tapping into pipelines and pipework. The following are some requirements:

Welding on the outside of a container or tank poses the greatest risk of igniting a flammable environment in the vapour region just above the liquid surface. Additional parameters must be met in order to effectively execute a hot tap into a tank or vessel. The following are some of these requirements:
For soldering work in a hot tap, a welding technique must be designed. All welders must be qualified according to the relevant standards and requirements. Welders with prior experience may be given preference. Welding should not be authorised closer than inches of flanges or threaded connection, or roughly 3 inches to a welded seam unless judged acceptable by an engineering assessment. Before connecting the hot tap machine, all welds must be visually examined and tested. Pressure tests may be performed to evaluate weld integrity instead of dye penetrant testing, ultrasonic inspection, or magnetic particle inspection (MPI).
To ensure the integrity of welded joints, they must be tested. A hydro test should be performed to test welded connections according to applicable regulations if the heat of the piping, pipeline, or tank allows it. The test level should be at least 10% higher than the pressure range; nevertheless, if an internal breakdown is expected, the test pressure should not be more than 10% of the operational pressure. According to appropriate codes, the test pressure may be lowered. If the temperatures do not allow for a hydro test, the weld may be treated with air or nitrogen mixed with a soap solution.[4]
When doing hot tapping, outside loads are a major problem. The impact of external loads on the pipe must be properly assessed and reduced. When hot tapping, the weight of the equipment and the people doing the work may be distributed evenly or unevenly on the pipeline, resulting in pipeline failure. To counteract the influence of external loads, all pipes be hot tapped should be suitably supported. Additionally, the damaged pipeline should be used while doing this assessment.[5]
Both the hot tapping equipment, the fittings, and the pipeline must be kept at a safe temperature. There are also are hot tap devices that can withstand temperatures of up to 300 degrees Celsius.
Qualified workers must examine the highest metal temperature arising from the hot tapping procedure. Prior to beginning welding activities, the minimum ambient temperature should be determined. Welding should not be done when the ambient temperature is below -50°F (-45°C) unless specific precautions are followed, as indicated. Provision of temporary welding shelter and space heaters are among these safeguards.
A welding technique must be created, specifying whether or not preheating is necessary, as well as the electrodes that will be used for welding.
It is necessary to determine the maximum temperature that can be reached as a result of welding. This will be calculated based on the pipe’s actual wall thickness. The maximum temperature must take the reactivity of the fluid being conveyed into account.[6]
It’s critical to pick the right spot for the hot tap. Locations for hot taps must be easily approachable and free of impediments. If there are filters, strainers, or traps placed downstream of the hot tap position before the equipment, hot tapping may only be done upstream of moving equipment (pumps, compressors, etc.).
In contexts of temperature and pressure, hot tap machines will be rated appropriately. To guarantee that the coupon is cut continuously, the hot tap machine must be positioned on the valves and connected with the fitting.
The total travel distance of the equipment is an important feature to consider when choosing a machine. Each machine has its own version of this.
It must be ensured that the chosen machine can travel the appropriate length from the hot tap valves until the full coupon is cut before hot tapping may begin.
The formula below may be used to calculate the total travel distance. This calculation should be tweaked to fit the needs of each application. Assume the Cutter’s position right after cutting the full coupon and a short distance to ensure that the coupon has been cut.[7]

[1] C. Herckis, “Understanding hot tapping and plugging as an effective procedure to facilitate relocation, repair, or modification of water infrastructure when uninterrupted operation is necessary,” in Pipelines 2018: Utility Engineering, Surveying, and Multidisciplinary Topics: American Society of Civil Engineers Reston, VA, 2018, pp. 63-73.
[2] C. Herckis, “Hot Tapping and Plugging in New York City: A Method to Maintain Service and Protect the Marine Environment during Reconstruction of a Major Sewage Pumping Station and Treatment Plant,” in Pipelines 2011: A Sound Conduit for Sharing Solutions, 2011, pp. 372-381.
[3] C. Herckis, “In Service Welding and Hot Tapping and Plugging Enable Operational Safety of High-Pressure Natural Gas Transmission Line River Crossings in Bolivia and Mexico,” in Pipelines 2013: Pipelines and Trenchless Construction and Renewals—A Global Perspective, 2013, pp. 1620-1634.
[4] R. Felix, W. Bruce, and P. Threadgill, “Development of procedures for hot tap welding onto sour service pipelines,” in International Arctic Technology Conference, 1991: OnePetro.
[5] D. J. J. P. G. J. Hicks, “Guidelines for welding on pressurized pipe,” vol. 210, no. 3, 1983.
[6] H. W. Mishler and J. J. O. G. J. Kiefner, “Study compares hot-tap welding methods,” vol. 79, 1981.
[7] Y. Ogayu, “Confirmation of Validity of Hot Tapping Welding,” in ASME Pressure Vessels and Piping Conference, 2009, vol. 43703, pp. 175-179.
Waste is generated in every facility. The quantity of waste generated increases as the number of activities increases. As the number of occupants increases for residential apartments, the waste also generated increases. Waste might be in the form of solid, liquid, gas or a mixture of any three. The generated waste may also be organic or inorganic.
Waste generated in a facility must be appropriately disposed of. The conventional disposal method engaged is to use the waste for landfills. Due to the pollution, alternative means of treatment, recycling and reusing wastes have continuously been developed, including waste incineration.
This article aims to give a general overview of waste incineration, focusing on non-hazardous waste. Typical components of fixed hearth incinerator will be discussed.
This article aims to give a general overview of waste incineration, focusing on non-hazardous waste. Typical components of fixed hearth incinerator will be discussed.

Figure 1: Waste Dump
The definition of waste can vary depending on the context. Waste can be summarily described as a substance unsuitable for its original use. Materials and substances intended to be recycled may be termed waste by the holder, while the recycler may term them as materials to produce other materials.
Waste is generally categorized as hazardous and non-hazardous waste.
Waste that has the potential to cause harm to the environment and human are termed hazardous waste. Hazardous waste is mostly generated from industrial production and activities. They require special handling and different treatment from non-hazardous waste.
The treatment and recycling of these types of waste are a function of their physical and chemical properties. The main characteristics of hazardous waste are toxicity, corrosiveness, ecotoxicity, flammability and explosiveness.
Hazardous liquid and powder waste require special treatment, handling and packaging to avoid dispersal of the waste.
A possible method of treating hazardous waste includes incineration or high-temperature treatment, recovery and recycling, Chemical treatment and safe storage. The focus of this article is on waste incineration. Below are some of the hazardous waste
These types of waste usually consist of medicines, pharmaceuticals, chemicals, bandages, body parts, body fluids, etc. Medical waste is very dangerous and can be infectious, containing harmful microorganisms such as bacteria, viruses, and fungi, including organisms that may be drug-resistant. These types of waste are usually incinerated at a very high temperature beyond which no microorganism can survive. Medical waste incineration is not performed inhabitable areas; they are usually incinerated in dedicated isolated areas to reduce contact with the waste.
E-waste may also be referred to as E-scrap, electronic waste. These terms describe all wastes associated with used electronics that have reached or neared the end of their useful life. They are usually appropriately discarded or recycled. Most electronics waste is supposed to be recycled, reused or refurbished to reduce the chances of ending up in landfills or improperly disposed of.
Unsafe handling of E-waste can harm human health and the environment. For example, open disposal and burning of electronic materials and components can result in harmful materials leaching into the environment and exposing people to high-level contaminants, including lead, mercury, arsenic, and cadmium, leading to various degrees of health complications, including cancer.
These are waste resulting from industrial activities such as production activities. These types of waste are very common in oil and gas production and storage facilities. Usually, they contain a high quantity of hydrocarbon, which can be very harmful to people and the environment. A typical example of this type of waste is sludge recovered from liquid hydrocarbon storage tanks. This waste is recovered in large quantities and must be appropriately disposed of according to established regulations and procedures.
Radioactive waste is one of the most dangerous waste with the ability to cause complicated medical and genetic effects. The treatment, handling, and storage of radioactive waste are more complicated and, therefore, not covered in this article.
All waste that has not been classified as hazardous is called non-hazardous waste. These waste may include organic waste, beverage cans, plastics, papers etc. it should be noted that solid non-hazardous waste can have health and environmental impact if not properly collected, stored, treated and recycled. The major bulk of non-hazardous waste is categorized under municipal waste, which includes the following.
A higher percentage of non-hazardous waste is organic waste.
Organic waste is waste resulting from biodegradable materials and comes from either a plant or an animal. Organic waste can be broken into carbon dioxide, methane or simple organic molecules. Typical examples of organic waste include food waste, food-soiled papers, green waste, wood waste etc. Most organic wastes are usually incinerated.
This waste results from packaging materials. The most common source of this is single-use food packaging, including plastic bottles, takeaway packs, disposable cups, disposable carrier bags, etc. A high volume of the materials is made of inorganic compounds. Packaging waste constitutes a menace in our environment, blocking drainages, water channels, etc. There has been a significant effort to reduce the number of packaging waste by encouraging recycling and reusing these materials.
Though packaging waste can be incinerated, the most efficient way of managing packaging waste is the reuse and recycling of packaging materials
Other waste non-hazardous waste include metals, glass etc. these materials though might t is not harmful to health they, constitute an environmental menace if not properly stored or disposed
Incineration is a waste treatment process that entails combusting waste material at a very high temperature. Incineration and other waste treatment processes that entail high temperature are also termed thermal treatment of waste. At the end of the combustion, the waste is converted into ash, flue gas and heat. The ash may be in the form of solid lumps or carried as particulates in the flue gas.
Before flue gas are released into the atmosphere, the gaseous and particulate pollutants must be removed before being disposed into the atmosphere. International and local regulations guide the installation and control of emissions from incinerators and gas exhaust sources. Some of these guidelines include EPA (the United States Environmental Protection Agency), Nigeria Federal Environmental Protection Agency Standard, Nigeria Federal Ministry of Environment Guidelines etc.
The heat energy from incineration can be recovered and used to generate electricity or heating. The conversion of the heat generated from incineration to other forms of energy is termed waste to energy.
At the end of the waste combustion, the solid mass of the waste may be reduced by about 80% to 85%, and the volume may be reduced to about 95% to 96% of the originally compressed volume by the garbage trucks. After combustion, leftover ash implies that incinerators do not automatically replace landfilling; it only significantly reduces the volume of waste.
Though there have been concerns and arguments about the environmental effect of incinerators resulting mostly from the exhaust gasses, modern incinerators have been equipped with emission treatment and monitoring units to minimise the actual amount of harmful gasses released into the environment. The emission monitoring and reduction system are also complemented by implementing waste segregation by ensuring that waste with a tendency to release more harmful chemicals is removed from the materials to be incinerated.
The benefits of incineration are even more for treating medical waste, which may contain pathogens and microorganisms that can cause health issues. These types of waste cannot be used in landfills and must be burnt in a controlled environment provided by incinerators.

Figure 2: Model of a Small Size Incinerator
Before burning the waste in the incinerator, other activities are performed to achieve an efficient combustion process and reduce the release of harmful gasses into the atmosphere. The below section describe typical activities that are performed:
The waste is collected from all the facilities and transported to a dedicated segregation facility. In some cases, the waste might be segregated from the source, thereby eliminating transportation to segregation facilities. The waste is transported directly to the incinerating plant.

Figure 3: Waste Trucks Equipped with Compactor
Depending on the strategy employed by the incinerator operators, waste segregation is performed to remove materials that should be recycled, reused, or released harmful chemicals into the atmosphere. Segregation might also be performed to separate waste by the amount of moisture contained, the possible amount of heating value etc. Liquid waste should be separated from solid waste. Most medical waste and harmful waste are segregated from sources to minimise multiple waste handling, which might expose workers to more harm.
Compaction is performed to reduce the volume of the waste. Most garbage trucks are equipped with a compressor which significantly reduces the volume of the waste. Also, at the incinerator site, compactors may further reduce the volume of the waste before they are fed into the incinerator.
Incineration is the actual combustion of the waste generating ash, flue gas and heat as already described.
Below is a list of waste that can be incinerated; however, note that not all hazardous waste can be incinerated; some require special disposal, e.g. radioactive waste.
Over the years, different types of incinerators have been built; however, the incinerators built in recent times from 2000 are more advanced than the previous. Though incinerators can be built and tailored to client needs, below are the types of incinerators
Among the listed types of incinerators above, the rotary kiln incinerator is very popular in municipal waste treatment.
This section will briefly describe the components of a small to medium-sized fixed hearth incinerator suitable for camps, residential apartments, hospitals etc. These units can handle waste treatment up to 400 kg/hr.
Fixed hearth incinerators are controlled air, starved air, or pyrolytic incinerators. As the rotary kiln incinerator, they employ a two-stage combustion process.
They can utilise natural gas, diesel or appropriate liquid hydrocarbon as fuel and can be operated continuously or intermittently. They may also be equipped with an automatic feeder system, however, due to their small size, most systems are manually fed with waste.
Note that some of the components described here are optional and may not be found in all units; also, process parameters stated here might vary depending on requirements and vendor offered technology.
Below are the components of a standard incinerator.

Figure 4: Schematics of Waste Incineration System/Unit with Exhaust Abatement System
Combustion of the waste material occurs in the primary combustion chamber. Controlled amount of air and fuel is introduced into the chamber to commence combustion of waste and ensure low environmental impact.
The combustion temperature can be over 800oC to ensure the waste is completely reduced to ash. The primary chamber is mostly manufactured from steel plates and steel bracing of appropriate thickness.
The chamber may be provided with a simple access door, pneumatic or hydraulic ram loader, etc., through which the waste is introduced.
The chamber may be equipped with a single or double burner. The primary combustion chamber design temperatures may exceed 1400oC
The chamber is lined with the appropriate thickness of castable refractory material.
After combustion in the primary chamber, the smoke passes into the heavy-duty secondary combustion chamber fitted with burners. The secondary chamber is mounted on top of the primary chamber. Complete combustion of the smoke and emission from the primary chamber is performed in the secondary chamber. To ensure complete combustion, the secondary combustion chamber operating temperature may be over 1100oC, while the design temperature may exceed 1500oC. Note operating the chamber at high temperature may be limited to about 1300oC to minimize nitrogen oxides production and lengthen equipment life. On the lower limit the chamber should be operated at a minimum temperature of about 850oC to achieve stabilized reaction rate needed to complete the combustion process. Note burners may be natural gas-fired or liquid fuel-fired, the same for the primary combustion chamber. The temperature of the chamber is controlled by controlling the quantity of air injected into the system. The chamber should be designed to ensure that the residence time for the smoke and emission in the secondary chamber may range from 0.5 to 2 seconds, depending on the statutory regulation. Like the primary combustion chamber, the secondary chamber is mostly made of steel of appropriate thickness with appropriate refractory material lining.
The refractory material can withstand temperatures over 1500oC. The typical thickness of refractory material used for primary and secondary combustion chambers is about 100mm. The refractory material used must be chemically and physically stable at high temperatures.
Common materials used in the manufacturing of refractories depending on the service temperature are the oxides of aluminium (Alumina), magnesium (Magnesia) and Silicon (Silica). Amongst the mentioned, Alumina is very prominent and used in many incinerators. It can withstand temperatures exceeding 1400oC.
The refractory material lining serves the following purpose
Each chamber is equipped with a burner that may be gas-fired or liquid fuel-fired. Also, some systems may have more than one burner depending on the thermal capacity required, the type of waste and the nature.
The burners are automatically ignited to commence waste combustion after turning on the system. Some of the components of a typical gas burner include a monoblock with (filter, governor, gas pressure switch, pressure gauge, safety valve etc.) relay and UV supervisor, ionization electrode, gas burner control, burner motor, air pressure switch, ignition transformer and solenoid valve.
Gas-fired incinerators must be connected to a gas supply source. Note the supplied gas pressure must not exceed that required by the incinerator. Some incinerators may be ordered with an inbuilt gas pressure regulator, or the customer shall make this provision before the gas is connected to the equipment. Incinerators using liquid fuel should be provided with fuel tanks connected to the burners. The customer shall provide all fuel piping to the incinerator.
For combustion to occur, oxygen is required to complete the fire triangle. The connected FD centrifugal fans provide the required quantity of combustion air in the primary and secondary chambers. The combustion air supplied to the chambers is controlled to aid proper combustion in the two chambers and minimize particulate entrainment and carryover.
The primary and the secondary combustion chamber should be provided with an ash door to remove ash from the system. An auto de-ashing system may also be provided for larger units where continuous operation is desired
Internal combustion activities in the incinerator can be observed using this port. The observation port is mostly provided for the primary combustion chamber and may also be provided for the secondary combustion chamber.
After combustion, the flue gas is sent into the atmosphere through the exhaust stack or chimney. Typical chimney height is a function of the regulatory requirements and building height within the vicinity of the incinerator. The stability of the chimney is also a factor to consider because small size incinerators are equipped with self-supported chimneys. A typical 100kg/hr incinerator may have a chimney of about 15m in height. The chimney should be considerably higher than the tallest building close by; otherwise, exhaust gas may find its way into the building. Also, medical and hazardous waste incinerators have higher chimneys than incinerators used for non-hazardous waste.
Chimney installed on a system with wet scrubbers should be lined with appropriate materials such as hard thick natural rubber or refractory to avoid corrosion due to oxygen and acids in the flue gas.
The optional components are provided to automate, safeguard the system, and ensure that exhaust gas quality does not exceed the values stipulated by the required regulations.
An incinerator with exhaust abatement devices installed may be equipped with an emergency stack to exhaust hot gas directly into the atmosphere when a power failure occurs. This ensures that the hot gas bypasses the gas scrubber preventing it from being damaged. The stack should be refractory lined with appropriate material. Also, water from an emergency water tank may be directed simultaneously into the scrubbers to cool down the temperature as the hot gas flows through the emergency stack.
Depending on the emission regulation and the quality of exhaust gas desired, there are different gas scrubbers or flue gas treatment equipment. There are dry, semi-dry and wet scrubbing units. These units are usually tailored to requirements or proposed by the incinerator vendor. A typical flue gas scrubbing system may have the following units.
The saturator is the first scrubbing device. Flue gas from the secondary chamber travels into the saturator, reducing the gas temperature to about 250oC and also performing initial gas scrubbing.
The flue gas exits the saturator and enters the venturi scrubber, using water and caustic soda as a scrubbing medium. Particulate matter is removed, and the venturi scrubber also removes pollutants like HCL and SO2. Also, the temperature of the flue gas is brought down to about 80oC
The Mist eliminator removes moisture from the scrubbed gas from the wet Venturi scrubber. It is essential to ensure the moisture is removed and not carried into the induced draft fan.
There are various optional tanks associated with the scrubbing system.
These tanks include
Wet scrubbing systems should have at least two pumps; usually, centrifugal installed for water re-circulation. One is running while the other is on standby.
The induced draft fan, usually centrifugal, draws out the scrubbed gas into the chimney and discharges it into the atmosphere.
This unit allows the incinerator to be operated for indefinite periods without requiring a shutdown for manual cleaning. The introduction of this unit reduces the frequency of start-up and burn-down cycles and associated increased use of fuel.
This optional unit, when installed, recovers heat from waste gasses and use for pre-heating. This recovery unit increases fuel efficiency and ensures complete combustion due to more stable high temperatures, with decreased fuel usage.
Due to regulations requirements, all gases expelled from the incinerator are continuously monitored by installing an emission monitoring system. The emission constituent expelled must not exceed those stipulated by regulations. Gasses and properties monitored include Carbon monoxide (CO), smoke opacity etc.
When ordering an incinerator, request the Vendor the guaranteed emission limits and review against the regulatory requirements. Alternatively, you can provide the Vendor with the emission limits required.
Some of the emission limits to be provided by the Vendor include

Table 1: Emission Limits to be requested from Vendor
Modern incinerators are automated. Parameters such as combustion temperature, the quantity of fuel and air can be automatically adjusted. Also, the incinerator can automatically shut down when combustion is complete. Key automation in a modern incinerator detects an unwanted quantity of flue gas, generating an alarm and shutting down the system.
FEPA / FMENV S.1.15: National Environmental Protection Management of Solid and Hazardous Wastes Regulations, 1991.
Wikipedia: https://en.wikipedia.org/wiki/Incineration
Man has used the technique of converting liquid water into steam and using the expansive force of this vapour as far back as 150 B.C. [1]. Despite this, it took over 1800 years for humans to harness the practical features of steam to conduct productive work. Around the year 1711, the first commercial piston-operated mine pump was invented. However, it wasn’t until the latter half of the nineteenth century that the first steam-operated central power station was introduced. In 1882, the Holborn Viaduct power station in London and Pearl Street Station in New York were put into service using reciprocating steam engines.
Steam provides a mechanism for transporting controllable amounts of energy from a central boiler, where it is efficiently and economically generated, to the point of use. Steam is one of the most popular means of conveying heat energy for many reasons. Its use is widespread throughout the industry for a wide-ranging spectrum of tasks, from space heating to mechanical power production and process applications. This is why some consider steam to be the ultimate energy fluid [2].
The capability of steam to hold a large amount of energy on a per weight basis (1000–1200Btu/lb) makes it ideal for use as an energy transport medium. Given that most of the steam heat energy is in the form of latent heat, significant amounts of energy can be transferred efficiently at a constant temperature, which is helpful for many process heating applications. Steam has come a long way from its conventional ties with locomotives and the Industrial Revolution in the nineteenth century. Steam is now a necessary and important aspect of modern technology. Our chemical, medical, food, beverage, textile, power, heating, and transportation industries would be paralysed without the use of steam.

Figure 1. Steam going out from cooling towers at Doel nuclear power station in Belgium. Source: https://commons.wikimedia.org/wiki/File:Kerncentrale_Doel_in_werking.jpg
Water can exist in the form of a liquid (water), a gas (steam), or a solid (ice). This article will concentrate on the fluid phases and the equipment required to facilitate the change from one to the other. When heat energy is supplied to liquid water, its temperature ascends until a value is reached at which the water can not any more exist as a liquid. We call this tipping point the “saturation” point. As more energy is added, some of the water will boil and become steam. This evaporation process requires relatively large amounts of power, and while it is being added, the liquid water and the vapour are both at the same temperature.
Steam creates pressure when it forms in a closed vessel, allowing it to move anywhere to a lower pressure, such as through piping and distant equipment. Allowing the steam to cool will also release the energy that was used to evaporate it. These boiling, transfer and condensing events provide a simple mechanism to transfer power from one place to another, hence the basis of a steam system. Interestingly, steam is colourless; the white colour often seen when steam discharges into the atmosphere corresponds to condensed water vapour in the steam.

Figure 2. Diagram of a steam boiler. Source: https://commons.wikimedia.org/wiki/File:Steam_Boiler_1_english.svg
The boiling of a liquid refers to a condition where vapour bubbles form on the heating surface of the liquid. Bubble formation is influenced by fluid characteristics as well as operational and surface conditions. When heat is applied to a liquid, it does not raise its temperature over the saturation temperature corresponding to its pressure; instead, the energy employed causes a phase shift from a liquid to a gaseous state, such as from water to steam. Boiling is a process that takes place at a constant pressure and temperature.
The temperature at which a liquid’s vapour pressure equals the gas pressure above it is known as the boiling point. Saturation temperature is another name for this temperature. The boiling point of a liquid in an open vessel is the temperature at which its vapour pressure equals the external pressure at one atmosphere. The boiling point of a liquid is reduced when the external pressure is less than one atmosphere. The boiling point of a liquid begins to climb when the external pressure rises above one atmosphere.The boiling point of a liquid is reduced when the external pressure is less than one atmosphere. The boiling point of a liquid begins to climb when the external pressure rises above one atmosphere.
Boiling happens when heat is applied to a liquid at a rate that causes it to reach its saturation temperature, which corresponds to the total pressure over the liquid’s free surface. When the vessel is open to the atmosphere, the vapour completely displaces the air from the liquid’s surface, however when the vessel is closed to the atmosphere, the vapour is evacuated through diffusion. The heat of evaporation or heat of vaporisation is the heat that converts water to steam.
The heat transfer that takes place from the wall to the liquid during boiling is given by the convective heat transfer equation:
![]()
where Q: Rate of heat flow (W); h: Heat transfer coefficient (W/m2); A: Area across which heat flow takes place (m2); ΔT: Difference in temperature between the heating surface and the temperature of the fluid (K).
![]()
The “heat flux” at the heating surface is found from the previous eq. as:
In drum-type subcritical boilers, water flows from the drum through downcomers to the bottom of the furnace, then moves up through risers or evaporator tubes and returns to the drum. It can be seen that the water in the downcomers does not receive any heat, while risers, which form furnace walls, absorb the heat of combustion of the fuel. As a result, the water inside the riser tubes is heated, and gradually, steam bubbles form in the water.
This mixture of water and steam in the riser tubes has a much lower density than the density of water alone in the downcomers. A density difference thus generated results in a static head difference causing the thermo-siphon effect, which provides the driving force for a downward flow in downcomers and an upward flow in risers. Since the fluid flow is generated by density difference alone, this is known as natural circulation in boilers [3].
To maintain a continuous fluid circulation, the fluid flow must overcome friction losses in downcomer and riser tubes, headers, bends, etc. One way of overcoming resistance due to friction is by increasing heat input to the furnace. As the heat absorption increases, the density difference between the fluid in the downcomers and the fluid in the risers also increases, resulting in an increase in fluid flow.
However, an increase in fluid flow, in turn, also causes an increase in friction loss. As a result, a point is reached when the rate of growth in friction loss surpasses the benefit of the enhanced density difference, where the rate of fluid flow starts to “drop.” Hence, all natural circulation boilers are designed to operate below the point of “drop.” The phenomenon of rising flow-rising heat input tends to make a natural circulation boiler self-compensating in the case of sudden overloads, changes in heat-absorbing surface conditions, non-uniform burner disposition, etc.
The process of circulation, be it natural or forced, is dominated by what is called the circulation ratio, which is defined as the ratio of the “quantity of water in circulation” to the “quantity of steam produced.”
Combustion converts the chemical energy in the fuel to heat energy, which is transferred to low-temperature water in the steam generator, where it is converted to high-energy steam for use in the steam turbine.
The salient features of this heat-transfer process encompass the following circuits, systems, or areas:
Water and steam circuit
The temperature of the feedwater before it enters the steam generator is lower than the saturation temperature, indicating that the feedwater is subcooled. The feedwater temperature in the steam generator is raised to near-saturation temperature in the economiser. The sensible heat for bringing the feedwater to saturation and the latent heat for evaporating saturated feedwater is added to the water wall to generate steam.
This steam is separated from the steam-water mixture coming out from the water wall and purified in the boiler drum to ensure a saturated steam supply. The saturated vapour is further superheated to attain the desired energy level.

Figure 3. Water and steam circuit. Source: doi.org/10.1016/B978-0-12-801575-9.00002-0
Furnace
In the furnace of a steam generator, fuel combustion takes place with atmospheric air to release heat. To capture the greatest heat potential of the fuel under combustion, it is critical to achieve complete combustion of the fuel under all operating conditions
System for Burning Fuel
The basic goal of a fuel-burning system is to convert the chemical energy of a fossil fuel into thermal energy in a controlled and efficient manner. The heat energy created is delivered to the steam generator’s heat-adsorbing surfaces. The burner is the most important piece of equipment for burning fossil fuels in a furnace.
An ideal fuel-burning system in a furnace is characterised by the following:
Draft system
To maintain a healthy combustion process in a furnace, it must receive a constant flow of air while also removing combustion products from the furnace without interruption. A natural draft system is one in which combustion products are released solely through a chimney.
When the chimney is augmented with forced draft (FD) fans or induced draft (ID) fans, the system is called a mechanical draft system [4]. Small steam generators employ natural draft, while large steam generators require mechanical draft to move large volumes of air and gas against flow resistance.
A furnace utilising only an FD fan is subjected to a “positive draft” (pressurised), while one using an ID fan only is subjected to a “negative draft” (subatmospheric pressure). Normally large coal-fired steam generators utilise balanced draft, employing both FD fans and ID fans.
Heat recovery system
The flue gas or combustion products leaving the convection heat-absorbing surfaces in large steam generators still carry substantial heat energy at a temperature much above the steam saturation temperature. If exhausted to the atmosphere without further heat transfer, this heat will result in significant losses. As a natural consequence of the economic operation of a steam generator, a major part of this heat is recovered by placing the economiser and, after that, the air heater in the exit flue-gas path.
Theoretically, reducing the flue-gas temperature to that of the incoming air to the air heater is possible. However, as described below, such a reduction in exit flue-gas temperature is prohibited for technical and economic considerations.
In an economiser, Before entering the evaporation circuit, the incoming feedwater absorbs heat from the departing flue gases, elevating the temperature of the feedwater as close as possible but below its saturation point.
The remaining heat in flue gas downstream of the economiser is recovered in the air heater to raise the temperature of combustion air prior its entrance into the furnace. The energy thus retrieved returns to the furnace and diminishes the amount of heat that must be released by the fuel to keep the desired furnace temperature, thereby ensuring a reduction in the amount of fuel to be burned [5]. The hot air is also used to dry coal in a pulverised coal-fired boiler.
We have discussed the usefulness of steam as a heat transfer medium and described the subsystems in detail in previous sections. Collectively, that information can be beneficial if it can all be applied to make a complete steam system.
This section will review the specific type of steam systems found in the process industry and some design considerations required for each type. Some specific applications are shown in Table 1 [6]. It is relatively easy to see that process steam systems are used to make products we use every day. Although there are dozens of steam system configurations in use today, generally, steam system configurations can be described in one of these four types of applications:
Each steam application requires a unique set of design criteria for optimal performance. It is not uncommon to see a combination of applications from different types employed by a single steam system (i.e., high‐pressure process steam used with low‐pressure steam heating coils). In addition to the four applications, considerations for using multiple boilers of any pressure rating and condensate return rate are described. Lastly, specialised steam using equipment like back pressure turbines (BPT), hydro heaters, superheaters, and steam mufflers are described, and guidance for their installation is presented.

Table 1. Steam System Applications. Data from the Advanced Manufacturing Office, US Department of Energy.
This type of steam application is considered a “closed” system and is the most widely used steam in the process industry (Figure 4). High‐pressure steam is usually steam at or under 300 psig. Steam in this application can be used for product heating via a shell and tube heat exchanger, steam coil in a tank, plate a frame heat exchanger, jacketed kettle, steam drum/roller, evaporator reboiler, steam jacket, steam press, or steam ironer. The steam condenses in the equipment, and the condensate is removed, recovered, and returned to the boiler room. Applications will have
the following characteristics:

Figure 4. High‐pressure closed steam system. Source: https://industrialsteam.com/high-pressure-condensate-return-hpr/
These high‐pressure high‐condensate process applications require good steam trap sizing and conservative pipe sizing; otherwise, waterlogging can occur in the steam using the equipment. Once the system is set up to operate properly, they usually are quite easy to maintain because the steam and condensate flow are relatively steady.
Low‐pressure steam is generated and sent throughout a building or series of buildings where the steam is used for heating. These types of systems are used widely in steam heating, steam to hot water generation, or heat tracing applications (Figure 5). Typically the steam used is less than 50 psig, with 12–14 psig found most often. Schools, colleges, and older manufacturing facilities have used low-pressure steam heating systems for many years. These types of systems share the same characteristics as high‐pressure systems with high condensate returns, and only the steam quality can be much lower. It is not uncommon to see a high‐pressure process steam system used with pressure‐reducing valves (PRV) to lower steam pressure for space heating in the same facility.
Many low‐pressure steam heating systems are being replaced with high efficient hot water systems. When a process steam application calls for a process temperature less than 230°F, low‐pressure steam can be a suitable heat transfer method. Because of the high returns, water chemistry is relatively easy to maintain. In some areas of the United States, low‐pressure steam systems do not require a stationary operator, which is not the case for some high‐pressure steam systems.

Figure 5. Low‐pressure steam systems with high returns. Source: https://doi.org/10.1002/9781119085454.ch12
One caution to keep in mind for these low‐pressure steam systems is condensate lift limitations. If condensate must be pumped at any significant distance or height, the low‐pressure steam may not have enough motive force to push the condensate. If the steam pressure at a steam trap is only 10 psig, then a rise of more than 10–15 ft is enough to create waterlogging. In these applications, you should employ a Hartford loop system or drain the condensate to an atmospheric tank and electrically pump the condensate back to the boiler room.
Low‐pressure steam systems with high returns can also employ a Hartford loop design. This essentially is a closed loop system in that gravity drains the condensate back to the boiler. A Hartford loop system is simple and relatively maintenance free. Many older steam heating systems use this system configuration.
These types of steam systems are found in sterilisation, food processing, biofuels, paper manufacturing, and any other application where steam is injected directly into the product being heated, or the condensate must be discarded. Some applications, like using steam to heat plating tanks of acid or steam tunnels for laundry, do not recover the condensate because of the risk of condensate contamination.
Steam systems with little or no returns will:
This application requires some distinct design considerations to protect the product being heated. For example, sterilisers that use direct injection steam to disinfect cannot tolerate wet or dirty steam. Imagine a doctor picking up a surgery tool that has been sterilised this way that has dissolved solids spots on it [7]. Consequently, any water in the steam needs to be removed. Steam filters and separators are commonly employed in these applications. Boiler sizing also becomes a bit tricky.
Since there is a high percentage of colder makeup water, more fuel energy will be used to heat the water up to the boiling point before any steam is produced. This added sensible heat must be taken into account, or the boiler can be undersized. In many applications of this type, steam is used in batch‐type applications, and the use of steam accumulators is warranted. Such is the case for autoclaves that use steam to sterilise. Initially, the autoclave vessel is cold and will have a warm‐up load that could exceed the boiler capacity.
It should be quite apparent that a steam system application with little or no condensate returns requires the boiler size calculation to consider the energy needed to heat up the cold water makeup and account for the heat loss from the blowdown water.
This type of system is found in the process industry, where the process requires relatively high temperatures. Rubber processing, refineries, chemical manufacturing, and other industries use these systems. High steam pressure may require expensive components, and superheated steam use will require careful condensate collection systems. Remember that superheated steam is saturated steam with added sensible heat energy. Therefore, superheated steam must give up sensible and latent heat to condense fully. Correct trap selection is critical.
These types of steam systems can be susceptible to steam hammer and steam erosion across steam regulating valves. Equally important is to design for thermal expansion if long pipe runs are required. Drain legs must be installed at regular intervals to support condensate draining prior to starting up. To minimise steam hammer, individual condensate runs should also be introduced into the main condensate header via a condensate diffuser.
Regardless of the condensate return volume, when a design calls for multiple boilers, some additional design features need to be considered. A boiler master control panel should be included to ensure lead-lag sequencing of the boilers occurs. In addition, system operators should strive to operate any steam boiler in its most efficient output range, which is usually 20–80% output. When multiple boilers are tasked, the boiler master control panel will help achieve this goal. When multiple boilers are connected to a common steam header, high water protection is required for each boiler. This is because migrant steam from an operating boiler will flood an idle boiler unless a check valve is installed in the boiler steam line or a means to keep equal water levels in all boilers is used.
There are many types of specialised steam using equipment, but we limit our discussion in this section to four major types, BPT, hydro heaters, superheaters, and steam mufflers.
BPT uses high‐pressure steam to generate electricity or provide mechanical work (i.e., shaft work). Facilities that can generate high‐pressure (>200 psig) steam but use lower pressure steam can employ a BPT. Those facilities often use PRV to step down the high‐pressure steam to lower pressure. A BPT can be used in place of a PRV.
The use of a BPT is different from a condensing turbine. In a condensing steam turbine (what is typically used to generate electricity in a steam power plant), the steam condenses and is collected and fed back to the steam generator. A BPT does not condense the steam; it just extracts enthalpy by reducing its pressure. The higher the pressure reduction across the BPT, the more energy can be extracted and eventually converted to electricity or mechanical work.
One can also calculate the amount of added steam flow required to operate the BPT. First, obtain the enthalpy loss data across the BPT and determine the added steam flow at the turbine inlet to account for the loss.
A second specialised piece of steam equipment is a hydro heater. A hydro heater is actually a branded name of a steam injector manufactured by the Hydro‐Thermal Corporation. Although there are other similar functioning pieces of equipment on the market today, the name hydro heater seems to best fit how to describe the function of this machine. Hydro heaters are internally modulating steam injectors that inject steam with a 90-degree fluid flow design favourable for slurries that require high shear heating.
A liquid or slurry enters the combining tube, where steam is introduced into the fluid through a nozzle. The nozzle discharges steam at very high, often sonic velocity. The rugged nature of this high-velocity discharge enables steam to instantaneously penetrate, disperse, and efficiently mix with the slurry or liquid. Temperature is measured downstream, and feedback is sent to a controller, which modulates steam flow via an actuator linked directly to the steam nozzle plug. They are used extensively in the pulping and biorefining industries to heat the process fluid. They can be used in food processing and other manufacturing facilities with steam available and require a simple means to heat a high‐flow process stream.

Figure 6. Hydro heater. © Hydro‐Thermal Corp. Source: https://www.foodprocessing-technology.com/contractors/thermal_processing/hydro-thermal/
Essentially, the flow rate of the process stream is manually controlled by moving an adjustment cone more open or more closed. The hydro heater automatically adjusts the steam flow to maintain the temperature of the process fluid; therefore, no external steam control valve is needed. The violent mixing helps ensure the process fluid is heated uniformly and can aid in breaking up particulate mixtures [8]. In corn‐based ethanol plants, hydro heaters are used to add thermal energy to corn mash slurries and aid in gaining access to the starches inside the corn fibre shell.
There are design considerations that should be used when applying a hydro heater. The steam supply will need a minimum pressure and should be of high quality. Strainers and drip legs should always be utilised in the steam line upstream of the heater. There are process flow and pressure relationships to steam flow and pressure required through the hydro heater. Sizing is critical, and consultation with the manufacturer should occur before system design. Unmatched process flow and steam flow can create excessive vibration and noise. When tuned properly, a hydro heater is quiet and operates very efficiently. Sometimes, a valve is placed in the discharge of the heater to ensure a slight back pressure is placed on the unit to help balance flows.
Occasionally, a process heating application may require heating a product to a temperature that makes using saturated steam impractical due to the required very high steam pressure. An independent hot oil system can be used for those applications, or a steam superheater may be employed. Hot oil systems use hot oil circulated under low pressure in lieu of steam. They can be expensive.
If a steam supply exists in a facility, an alternate solution might be to add a steam superheater to add sensible energy to the existing steam supply. Superheaters can be gas-fired, electric or use waste heat to add energy to the steam supply. Superheated steam will be at saturated steam pressure but have a higher temperature.
Superheaters are utilised to elevate the temperature of steam beyond its saturation temperature [9]. Usually, the dry and saturated steam enters the superheater via correspondingly saturated steam piping from the evaporator drum exit to the inlet header in the superheater. Subsequently, the heating surface absorbs the influx from the turbine exhaust gas and then into the steam, whose temperature increases.
At the same time, the steam flowing through the heating surface, headers, and interconnecting piping loses pressure. The heating surface is designed to deliver the required steam pressure/temperature conditions at the scope of the supply terminal point or the steam consumer. In general, the pressure loss should be minimised while maintaining strong cooling of the tubes as the saturation pressure in the evaporator increases with increasing superheater pressure loss, and the steam flow then decreases.
It may become necessary for large process steam systems to install a steam muffler on the steam dump line. If the need for steam is suddenly stopped during a process, the excess steam produced will be vented in mass from the steam header to the boiler building exterior. This situation can result in loud, high‐pitched irritating noise [10]. This is especially true for process boilers located in municipalities with high community awareness. A steam muffler can be employed to reduce the noise level to acceptable levels. One such application is shown in Figure 7. The muffler acts similar to the one found on an automobile exhaust.
The muffler system design must take into consideration the forces created by discharging a high mass of high‐pressure steam and must account for the condensate that will likely be created in the muffler itself. Construction should be stainless steel, and a qualified structural engineer should approve the mounting.

Figure 7. Schematic of a Pulsco steam muffler/silencer. Source: https://asa.scitation.org/doi/abs/10.1121/2.0000012
[1] https://www.egr.msu.edu/~lira/supp/steam/
[2] Merritt, C. (2015). Process steam systems: a practical guide for operators, maintainers, and designers. John Wiley & Sons.
[3] Sarkar, D. K. (2015). Chapter 2-Steam Generators. Thermal Power Plant, 39-89.
[4] https://www.sciencedirect.com/topics/engineering/induced-draft
[5] https://www.thermopedia.com/content/838/
[6] Steam System Applications. (2015). Process Steam Systems, 187–203. doi:10.1002/9781119085454.ch12
[7] https://www.cdc.gov/infectioncontrol/guidelines/disinfection/sterilization/steam.html
[8] https://www.hydro-thermal.com/how-it-works
[9] Hennessey, S. P. (2017). Superheaters and reheaters. Heat Recovery Steam Generator Technology, 95–113. doi:10.1016/b978-0-08-101940-5.00006-3
[10] Tohid, U., Gubitz, K., Genger, C., Accorsi, I., Kaiser, J., & Pacheco-Vega, A. (2014, October). Parametric analysis of a Pulsco vent silencer. In Proceedings of Meetings on Acoustics 168ASA (Vol. 22, No. 1, p. 040003). Acoustical Society of America.
Construction of LNG carriers Methane Princess and Methane Progress in 1964 marked the beginning of commercial transportation of liquefied natural gas across oceans – first ever been done by Methane Princess which was loaded with LNG at Algerian Arzew port for delivery to Gas Council’s terminal at Canvey Island, Essex (England) through Atlantic Ocean. Commercial trading of LNG from 1964 till 1990 was predominantly under term-agreements – Sale Purchase Agreements (SPAs). SPAs typically provide most, if not all of, the revenues for an upstream LNG project and also provide anchor supplies for development of LNG regasification facilities. In fact, new LNG trains are typically not launched without at least some long-term contract coverage. SPAs have firm take or pay obligations for buyers and firm deliver or pay obligations for sellers. Long-term (15-25 years) SPAs have historically been the cornerstone of the commercial arrangements between LNG buyers and sellers.
LNG spot market is the daily market – a market where LNG is bought and sold on ‘right now’ basis providing the price of LNG on a specific day. It is reported that LNG spot market was 1 percent (of total LNG trades) in 1992, 8 percent (400 BCF or 8.4 million tons) in 2002 and GIIGNL estimated that 35 percent (~11,000 BCF or 230 million tons) of global LNG volumes were traded on a spot basis in 2020.
To cater for the increased share of LNG Spot market in LNG trades, SPAs have taken a new form in recent years i.e. Master Sales Agreements (MSAs) – MSAs have been developed to address commercial relationships between long-term Buyers and Sellers while taking into account the realities of LNG spot trade. MSAs typically consist of a main Sale-Purchase-Agreement that sets forth the “General Terms and Conditions” and a shorter “Confirmation Memorandum” that constitutes a separate agreement between buyer and seller to purchase one or more cargoes of LNG. MSAs are an important part of the evolving LNG spot market and facilitate a number of transactions. For example, MSAs permit sales of LNG produced in excess of committed SPA sales for an LNG liquefaction project. Suppliers can use MSAs to sell extra cargoes in spot market at higher prices to alternative destinations experiencing seasonal peaks in demand. MSAs are also being used by buyers to source additional cargoes from MSAs to meet seasonal or temporary LNG demand.
In order to understand functioning of global LNG spot markets, following figure is helpful.
Figure 1: Screen Shot of European Energy Exchange TTF Price History
Above screenshot provides historical TTF price of spot LNG trades and provision of comparison with neighboring hubs like THE and PEG. Since each hub has different gas / LNG input sources, their comparison provides an insight, to the traders, into the LNG supply-demand situation to Pacific, Asian and US markets. Following is a description of some of the important symbols / terms used in LNG / gas spot markets.
| Symbol | Description |
| CEGH VTP | Central European Gas Hub AG (Virtual Trading Point) – the hub for gas trading in Central and Eastern Europe, located in Vienna, Austria.[1] |
| CRE | Energy Regulatory Commission, France |
| CZ VTP | Czech Virtual Trading Point |
| EEX | European Energy Exchange |
| ETF | Exchange Traded Funds – funds that hold assets that they track e.g., natural gas, gasoline, gold |
| ETN | Exchange Traded Notes – bonds that are not secured by physical assets |
| THE | Trading Hub Europe – a new nationwide German gas market created through merger (effective 1st October 2021) of Gaspool (GPL) and NetConnect Germany (NCG). |
| PEG | Gas Exchange Point, France – covering physical gas deliveries in France (Trading Region France or TRF) at two virtual trading points: PEG Nord (North) and TRS (Trading Region South). TRS was created by the merger of PEG Sud and TIGF on 1 April 2015, to improve the operation of the gas market in southern France and promote its development. Later, TRF was implemented in November 2018.[4] , [5] |
| TTF | Trade Transfer Facility |
| ZTP | Zeebrugge Trading Point, Belgium |
| PVB | Punto Virtual de Balance, Spain |
LNG market liberalization — Spot markets for LNG have provided transparency in the procurement structure and to trade market-based — thus providing an opportunity for global price discovery. Actually, LNG spot markets are supporting creation of Natural Gas Virtual Pipelines between demand and supply centers across continents. Availability of liquidity is now the only key factor in attracting flow of LNG in the world. Similarly, LNG globalization is transforming the market landscape across various trading hubs in Asia, Europe, and the US – there is an ongoing evolution in LNG trading hubs to achieve and maintain their benchmark status. As reported:
“In Asia, LNG liberalization has enabled the region to overcome a lack of pipeline infrastructure — producing Asia’s first natural gas benchmark with LNG contracts settled against the Platts LNG Japan Korean Marker (JKM). The success of JKM raises the question of further evolution — whether stakeholders will continue using existing pipe gas benchmarks in the US and Europe, or if new benchmarks will emerge. In addition, if LNG is viewed as a virtual global pipeline, the development of a supporting freight market could provide important price transparency for transportation between major trading centers.
With Asia as the key buyer of global LNG, and Europe as the world’s balancing market, the interplay between Europe’s TTF and JKM will underpin pricing formation for global natural gas. JKM has already hit key milestones — the ratio of the spot LNG to derivative market is now 1:1, indicating the same amount of trading in derivatives as physical markets.”
Recent spike in European LNG demand due to Russia-Ukraine conflict has incentivized suppliers to default under term-agreements by diverting LNG cargoes to European spot markets at “multiples of term-contract price”.
Singapore-based Guvnor has decided not to honor its contract to deliver four LNG term cargoes to Pakistan.
“The cargoes were to be delivered in the remaining four months’ tenure of Guvnor’s five-year term agreement ending July 2022. The buyer now has to purchase costly LNG cargoes at higher prices currently oscillating in global spot market in the range of $32-38 per MMBTU instead of over $10 per MMBTU (11.6247 per cent of Brent) under term agreement. With the latest default, Guvnor has to date defaulted on seven cargoes whereas ENI defaulted on four cargoes under their term agreements with PLL (Pakistan LNG Limited). Under the term agreement ending in 2032, ENI is providing LNG cargoes at 12.14 per cent of Brent. The main reason for default is attributed to the flawed clauses in term agreements, whereby if case LNG trading companies commit default, PLL can impose a penalty of 30 percent of the term cargo price and not more than that. On the other hand, the PLL is bound to pay 100 percent price of the term cargo under take or pay agreement if Pakistan, for any reason, cannot take delivery of the LNG.”

The graph, reproduced from S&P Global Insights, shows that Spain can import additional 17.25 MTPA LNG by increasing the utilization of 65 Mcm/d of transmission constraint with France, once it is resolved. This increase will be almost twice the annual imports of Pakistan LNG under term contracts.

Another important factor under current LNG procurement transaction in spot markets is payment of price premiums to increase the validity period of bid price. Pakistan LNG’s buy tender, issued in October 2021, seeking December 2021 to January 2022 deliveries, had a validity of 15 days. The buy tender did not receive any offers from sellers due to its long validity. It is now a market norm that tenders have validities extending hours or even days beyond the submission deadline, increasing the risk of incurring slippage costs. For instance, PTT floated multiple buy tenders seeking January to March (2022) cargo deliveries, and those had two-hour validities.
Spot LNG buyers have to pay premiums when they request fixed price offers. According to ICE Insight, several buy tenders that were concluded lately, including those of PTT, Japex, and Komipo, were reportedly awarded with considerable premiums due to their requirement of fixed price basis offers in the tender process. Sellers typically attach such premiums to their fixed price offers to buffer for slippage – the risk of market prices moving higher or lower than expected when the trade is executed, from when the offer or bid is submitted.
“Nobody wants to offer on fixed price basis now, TTF has a possibility of moving 20% intra-day, fixed price offers have a 15-minute validity”
Japex had also purchased a March 11-17, 2022 delivery cargo into the Soma terminal on Jan. 21 at 6 pm SGT, with a one-hour validity. The tender was heard awarded at mid- to high-$23/MMBtu to a portfolio player.
“The JAPEX buy tender was probably transacted with a 20-30 cents fixed price premium at least,”
JKM was assessed at $20.172/MMBtu on the same day of the transaction.
Traditionally, oil trading in spot markets has served as the Benchmarks (e.g. WTI or Brent) for gas or LNG price determinations in term-contracts. It was because well-functioning spot markets provided links and means for risk coverage through forward markets – thus contributing transparency and liquidity for spot trades thereby achieving benchmark status.
Gas trading hubs are marketplaces — both virtual as well as physical — run by hub operators, where market participants transfer the title on natural gas already present (or expected to enter or leave in contracted future time) in the transmission system to other market participants. Originally, Europe had the UK National Balance Point (NBP), sterling-denominated, as the first traded natural gas hub. Subsequently, policymakers, market participants, and the Netherlands hub operator established the, Euro-denominated, Dutch Title Transfer Facility (TTF). It is claimed that TTF has replaced NBP as Europe’s main gas hub and benchmark price, a clear case of liquidity coalescing around the most suitable benchmark for a given market – mainly due to rise in its utility for current and future customers resulting from significant rise in year-on-year TTF’s trading volumes and the network effect of markets. TTF is gradually moving to establish its benchmark status as the Brent equivalent of natural gas.
While Europe has the NBP and TTF as liquid spot markets, Henry Hub (HH) has been a benchmark for North American gas market. However, the use of Louisiana’s Henry Hub predates a global natural gas market and also when US was not a gas exporter. After the shale gas revolution, the US has become second largest exporter of gas (LNG). Today, US export facilities are signing long-term supply contracts that are not just tied to the Louisiana marker – US Gulf Coast LNG is said to be correlated to the TTF as well as price of LNG in North East Asia.
In Asia a gradually establishing spot market is Japan-Korea-Marker (JKM) – JKM has recently been recognized as credible spot market benchmark and Platts Market on Close methodology is now being used for the determination of the JKM price assessment. The development of the liquidity of benchmark hubs, TTF and JKM, is illustrated in Figure-1 by means of the change in churn rates (as in July 2019) – the proportion of the trading volume to physical demand.

Figure 2: Churn rates for benchmark hubs (2015 = 100)
There has been an unprecedented price volatility in Asia-Pacific and European LNG spot markets, as clearly evident in graph below.

Above graph, while indicating turmoil in LNG Spot prices, is also a clear indicator of sudden rise in European LNG demand that occurred in calendar year 2021. Reason for this rise in LNG demand is Russia – Ukraine conflict. Following table explains how the falling European gas production is making them more and more dependent on imported LNG and Russian piped natural gas. In 2021 around 74 percent of Russian gas exports had destinations in Europe – refer two figures reproduced below:


The Russia – Ukraine crisis and resulting disturbance in natural gas flows from Russia to Europe was the main reason for sharp rise in LNG spot prices. It is evident from the graph in Figure-3 that LNG imports by EU-27 (EU-27 means European Union member states excluding UK) for Jan-Feb 2022 were 2.5 times of LNG imports in Jan-Feb 2021.

In conclusion, it can be deduced that the panic situation causing price havoc in European trading hubs has four reasons:

Figure 4: Long-Term Contracts In 2021 Were Dominated by Asian Buyers

Figure 5: Top LNG Importers & SPA Executions In 2021

A refrigeration system is a combination of equipment and piping connected in a sequential order to produce a cooling effect, i.e. the process of extracting heat from a lower temperature heat source, a substance or refrigerating medium and transferring it to a higher temperature heat sink, commonly atmospheric air and surface water, in order to maintain the temperature of the heat source below that of the surroundings.
Refrigeration systems can be classified into the following categories:
Chilled-water systems consist of these functional parts:
As there are numerous and versatile industrial processes requiring refrigeration, there are also different manners of connecting the components and equipment in a refrigeration system. Figure 1 depicts a refrigeration system used in the textile industry for supplying air washers. This particular example will describe the principles of the operation of refrigeration systems [1].

Figure 1. A sample refrigeration system. Source: https://doi.org/10.1002/9780470714379.ch11
The task of this refrigeration system is to produce chilled water with an initial temperature of, let’s say, 10 ◦C, while the design return water temperature could be 15 ◦C. There is a flow of this water in the evaporators of chillers measured in m3/h. The total installed refrigeration capacity is around 8,000 — this can be achieved with given temperatures of chilled water and condensers’ inlet/outlet water temperatures of 30/35 ◦C. The flow rates of chillers condensers are also given in m3/h. Typically, the refrigerant was R-11 or trichloromonofluoromethane (CCl3F). Although refrigerant R-11 is considered a safe product as it is non-flammable and non-explosive, its use has been restricted by some problems: low operating pressures and high potential to deplete the ozone layer.
The electrical power of the electric motors for running the turbo compressors of the chillers resides between 300 kW and 500 kW. In a regular plant, most chillers are anticipated to operate while one or two are used as a stand-by reserve. In addition to that, the power of the pumps for running water for the cooling tower can reach 45 kW each, evaporators pumps 22 kW each, and water supply pumps 55 kW each. The total installed power of the pumps will depend on the total number of pumps, as well as the installed power for driving the ventilators of the cooling towers.
The illustrated refrigeration system is undoubtedly a considerable consumer of electric power. We are interested mainly in the performance and overall energy efficiency of the refrigerating system, which besides chillers, also includes pumps, cooling towers, maintenance, manner of administration, outside temperatures and relative humidity, load variations, etc. All of these factors have a significant impact on the system’s operational requirements and energy consumption.
Chiller
There is a variety of water chiller types. Most commonly, these are absorption, helical rotary, centrifugal, and scroll; some reciprocating configurations are also available. Chillers can be either air- or water-cooled. Major vapour-compression chiller components include an evaporator, one or more compressors, condenser, and expansion devices. Generally, water-cooled models are typically installed indoors, while air-cooled chillers are outdoors—either on the roof or next to the building. Air-cooled chillers may have a distant evaporator inside the building for freeze protection in frosty environments. The evaporator segment of a water chiller is a shell-and-tube, refrigerant-to-water heat exchanger. Subject to the chiller’s design, either the refrigerant or the water is contained within the tubes.
To cool a process or building, the excess heat must ultimately be rejected outside or to another system (heat recovery). The total amount of thermal energy rejected takes account of the sum of the evaporator load, the compressor work, and the motor inefficiency. Whereas in an open chiller with the motor separated from the compressor — and connected by a shaft — the motor heat is rejected directly to the surrounding air, in a hermetic chiller —the motor and compressor are in the same housing — these loads are all rejected through the condenser. The compressor work and the evaporator load are released through the condenser, and the motor heat must be handled by the equipment room’s air-conditioning system.
Otherwise, air-cooled chillers do not use condenser water; instead, they liberate heat by passing ambient air across heat exchangers. In the case of packaged air-cooled chillers, the manufacturers improve performance by staging fans in response to ambient, dry-bulb temperature and chiller load. Air-cooled chillers can also be split apart. The first distinguishing feature between air-cooled and water-cooled chillers is their available capacity. Packaged chillers with air-cooled condensers typically range from 7.5 to 500 tons. The capacity of packaged water-cooled chillers ranges from 10 to approximately 4,000 tons.
Loads
Air handlers are frequently used to meet cooling demands in comfort-cooling applications, as long as they incorporate coils to transfer heat from conditioned room air to circulating chilled water. As air passes over the finned surface of the cooling coils, it is cooled and dehumidified. Because the psychrometric process of air conditioning takes place at the coils, choosing the right size and type among the many options available is critical for proper system performance. Cooling air isn’t really required for some particular process loads. Instead, they may entail direct heat transfer within a piece of process equipment, such as an injection-moulding machine’s cooling jacket.
Distribution System
Cold water is circulated through fixed piping—most commonly copper, steel, or plastic—that couples the chiller with various load terminals. Piping is sized to meet construction cost, pressure loss, and water velocity parameters. The native pump creates pressure to circulate chilled water within the loop. Normally, the pump must overcome the frictional pressure losses caused by the components already described and the pressure differential across open control valves. The chilled-water pump is usually located upstream of the chiller.

Figure 2. Variable primary system. Source: https://www.bcxa.org/
By itself, the distribution system is clear to comprehend. A streamlined distribution system consists of multiple cooling coils, each governed by a thermostat that controls the flow in its respective spiral. The valves may be either two-way or three-way. The pump may ride its curve as flow fluctuates or use a flow control method such as a variable-speed drive. The distribution arrangement may contain other elements, such as an expansion tank, an air separator, control, balancing, or check valves, to name a few. The water density (and volume) in a “closed” chilled-water distribution system fluctuates as it undergoes changes in temperature. The expansion tank allows for this augmentation and contraction of water volume.
Condenser-Water System
To cast off heat, water is passed through a cooling tower where a fraction of it evaporates, thus cooling the remaining water. The effectiveness of a particular cooling tower at transferring heat depends on the previously mentioned conditions, namely water temperature, ambient wet bulb, and water flow rate. During many points of operation, the optimal output is not the lowest water temperature the cooling tower can produce. It is important for the system designer and field worker in charge to examine the use of system-level panels to fix the tower-sump temperature setpoint to reduce the sum of chiller-plus-tower energy. A proper chiller-plant management system can automatise the chiller-tower control [2].
Pressure drop through the chiller’s condenser and piping, plus the cooling tower static lift, is overcome by using a condenser-water pump. The condenser-heat exchange surfaces must be kept free of scale and sludge to ensure optimum heat transfer performance.
Hot water is an essential requirement for all dwellings and most working environments. The following factors should be considered in the selection and design of hot water supply systems:
Domestic hot water service is the generation and delivery of hot water for consumption at outlets such as sinks, baths, showers, dishwashers, etc. Although the water supplied is not required to be potable, it will still be used for washing and so must be delivered in a hygienic and pleasant condition at the point of use. In particular, great care needs to be taken to prevent bacterial growth such as legionella. As biocides cannot be added, high temperatures need to be maintained, though not so high as to risk scalding.
There are many methods of supplying hot water, ranging from simple gas or electric single point arrangement for one outlet to the more complex centralised boiler systems supplying hot water to several outlets. Heat pump systems for water heating and hot water supply can be carried out using multiple low-temperature energy sources. The advantages of such systems are illustrated by the example of a heat pump system using earth (or ground) heat for the heat supply of a railway station. The system utilises the natural heat of the ground and provides water heating for a passenger waiting room and offices in the cold season, air conditioning in office rooms in summer, and hot water supply throughout the year.
The system’s design must also allow for the expansion of the water to prevent explosions. Regulations and codes of practice cover these safety requirements. Hot water systems consume significant quantities of both water and energy, and these are also dealt with in various regulations.
A heat pump water heater uses less energy than an electric water heater for the same thermal output. Generally, the vapour-compression heat pump is used for water heating and the working fluids used are chlorofluorocarbon (CFC), hydrochlorofluorocarbon (HCFC) and hydrofluorocarbon (HFC) refrigerants. Recently, natural fluids have been considered to replace the HCFC and HFC refrigerants, which are harmful to the environment. Carbon dioxide is one of the promising natural fluids. It is inexpensive, nontoxic and available on the market.
The heat (energy) required to raise the temperature of water is given by the well-known equation:
where M is the mass of the water, (kg); Cpw is the specific heat of water, (4.18kJ/kgK); is the rise in water temperature (K), when the energy, E, is given in kJ. The power (rate of energy supplied) to achieve this in a given time period, t is then:
![]()
This equation is directly applicable to heating a fixed mass of water in a storage vessel. However, it can easily be modified for water flow by noting that the fraction M/ is the same as the mass flow rate.

So, for an instantaneous HWS system:
![]()
where is the mass flow rate of the water (kg/s).
It is revealing to compare the power requirements of storage and instantaneous systems. For example, a 22mm tap serving a bath has a maximum flow rate of up to about 0.3kg/s (note that 1kg of water is approximately 1 litre). A typical delivery temperature is 55°C. In winter, the water may enter the system at 10°C. This gives an instantaneous demand of some 56kW. Yet domestic storage systems are quite capable of supplying a hot bath using a mere 3kW electric immersion heater. Obviously, an electric instantaneous water heater to serve a bath is out of the question. Such high heat output rates would also be uneconomic for domestic gas-fired water heaters.
Domestic combination boilers are limited to a HWS output of about 20kW. Spray taps are frequently used for wash hand basins in non-domestic buildings because of their very low rate, only about 0.015kg/s. As well as helping to conserve water, a 3kW instantaneous electric heater is just sufficient to heat the water to an acceptable temperature for a single tap. Even so, peak electrical demand would be high in a building containing many such taps.
One disadvantage of the storage system is that it takes a finite time to reach the design temperature once all the hot water has been run off. This is known as the recovery time and depends on the mass of water stored and the power of the heating element. Equations can be arranged to give the typical recovery time of a domestic hot water cylinder (125kg water capacity) based on a 3kW immersion heater for a 50K lift in temperature (storage temperatures will be discussed later): t = 8700s or about two and a half hours. This is rather a long time. Domestic immersion heaters are limited to 3kW for practical reasons regarding the design and cost of domestic electrical distribution installations. When the boiler serves the HWS cylinder, the heat exchanger is rated at about 6kW to give a recovery time of nearer one hour [3]. Instantaneous systems do not suffer from this problem. Although the water flow rate is limited, it is always available.
The second drawback of storage systems is that they occupy more space. The designer could decide to install a smaller storage vessel. For the same heat exchanger duty, this would result in shorter recovery times but would increase the number of times each day when hot water was not available. Alternatively, a larger vessel could be installed of sufficient capacity to allow it to meet the maximum demand during the day with continuous recovery.
The size of domestic hot water cylinders has become very much standardised, being a compromise between physical space requirements and hot water availability. For non-domestic HWS, the range of sizes of storage vessels and LPHW heat exchangers available is considerable. Some designers have opted for large storage volumes in the past, but an increasingly common system nowadays is the ‘hot water generator’. This has a small water storage volume to meet maximum demand for a few minutes combined with a direct, gas-fired heater to give very short recovery times. Guidance on how to select appropriate storage volumes and heat exchanger duties is given in manuals, handbooks, scientific literature, and other technical documents.
The waiting time at taps for acceptably hot water to reach the user has a further economic implication in commercial buildings: loss of workforce productivity. In order to reduce waiting time, water must be available within the pipework at acceptable temperatures at all times (during occupancy). Further, legionella is a major concern and maintaining a high water temperature in all parts of the pipework will reduce the risk. As insulation will only slow down the cooling rate of the water and not stop it, other measures are needed.
There are two approaches: trace heating of the pipework or continuous water circulation. In both cases, reasonable standards of insulation are still required. A typical system utilises a return circuit. The system is designed to provide a continuous flow of hot water around the circuit, just sufficient to prevent the water temperature at the furthest tap from the cylinder from falling below the required value. A small pump generates the flow rate. The return pipe is connected to the end of each supply branch so that there is a continuous circulation of water through all branches. It would be impracticable to provide a constant circulation through pipes serving an individual tap.
In designing a storage system, gravity (or in unvented systems, mains pressure) provides the flow to the taps. Pipework must therefore be sized with this available pressure in mind. On extensive systems, the available head per metre of pipe can be relatively small, resulting in large diameter pipework being required if the desired flow rates are to be achieved. This increases both capital costs and heat loss rate. It may be cost-effective to utilise a pumped system with more economically sized pipework in such instances. The pump will need to be able to provide the peak demand flow rate while, for much of the time, having to operate at significantly reduced duty. A boosted pump set complete with a small expansion vessel (as is used on boosted cold water systems) may be worth considering for trace heated systems.
At least for domestic buildings, solar hot water is slowly becoming more popular worldwide. This, it must be said, is because of environmental concerns and the desire to save primary energy and reduce CO2 emissions. Even in often cloudy weather conditions, solar panels can easily contribute 50% or more of the annual hot water requirements of dwellings [4].
Generally, the solar hot water system consists of three main parts: a collection device, a storage facility and a distribution system. The material of the double tube outside is glass for that it is pervious to light, and it holds vacuum better and longer [5]. During sunny days, direct and diffuse light (including the light reflected by the aluminium layer below evacuated tubes) firstly strikes the glass tube. It is converted into heat energy by dark selective coating, absorbing most solar radiation with a low reflection level.
Then the heat is transferred to the copper U-pipe through an aluminium fin, pasted into the inner tube inside. The structure of high vacuum space between the outer tube and inner tube ensures excellent insulation and cut heat losses caused by conduction and convection. Therefore, the fluid temperature can rapidly increase, even exceeding 100°C. However, the fluid will not be boiled so quickly because the high pressure inside the pipes makes the boiling point higher than pure water.
Despite the advantage of vacuum and glass allowing high absorption and low reflection, they make the evacuated tubes seem more fragile. However, the strong cylinder shape can be a feasible solution due to its high tolerance to pressure.

Figure 3. A Standard solar water heating system. Source: https://www.researchgate.net/figure/Standard-solar-water-heating-system_fig1_272646658
Despite the solar energy being free, the efficiency of the panel is still vital as it reduces the area of panels needed and, therefore, capital cost. There may also be limitations on the roof area available and suitable for siting the panel. This needs to be predominantly north-facing (in the southern hemisphere) and at an angle between 30° and 60° to the horizontal. It should also not be shaded by trees and other buildings.
Today, retrofitting domestic hot water systems commonly connects the existing system with new solar storage upstream and uses the existing hot water boiler as a backup heater. Some retrofitted systems make use of thermo-syphoning and are therefore dependent on new well-performing storage for that purpose. Existing installations are often oversized in volume since large design loads have been used before and because domestic hot water consumption has decreased.
Combined with low levels of insulation, such oversizing causes significant system heat losses. When using the existing storage as solar hot water storage, the thermal losses in the system can be decreased since the solar water temperature is lower than the backup temperature. In cases where it is possible to know when the existing boiler is close to the end of its lifetime, it can be advantageous to change the current storage.
As the chilled-water temperature rises, so do the refrigerant temperature and pressure for a given chiller. Conversely, as the leaving chilled-water temperature drops, the refrigerant temperature and pressure must also drop. The outcome of leaving chilled-water temperature change on power consumption can be 1.8 to 4.0 per cent per degree Celsius. Always consider the work the compressor must do and the energy demand of the entire system—not only the chiller. It is worth remembering that although reducing leaving chilled-water temperature makes the chiller pay, it may reduce the overall system energy demand because less water is pumped through the system.
The evaporator is reactive to the water flow rate. Excessive flow may result in erosion, vibration, or noise due to high water velocity. But insufficient flow reduces heat-transfer effectiveness and causes poor chiller performance. Some designers are concerned about fouling caused by low flow rates. These concerns are unnecessary since the chilled-water circuit is a closed system, thus reducing the chances of materials entering the system and causing fouling [6]. Chilled water flow through the evaporator must be kept within the specified minimum and maximum limits.
Some chiller controls can accommodate minimal flow variation during machine operation. Other, more sophisticated, allow some flow variation. Some chillers can handle flow rate changes of up to 50% per minute or more, while others can only handle up to 2% per minute. It’s critical to match chiller capabilities to system needs. Before altering the flow through the evaporator in a chiller, contact the manufacturer to find out what the maximum rate of flow variation is.
Besides, the condenser itself is also sensitive to the water flow rate. The causes and effects are similar to those mentioned above for the evaporator. For that reason, condenser-water flow through the chiller should be kept within a specific range of limits, except during transient startup conditions. Long-term fouling of the condenser tubes can occur if the water velocity through the tubes is far too low for extended periods of time and that water is particularly hard. A study testing many internally-enhanced condenser tubes at low speed (around 1.07 m/s) and high water hardness found that this phenomenon is not expected in commercial installations. Employing best maintenance practices and water quality control, all of the tubes tested were probably suitable for long-term-fouling applications.
Heat transferred from the loads can be regulated in a few different ways:
Three-way valve
A three-way control valve regulates the volume of water passing through a coil in response to loads. The valve diverts unused water around the coil and requires a steady flow of water in the system, regardless of load. The temperature of the fluid leaving the three-way valve is reduced at part-load conditions, which is a disadvantage of this bypass and can be a major contributor to the so-called “low ΔT syndrome”. Three-way valves are deployed in many existing systems, especially those with constant-volume pumping.

Figure 4. Schematic representation of a three-way valve. Source: https://www.tranebelgium.com/files/book-doc/12/fr/12.1hp13yp1.pdf
Two-way valve
A two-way flow modulating valve at the coil performs the same water throttling function as the three-way valve described above. The twisted wire sees no difference between these two methods; the chilled-water system, however, does. In the case of the two-way valve, all flow in the coil circuit is strangled, so no water is bypassed. Thus, a system using two-way valves is a variable-flow chilled-water system. The water temperature leaving the coil is not diluted by bypass flow, so at part-load conditions, the system return-water thermal load is higher than with three-way valve control.
Variable-speed pump
Using a pump for each coil, the flow may be tuned by adjusting the pump speed. There may be no restraint valves at the coil in such systems, which lowers the cost of the valve and its installation but raises the fee of the coil pump and maintenance.
Face-and-bypass dampers
Control variation could also be performed through an uncontrolled or “wild” coil. In this configuration, control of the conditioned air supply is achieved by employing face- and bypass dampers that let a portion of the air bypass the coil surface. Advantages of this scheme are the suppression of control valves and improved part-load dehumidification. A disadvantage is that all the water is pumped continuously; however, this arrangement may still work economically in systems with very small water pressure drops.
Most water-cooled, chilled-water systems use a constant condenser water flow rate. The condenser water flow rate, on the other hand, can be adjusted between the chiller’s minimum and maximum flows. But reducing the condenser water flow rate affects the pumps, chiller, and cooling tower power consumption, as described in this subsection.
Pump power for the condenser water pump is reduced since the flow rate and pressure drop through the pipes and condenser are both reduced. Compressor power is raised because the temperature of the water exiting the condenser rises as the flow rate falls. This increases the compressor lift and, as a result, its energy consumption at a given load.
As previously stated, the water returning to the cooling tower is at a higher temperature. The heat exchanger’s efficiency improves as a result. However, the water flow rate is reduced, either boosting or diminishing the cooling tower’s efficacy. As a result, lowering the flow rate through the cooling tower reduces or increases energy use depending on the load.

Figure 5. A set of cooling towers. Source: https://waterchillers.com/blog/post/how-cooling-tower-vs-chillers-work
Water-cooled chillers need condenser-water-system variations to be acknowledged. Most important, the pump inlet must have a sufficient net positive head, and this often involves locating the pump beneath the cooling-tower sump.
In some applications, each chiller has a dedicated tower. This is most likely to take place when chillers, and their complementary cooling towers, are acquired at different times during the facility’s life—such as when add-ons are completed. A much-used arrangement has a solitary cooling-tower sump with manifolded pumps, one condenser water line, and separate, smaller pipes for each chiller. This offers a number of pros: pumping redundancy, any cooling-tower cell can run with any chiller (as long as cooling towers cells are isolated), hydraulics are generally more straightforward than on the chilled-water side, among others.
Heat pumps are devices that force heat flowing from a low-temperature medium to a high-temperature medium. Geothermal-heat pumps, in particular, make use of the underground to extract or inject heat from or to it. A geothermal heat pump system is typically composed of a ground loop tubing that passes through the geothermal well, transferring energy to a circulating fluid (usually a high-concentration solution of salt called brine), a heat pump and a heat distribution system. Pumps circulate water and brine.
The heat pump of a typical off-grid system extracts heat from the brine and transfers it to a hot water thermal energy storage system (TESS). The heat extracted from the brine can either come from the geothermal well or from a cold-water TESS. Hot water is used for space heating and hot water consumption, whereas cold water is used for space cooling. Geothermal heat pumps influence thus both hot water and coldwater circuit demand of off-grid systems.
Geothermal heat pumps can operate in three modes:

Figure 6. Scheme of the geothermal heat pump for the three operating modes(a) Simultaneous mode (cooling dominant), (b) Simultaneous mode (heating dominant), (c) Cooling mode, (d) Heating mode. Source: https://ietresearch.onlinelibrary.wiley.com/doi/epdf/10.1049/iet-rpg.2018.5505
Heat pumps are able to switch from one mode to the other, although the preferred mode is the simultaneous one. Switching between the modes is accomplished by means of controllable valves. Fig. 1 shows the different modes. In the simultaneous mode, the heat pump basically transfers heat from the cold water TESS to the hot water TESS. According to the demand, a simultaneous mode is differentiated into cooling-dominant and heating-dominant [7].
The geothermal well allows absorbing excess heat. For example, in the cooling-dominant mode in Fig., excess heat extracted from the cold water TESS is injected into the geothermal well if heat transfer is larger than the thermal demand of the hot water circuit. In the heating-dominant mode, by contrast, additional heat is extracted from the geothermal well to supply thermal heat demand. In the cooling mode, the heat pump transfers heat from the cold water TESS to the geothermal well (see Fig. c). A bypass valve allows for controlling the temperature of the brine. In the heating mode, the heat pump extracts heat from the geothermal pound and injects it into the hot water TESS. If the temperature of the hot water tank increases above a certain level (e.g. 70°C), the heat pump becomes unable to inject more heat into the hot water TESS.
[1] Refrigeration System. (n.d.). Applied Industrial Energy and Environmental Management, 355–393. doi:10.1002/9780470714379.ch11
[2] 2008 ASHRAE HVAC Systems and Equipment Handbook, chapter 39, “Cooling Towers.
[3] Day, A. R., Ratcliffe, M. S., & Shepherd, K. (2008). Heating systems, plant and control. John Wiley & Sons.
[4] Duffie & Beckman (1992) Solar Engineering of Thermal Processes, 2nd edn. John Wiley & Sons, New York.
[5] https://www.renewableenergyhub.co.uk/main/solar-thermal-information/the-different-types-of-solar-thermal-panel-collectors/
[6] Webb, R.L. and W. Li. “Fouling in Enhanced Tubes Using Cooling Tower Water, Part I: Long-Term Fouling Data.” International Journal of Heat and Mass Transfer 43, no. 19 (October 2000): 3567-3578.
[7] IET Renew. Power Gener., 2019, Vol. 13 Iss. 6, pp. 961-972© The Institution of Engineering and Technology 2019.
[8] Bischi, A., Basile, M., Poli, D., Vallati, C., Miliani, F., Caposciutti, G., … & Desideri, U. (2021). Enabling low-voltage, peer-to-peer, quasi-real-time electricity markets through consortium blockchains. Applied Energy, 288, 116365.
[9] Vitalik Buterin et al. A next-generation smart contract and decentralised application platform. White paper, 3(37), 2014.
[10] Mishra, S., Crasta, C. J., Bordin, C., & Mateo‐Fornés, J. (2021). Smart contract formation enabling energy‐as‐a‐service in a virtual power plant. International Journal of Energy Research.
[11] Rodríguez, P. Standardization of Blockchain-based Applications in the Energy Sector (Doctoral dissertation, University of Freiburg).
[12] https://polkadotters.medium.com/energy-web-chain-time-to-disrupt-the-analog-energy-era-dfc73aa088ab
[13] Regulation No 1227/2011 of the European Parliament and of the Council of 25 October 2011 on wholesale energy market integrity and transparency (REMIT), available at https://www.emissionseuets.com/remitrecordswholesaleenergymarkettransactions
Liquefied Petroleum Gas (LPG) is a valuable energy source used worldwide for numerous business applications in transportation and industry. Its market growth will result in the need for additional facilities to produce and transport these fuels in the foreseeable future. As a result, new technologies will emerge to address the cost, safety, and reliability issues this expansion may create.
Propane (C3H8) is a hydrocarbon and is sometimes referred to as liquefied petroleum gas, LP gas or LPG. Liquefied petroleum gas or liquid petroleum gas (LPG or LP gas), also referred to as simply propane or butane, are flammable mixtures of hydrocarbon gases used as fuel in heating appliances, cooking equipment, and vehicles. Propane is obtained from both natural gas processing and crude oil refining. It is non-toxic, colourless, and virtually odourless. As with natural gas, an identifying odour is added so the gas can be readily detected.
The term Liquefied Petroleum Gas comprises basically the two gases, propane and butane, and their mixtures because of their properties and characteristics. Both gases exist in the liquid state at room temperature under relatively low pressure, of less than 9 bar. That is why they are also called liquefied petroleum gases. Liquefaction diminishes the volume of LP gases by a factor of approximately 250 [1].
Propane and butane are both alkanes, i.e. short-chain saturated hydrocarbons. The former is a molecule with three carbon and eight hydrogen atoms. The latter consists of four carbon and ten hydrogen atoms and has two isomers, normal butane and isobutane; n-butane and isobutane share the same chemical formula (C4H10) but display different spatial arrangements of their atoms and also have other properties, for example, a boiling point at –0.5°C for n-butane vs. –12.8°C for isobutane. Due to their material and combustion properties, both liquefied petroleum gases suit many possible applications. When used as fuel in vehicles with an internal combustion engine, LPG is also called autogas.
Liquefied Petroleum Gas (LPG) should not be confused with Liquefied Natural Gas (LNG) or Compressed Natural Gas (CNG), both of which consist mainly of the natural gas methane (CH4). LNG is stored as a cryogenic liquid cooled at –161°C; CNG is kept under high pressure of at least 200 bar.

Figure 1. LPG gas mix. Source: https://www.shell.com/business-customers/shell-liquefied-petroleum-gas-lpg.html
Sometimes known as propane, LPG is a flammable hydrocarbon gas used commonly as a non-toxic, sulphur-free fuel. It is chosen over several other energy fuels since it burns with lower sulphur and carbon emissions and thus is more environment-friendly. Easy storage makes it a highly portable fuel and functional source of energy for industries located in areas where pipe gas supply is not available.
The petrochemical industry will continue to lead demand growth, with ethane, LPG and naphtha together accounting for 70% of the forecast increase in oil product demand to 2026. The LPG market is projected to grow from $129 billion in 2021 to $212 billion in 2028 at a CAGR of 7.3% in the forecast period 2021-2028. The global impact of COVID-19 has been unmatched and staggering, with LPG witnessing a negative demand amid the pandemic across all regions. The global market outlook [3] exhibited a drop of -2.22% in 2020 as compared to the average annual growth during the previous three-year period. The rise in CAGR during the market forecasts is attributable to this demand and growth rate, returning to pre-pandemic levels once most prevention measures are over.
LP gas, first and foremost, serves as a feedstock for ethylene production through the cracking process and syngas production through steam conversion. The critical factor that positively impacts is the sustained growth in the automotive industry and the increasing requirement for lower carbon footprints and energy-efficient fuels. Furthermore, rampant LPG adoption by domestic end-users is providing a boost to market growth. In line with this, shifting consumer predilection from high-cost conventional fuels such as petrol and diesel to low-cost LP gas is also a contributing factor. Additionally, the increasing utilisation of LPG by the industrial and commercial sectors is another growth-inducing factor.

Figure 2. Autogas (LPG) tank valves. Source: “File:AutogasAPATankValves.JPG” by Athol Mullen is marked with CC BY-SA 3.0.
Global consumption of autogas has increased overwhelmingly over the last two decades and hit a new level of 27.1 million tonnes in 2019. Then, the upheaval derived from the COVID-19 emergency resulted in a significant fall in the consumption of autogas with other transport fuels in 2020. The autogas fleet continues to grow steadily, with almost 27.8 million autogas vehicles used actively worldwide. The share of LPG in total consumption of automotive fuels varies widely among countries, ranging from 0.03% in the U.S. to over 22% in Turkey. The great disparity in the progress of autogas in competing against gasoline, diesel, and other conventional fuels is explained mainly by distinctions in government incentive policies.
Similar to liquefied natural gas (LNG), the trade in LPG accounts for a large proportion of the global clean energy consumer market. Moreover, the LPG trade volume has grown over recent years, and it is forecasted to maintain growth in the near future (Sieminski, 2015). However, because of the heterogeneous geospatial distribution of both the source and the market, the supply and demand sides of this trade require transportation between ports via LPG vessels. Therefore, investigating the long-term global LPG maritime transport network based on the port scale will help improve the understanding of global LPG trade patterns and their evolution. Moreover, such research will provide scientific support for the adjustment and optimisation of the energy policies of countries involved in this trade’s supply and demand sides, helping to guarantee energy supply security.
The specific characteristics of maritime transportation transshipments, certain differences in the functional capacity of different ports, and transshipments via cargo vessels around hub ports have led to the formation of a series of closely linked trading communities. However, the study of LPG trade at the national scale cannot reflect the fine-grained details of global LPG trade patterns. Fortunately, mass trajectory data on cargo vessels collected by the automatic identification system (AIS) can reflect the real-time operational status of maritime transportation and provide data with great potential to support the study of global LPG trade patterns at the detailed port scale [4].
The large-scale production of natural gas exploitation projects since 2014, especially the rise of the North American shale gas industry and the continuous expansion of the oil refining industry in Iran and Qatar in the Middle East, have simultaneously led to the rapid growth of LPG production. During 2013-2015, the number of ports, routes, and journeys involved in LPG transportation all showed a trend of rapid growth with annual growth rates of 10.0%, 21.3%, and 34.3%, respectively. In the same period, because of stimulation attributable to lower oil and gas prices, the civil consumption of LPG in Asia and Africa increased considerably. Furthermore, the increase in propane dehydrogenation capacity in China has further supported the rapid growth of LPG demand.
Moreover, according to statistics compiled by the International Energy Agency [5], global LPG consumption exhibited a trend of increase from 2016to 2017, in stark contrast to the reduction in the scale of maritime LPG transportation that occurred during the same period. The main reason is that with further expansion of the Panama Canal, the proportion of LPG exported directly from the world’s largest LPG exporter (i.e., the United States) to the Asia-Pacific region using very large gas carriers was increased. Consequently, LPG is transported by large vessels to the ports of the Panama Canal and then transshipped by smaller vessels to destination ports in the Asia-Pacific region.

Figure 3. Spatial distribution of the ports involved in LPG trade by 2017. Source: https://doi.org/10.1016/j.jclepro.2019.119883
Asia’s liquefied petroleum gas markets are proving a magnet for suppliers as demand continues to grow across the region [6]. Several sectors are driven by demand growth, from households to petrochemicals. In the Indian sub-continent, automotive use is rising. Future growth markets include power generation and marine bunkers.
Asia is a net importer of LPG and, as such, is a target for countries with surplus production. The Persian Gulf is the region’s traditional external supplier. New gas developments in Iran have made increasing volumes available for export, while Iraq has recently become a net exporter after years of having to import LPG. The US, which has more LPG available both from gas plants and refinery production, has emerged as an aggressive seller in the region since early 2016. Booming US exports helped to create a glut in markets east of Suez, causing stock levels to rise. However, rising demand is likely to return as the dominant factor in determining market direction in the longer term. The two main Asian markets for LPG are China and India.
China has a significant petrochemical demand, both for steam crackers and propane dehydrogenation (PDH) plants (see section Propane Dehydrogenation). The principal feedstock for the steam crackers is naphtha. LPG is sometimes substituted, however, when a lighter yield is required and when the price of LPG is sufficiently below that of naphtha. China has also been opening and envisaging new PDH plants; more than 30 new plants with a capacity of more than 30 million tons per year are currently under construction in the red dragon nation or planned for the coming years [7].
There are many other large industrial users of LPG, including several units producing gasoline components, such as alkylate, isomerate and methyl tertiary butyl ether (MTBE). LPG is also used as an industrial fuel, where its use as a substitute for heavy fuel oil and coal is being encouraged by new legislation on air quality. It is used in addition as a refinery fuel, as well as being processed in downstream units. Household use is also large, at 40% of the total, the same proportion as petrochemical use, leaving the remaining 20% for general industrial use. Total demand is about 1.7 mn bpd, of which 0.7 is imported.
Asia’s other large area of LPG use in the Indian sub-continent. In India itself, the government is heavily promoting the use of LPG by households instead of kerosene and biomass. In pursuit of this, it is significantly extending the distribution network for LPG and encouraging the establishment of dealerships to supply the retail market. India imports about half its domestic LPG needs and is increasing its import capacity in anticipation of a rising volume of imports. Most of its imports come from the Persian Gulf, but India will probably need to increase the number of suppliers shortly: and the US looks like a likely candidate.
Pakistan’s consumption and imports are also rising rapidly. As in India, the government is encouraging the greater use of LPG by households. It is also vigorously promoting it as an automotive fuel in order to improve air quality in large urban areas, telling LPG sellers to reduce their prices in order to make it cheaper than gasoline. In Bangladesh as well, its use is increasing, partly as a result of a shortage of natural gas; and in many other parts of Asia, demand is also rising.
Liquefied petroleum gas (LPG) is a viable alternative gaseous fuel not only as a replacement for both petrol and diesel fuel used in SI and CI engines but also as a basis for reducing NOx, soot and PM emissions. LPG has a high calorific value compared to other petroleum fuels (petrol and diesel). Therefore, greater engine power is possible for lower fuel consumption. The heat of vaporisation of LPG is lower than that of diesel, bringing beneficial effects of the mixture formation, especially by direct injection process, because vaporising LPG consumes less heat. LPG is inexpensive, clean burning and has a relatively low carbon content [8].
While waiting for eco-friendly vehicles to become adequately entrenched in the market, governments have extended recent support to the use of LPG vehicles, which are expected to play an intermediary role between gasoline and diesel vehicles and electric vehicles (EVs) and hydrogen fuel-cell vehicles (HFCVs). LPG is a mature alternative fuel source that can be used as an auxiliary fuel in dual fuel compression ignition engines together with diesel oil or in special spark ignition engines. The use of LPG in transportation is concentrated in a few countries (Russia, Poland, Korea, and Turkey), and it is mainly used in bi-fuel light-duty vehicles.
Globally, gasoline and diesel account for approximately 80% of the total energy consumption by the transportation sector, followed by biofuels, liquified natural gas, compressed natural gas, and LPG. With the rise in environmental awareness, LPG vehicles have been recognised as an alternative to internal combustion engine vehicles (ICEVs) since the 2000s, and LPG consumption has steadily increased. Figure 4 shows LPG consumption and the number of LPG vehicles in countries with high autogas consumption. The share of LPG vehicles in the total number of registered vehicles was the highest in Turkey (22%) in 2017, followed by Ukraine (17%), Poland (11%), and Korea (8%).

Figure 4. LPG consumption and vehicle fleets in 2017. Source: https://www.wlpga.org/publication/2018-autogas-incentive-policies-report/
Notably, the LPG consumption level in the transportation sector is the highest in South Korea, followed by Turkey, Russia, and Poland. This is because taxis account for a large share of LPG consumption in South Korea, while Europe, a major LPG market, has a large proportion of private cars. Most taxis in South Korea use LPG, as the oil tax is the cheapest for this fuel. South Korea is also better equipped with LPG charging stations compared to other developed countries. In fact, as of 2016, the proportion of LPG stations in Japan, the United States, and France was only 5%, 2%, and 1%, respectively, while that in Korea was approximately 20% (Korea LPG Association, 2017).
Propane dehydrogenation (PDH) is a process that converts propane into propylene, which is a chemical intermediate used to produce polypropylene (PP). PP is widely used to make a variety of plastics and fibres. The PDH process also produces hydrogen as a by-product. The traditional source of propylene was petrochemical (steam) crackers, many of which in Asia were run on naphtha. This heavy feedstock produces large amounts of propylene as a co-product.
Global demand for propylene has been growing rapidly. However, many new steam crackers use ethane as a feedstock, which is lighter than naphtha and produces a lot less propylene, leading to an increasingly tight market in propylene and PP. Asian and other petrochemical producers have responded by investing in purpose-built propylene plants in the form of PDH units, and more are likely to be added.
Propylene is a vital intermediate petrochemical whose derivatives include:
Cumene – used to make epoxy resins and polycarbonate
Propylene oxide
Although its demand has been unwaveringly increasing, the supply has been constrained — steam crackers focused more on producing ethane than propylene, and that may be the main reason. Likewise, there is the shale revolution in the US. The North American country produces more of the lighter crude which does not produce as much propane as heavy crude.
The majority of the global capacity was co-production, which could not keep up with the increasing demand for PP. This was further deranged by massive investments in US LPG and LNG transportation terminals. Shipping refrigerated ethane and LPG to the booming economies of India and China further lessened the co-product co-production of propylene.
This situation has been solved by the “on-purpose” production of propylene. Several other factors make “on-purpose” production of propylene represent economic sense, e.g., demand for propylene has outpaced the demand for ethylene in recent years and is forecasted to do so soon.
Most of the “on-purpose” production of PP is attributed to propane dehydrogenation because recent advancements and technical maturity in the process have made the PDH competitive with the co-production technologies in the market.
Hydrogen is an environmentally friendly fuel since its combustion only generates water. It can also be produced by renewable feedstocks such as biomass, which can be shown to be carbon-neutral. However, renewable resources may not be enough to guarantee a steady supply of hydrogen. Hence, it is still necessary to use fossil fuels such as natural gas, liquefied petroleum gas, naphtha, and others to fulfil its demand, even though it is unsustainable in the long term.
The hydrogen economy has raised interest in studying the steam reforming of light hydrocarbons, such as the ones found in LPG (propane, butane, propene, and butene). LPG has considerable advantages over other fuels since it can be easily handled, transported, and stored. Many cities already have an existing infrastructure for LPG, e.g., for cooking, which makes LPG a promising fuel to generate hydrogen onshore.
Hydrogen production by steam reforming of LPG using supported perovskite type precursors. Literature reports several paths of LPG conversion into Hydrogen, such as partial oxidation (POX), dry (DR), and autothermal (ATR) reforming processes. Another commonly reported route for hydrogen production is the steam reforming of LPG [9].
Steam reforming reactions of propane and butane can be described through equations 1 and 2, respectively, as well as the water-gas shift reaction (equation 3):
(1) C3H8 + 3 H2O → 3 CO + 7 H2 ᐃH0 (298 K) = +497 kJ/mol;
(2) C4H10 + 4 H2O → 4 CO + 9 H2 ᐃH0 (298 K) = +649.9 kJ/mol;
(3) CO + H2O ↔ CO2 + H2 ᐃH0 (298 K) = +41.2 kJ/mol
Liquefaction plays an essential part in the storage and transport of hydrogen as an energy source. In the liquid state at the boiling point, at –253°C (20.3 K) and 1.013 bar, hydrogen has a density of 70.79 g/l. At the melting point, at –259.2°C (13.9 K) and 1.013 bar, its density is 76.3 g/l. Liquefaction increases the density of hydrogen by a factor of around 800, and the storage volume falls correspondingly.
For the purposes of comparison, when Liquefied Petroleum Gas (LPG) is liquefied, the density or volume factor, depending on the proportion of butane/propane, is around 250; when methane is liquefied to form Liquefied Natural Gas (LNG), the factor is around 600 [10].
DME (Dimethyl ether = CH3-O-CH3) is a versatile, chemically stable aerosol propellant with a special solvency power for both polar and non-polar ingredients. DME is an isomer of ethyl alcohol and has a low boiling point. It is colourless, virtually odourless, has a low surface tension and a low viscosity. Due to its high solubility coefficient, the propellant DME also acts as a solvent in aerosol formulations. This property makes DME a precious component in aerosol formulations which contain substances that are difficult to dissolve.
| Chemical formula | Temperature | CH3 – O – CH3 | Measurement |
| Mol. Mass | NA | 46.07 | g/mol |
| Boiling point | NA | -24.9 | °C |
| Vapour Pressure | 20° C | 5.1 | bar (abs) |
| NA | 50° C | 11.5 | bar (abs) |
| Density liquid | 20° C | 668.3 | kg/m³ |
| NA | 50° C | 615 | kg/m³ |
| Relative vapour density | 20° C | 1.59 | (air = 1) |
| Solubility | NA | NA | NA |
| DME in water | 20° C/1 bar | 5.7 | % (m/m) |
| NA | 20° C/4.8 bar | 36 | % (m/m) |
| Water in DME | 20° C/4.8 bar | 5.5 | % (m/m) |
| Net calorific value, liquid | NA | 28.43 | kJ/kg |
| Ignition Point | DIN 51794 | 235 | °C |
| Kauri Butanol Number | NA | 91 | NA |
| Solubility coefficient | NA | 7.3 | NA |
| Surface tension (liquid) | 20° C | 0.0125 | N/m |
| Viscosity gaseous | 20° C | 0.0091 | mPas |
| Viscosity liquid | 20° C | 0.11 | mPas |
DME has attracted increasing attention as a clean and environmentally friendly energy; it can be used for power generation, automotive fuel, domestic cooking fuel, hydrogen source for fuel cells, and as feedstock for various chemicals. Besides, other properties that make DME so attractive are: (a) the high oxygen content of 35% by weight, which provides smokeless combustion; (b) a cetane number of 55-60 and a boiling point of 225 C, which can reduce ignition delay time and lead to fast mixture formation, excellent cold-temperature ignition. Considering the similar physical and chemical properties to LPG, DME can replace LNG, coal gas and LPG as civil fuel, LPG and DME. However, as a newly-developing fuel, its relevant production, distribution, transportation, storage and burning devices have not matured enough.
Related studies have shown that with the blending of low content DME, DME/LPG blended multi-fuel combustion efficiency is significantly improved. The original LPG distribution, loading and burning devices need only minor modifications. This promotes the rapid development of DME clean fuel while maximising cost savings. In recent decades, DME/LPG blended multi-fuel has been preferred by more and more countries, predominantly Asian countries such as Japan, South Korea, Indonesia, and China. For instance, it has been investigated that LPG/DME blended fuel with DME content of 30% or less has been widely used in domestic cooking and heating in China [11]
Shell and other petrochemical firms offer high purity Dimethyl ether (DME) for all cosmetical and technical uses. From their German production in the Rhineland Refinery Wesseling, the oil & gas giant delivers to production facilities all over Europe.
Offshore terminals are required to load and offload LPG into tankers. For locations with sufficiently deep water access, terminals may consist of jetty structures and breakwaters where tankers can be moored, and offloading can take place via standard loading arms. As terminal location concerns build over pressures from environmental and public safety issues, there is a trend to reconsider moving terminal locations offshore. Given that both production and import of LPG will move more and more offshore, it is recognised that there is a need for a safe, efficient, and reliable transfer system.
As an alternative to trestle-supported piping, subsea pipelines may be considered. A subsea pipeline can be used to transport the LNG/LPG from/to an offshore terminal, thereby eliminating the need and cost for a connecting trestle. With current subsea cryogenic pipeline designs, these fuels can be efficiently transferred over distances of up to 20 miles (Figure 5).
The most dominant advantages of LNG/LPG offshore terminals are the lower costs for construction and operation and the possibility of locating the terminal in deeper water, thereby eliminating the need for dredging [12]. In addition, the increased availability, safety, and reduced voyage time, as LNG carriers need not enter and maneuver in congested waters. LNG/LPG carrier berths can be located away from confined waterways, thereby increasing safety and security while at the same time preventing costly civil works. Furthermore, the impairment of new and existing shipping traffic will be minimised.

Figure 5. Typical subsea pipelines layout with loading jetty. Source: https://doi.org/10.1002/9781118476406.emoe468
Subsea cryogenic pipelines are emerging technologies that are essential for the new generation of offshore LNG loading and receiving terminals. The major challenges for these systems include the managing of pipeline contraction due to the low temperature of the LNG, the thermal efficiency of the insulation system chosen, the reliability of the system, the ease of construction, and the ability to monitor, inspect, and, if necessary, repair in a timely manner.
Of the many types of subsea pipeline configurations now being considered for use in subsea applications [13], the most common compact systems being developed are as follows based on thermal efficiency and cost:
The first major project involving a subsea LPG pipeline occurred in Peru and is referred to as the Camisea Offshore Loading System.
[1] https://epub.sub.uni-hamburg.de/epub/volltexte/2017/68119/pdf/shell_lpg_studie.pdf
[2] Propane, liquefied. Trade Data..
[3] https://www.fortunebusinessinsights.com/lpg-liquefied-petroleum-gas-market-106373
[4] Peng, P., Cheng, S., & Lu, F. (2020). Characterising the international liquefied petroleum gas trading community using mass vessel trajectory data. Journal of Cleaner Production, 252, 119883.
[5] https://www.iea.org/reports/energy-access-outlook-2017
[6] LOOKING AHEAD: Rising Asian LPG demand looks set to soak up last year’s oversupply. (2017). Oil and Energy Trends, 42(7), 14–15. doi:10.1111/oet.12489
[7] China Market Insider. Why Is There a PDH Plant Construction Boom in China?’.
[8] Karimi, M., Wang, X., Hamilton, J., Negnevitsky, M., & Lyden, S. (2021). Status, challenges and opportunities of dual fuel hybrid approaches-a review. International Journal of Hydrogen Energy, 46(70), 34924-34957.
[9] Borges, R. P., Moura, L. G., Spivey, J. J., Noronha, F. B., & Hori, C. E. (2020). International Journal of Hydrogen Energy, 45(41), 21166-21177.
[10] Adolf, J., Balzer, C. H., Louis, J., Schabla, U., Fischedick, M., Arnold, K., … & Schüwer, D. (2017). Energy of the future?: Sustainable mobility through fuel cells and H2; Shell hydrogen study.
[11] Zhang, Q., Qian, X., Chen, Y., Li, M., Wu, D., Yuan, M., & Wang, D. (2020). Effect of DME addition on flame dynamics of LPG/DME blended fuel in tail space of closed pipeline. Energy, 202, 117746.
[12] Prescott, C. N. (2017). LNG/LPG Subsea Loading Lines. Encyclopedia of Maritime and Offshore Engineering, 1-14.
[13] https://onepetro.org/OTCONF/proceedings-abstract/09OTC/All-09OTC/OTC-19824-MS/35857?redirectedFrom=PDF
There has been a considerable increase in the demand and use of LPG for various purposes. One of the most important uses of LPG in Africa is as cooking fuel. Over the years, there has been a considerable increase in the number of LPG storage and distribution terminals in Africa due to the increasing demand.
These LPG storage terminals/depot’s sizes vary depending on the business model. Though there is no clear classification of LPG facilities based on storage capacity, I have tried to differentiate these facilities based on my experience. There has been an increase in skidded LPG dispensing facilities with storage capacity ranging from below 2.5 to above 50 metric tons. These facilities I have termed mini LPG facilities. These facilities can be easily installed and relocated from one point to another. The mini-size facilities are the most common in Nigeria and many West African countries.
In addition to the mini-storage facilities are medium storage facilities with storage capacities ranging from hundreds to a thousand metric tons. In these facilities, you may find more than one horizontal storage vessel installed with other equipment required for the facility’s operation.
The last group of storage facilities is the bulk storage facilities with storage capacities above 5000 metric tons. The storage vessels found in these facilities are mostly spherical. In Nigeria in early 2022, Ardova plc performed the ground-breaking for 20,000 Metric tons LPG storage terminal. This facility, when completed, will be the largest LPG terminal in West Africa.
All the above described LPG mini to Mega projects points to the fact that there has been an increase in the demand for LPG.
This article aims to explain various stages of an LPG project focusing on the Conceptual design and feasibility studies. The major focus of this article is on medium and bulk storage facilities.

Figure 1: LPG Storage Terminal
LPG (liquefied Petroleum Gas) is a hydrocarbon compound consisting carbon and hydrogen.
As per NFPA 58 Section 3.3.36 LP-Gas or LPG is any material having a vapour pressure not exceeding that allowed for commercial propane that is composed predominantly of the following hydrocarbons, either by themselves or as mixtures: propane, propylene, butane (normal butane or isobutane), and butylene’s.
LPG has both industrial and domestic applications including;
LPG used for any of the above applications is sourced from a storage facility. These facilities must be properly planned and constructed, not mind the storage capacity. LPG storage facilities are highly regulated because of their hazardous nature and can cause catastrophic fire incidence. These stringent regulations vary across countries. The project complexity increases with an increase in the facility storage capacity. Various tasks are carefully executed to ensure the project is successful.
Though the construction phase of an LPG storage terminal project is the most visible, other phases should be properly executed for the project to be successful. The basic phases of a project are listed below:
In some projects, feasibility studies and conceptual design are executed in a single phase to understand the project’s feasibility better. In some cases, only feasibility or conceptual design is performed; however, the activities should be sufficient to decide whether the project is feasible.
There are different project phases in developing an LPG storage facility, as listed in section 2.0. The number of phases varies per client requirement; however, the basic phases will be briefly explained below. Note the focus of this article is on conceptual design performed together with feasibility studies.
The conceptual design and the feasibility studies stage are the earliest phases of a project. These phases may be executed together because they are quick decision-making gates to determine whether the project should continue or be discontinued before enormous resources are expended. The earliest decision to progress or terminate the project is taken at this stage of the project.
The conceptual design entails idealizing how the project will be executed, documenting the project requirements. All the ideas itemized are evaluated to determine their advantages and disadvantages.
While the conceptual design focuses on the technical requirements and how to execute the project, the feasibility studies focus on determining if the ideas can be executed and are worthy of execution from a commercial point of view.
At the end of this phase, a single report is generated with various attachments generated by all disciplines.
Some of the key considerations and activities performed during conceptual design and feasibility studies are briefly discussed below.
Every investor aims to get value from the business, including revenue. The market size available is a key to the value derived from the business.
LPG consumption data are obtained to determine the volume consumed within a specified targeted area. Forecast consumptions should be included in determining the actual market size available. The previous year’s consumption data should be obtained and extrapolated into future consumption.
The available market data should be properly tabulated with the name of the potential customers and the required product volume. Potential customers may be categorized based on envisaged gas LPG demands. Assuming the project aims to establish a 10,000 metric tons LPG storage depot, having customers with a demand of 100 metric tons is better than having customers whose maximum demand is 2.5MT.
The facility’s minimum and maximum storage capacity can be established based on the available market size. A larger available market implies large storage terminals can be built; however, constructing a large storage facility is not feasible when the market size is small.
Existing and future planned facilities are the major competitors in the available market. The actual consumption within a particular area does not automatically translate into the available market size because the available facilities have secured portions of the market. The storage capacity of the existing facilities should also be considered when evaluating the available market size. Data of planned LPG projects for the selected market area should be considered because when all the facilities come on stream, they will all compete for the available market.
LPG is obtained from either refining crude oil or processing natural gas, meaning LPG is sourced from gas processing and crude refining facilities. During the early stages of the project, all possible sources of LPG should be identified and documented. The sources should be classified either as in-country or outside the country, with the available product quantities documented. Also to be considered is if the potential source has signed an agreement with other customers that can impede the product’s availability at the planned facility. Most of the LPG utilized in West Africa are imported from outside the continent. Over 50% of the LPG utilized in Nigeria is imported.
The question is, how will the products be transported to the LPG storage facility? A single means of transportation may apply. A combination of two or more transportation modes may apply depending on the facility’s size, location, and design philosophy.
All possible options for transporting the product such as rail, pipelines, road, and water using vessels should be evaluated.
Bulk LPG storage facilities receive products via pipelines. The pipelines are connected to offshore berth facilities or directly connected to LPG processing facilities. Medium size facilities may receive products either through pipelines or via trucking. In West Africa, small storage facilities that sell LPG products to consumers mostly receive products via trucking.
For bulk storage and medium storage facilities, pipelines are the most economical means of transporting LPG to the facilities.

Figure 2: Berthed Vessel Offloading Product
As previously stated, LPG storage facility projects are highly regulated with varying requirements across countries. All the required regulations should be documented; a study should be performed if the requirements can be fulfilled. In most countries, regulations prohibit sitting Bulk and medium storage facilities in populated areas. Small size facilities/retailers’ outlets may be sited in a populated area; however, an appropriate distance from all adjoining facilities must be maintained. In addition to the local regulations, international codes and standards govern the design, construction, and operation of LPG facilities. The most prominent are the NFPA codes and standards. Refer to the NFPA website (https://www.nfpa.org/Codes-and-Standards/All-Codes-and-Standards/List-of-Codes-and-Standards) for a list of codes and standards
One of the most utilized code is the NFPA 58 (Liquefied Petroleum Gas Code).
The code covers various requirements, including the spacing between equipment installed in the facility, offset distance between equipment (storage vessels, etc.), adjoining facilities, etc. There are other NFPA codes and standards governing various facilities associated with LPG transportation and operation; refer to sections 1.1 and 1.3 for the scope and application of the NFPA 58 Code.
A preliminary project impact study on the environment and community should be conducted. Note the impact should include both positive and negative impacts. Environmental Impact Assessment (EIA) should be performed in further stages of the project.
At the early stage of the project, critical stakeholders should be identified. Note that stakeholder identification will continue till the end of the project. Identified stakeholders should be categorized as either major or minor, supportive or not etc.
Only preliminary designs are performed at this stage of the project. The key driver of the preliminary design is the process design. A summary of high-level design performed by each department are listed below
The process design drives the entire conceptual stage of the project. The process should consider possible future expansion projects, an alternative source of products etc. below are key deliverables prepared by the process discipline.
A process flow diagram covering the entire facilities should be developed at this stage of the project, i.e., it should cover from the point of product reception to the point of product transfer to consumers. Assuming the product will be received from a vessel/ship and further transferred via a pipeline to the storage facility, the process flow diagram should capture the entire process.
The below image shows a typical process flow scheme for an LPG storage facility.

Tank sizing is performed based on the envisaged storage capacity. The decision on the storage size may be based on a market survey performed or solely based on client requirements. Assuming the monthly demand for LPG is 100 metric tons after conducting a market survey, the client might require the facility to be designed for monthly storage of 150 metric tons. The type of storage vessel (spherical or horizontal) should be defined at the conceptual design stage. Spherical storage vessels are favoured for bulk storage facilities because they occupy lesser space than horizontal vessels. Small storage facilities favour horizontal vessels because they can be shop fabricated and easily installed on-site.
Technically there are existing spherical storage vessels with a capacity exceeding 4000 metric tons, while there are horizontal storage vessels with storage capacity up to 500 metric tons. These volumes are based on the writer’s experience.

Figure 4: Spherical Storage Vessel
Hydraulic simulation should be performed assuming various feasible flowrates, i.e., the desired receivable quantity of LPG per unit time. The calculation should be cognizance of recommended pressure drop and velocity criteria for LPG transportation.
To determine the optimal pipeline size to transport the product to the storage facility, pipeline sizing satisfying the flow rate should be performed. While performing sizing, consideration shall be given to possible future throughput increases.
Based on the process description, the mechanical discipline should generate a preliminary list of all major equipment. Notable equipment in a typical LPG storage facility may include any of the following:
The layout generated at this stage is very important because it is used to estimate the required land size. It also shows the preliminary location of all key equipment with consideration given to the required spacing as per regulations and standards. If the land has not been acquired after the preliminary layout design has been performed, an appropriate site location is identified for procurement.
A clear definition of the pipeline system should be performed at this stage to identify all the major pipeline components. Some facilities require fixed offshore platforms/jetties with loading and unloading arms, while some utilize Single Point Mooring (SPM) with a pipeline end manifold (PLEM) and hose systems. All the main components of the pipeline system, including pump stations, pigging stations, should be captured in the process flow diagram. A preliminary pipeline route(s) shall be developed at this stage utilizing satellite imagery, available maps and charts. The route shall connect the product source to the storage facility. If products are delivered to customers via pipeline, the route shall be captured.
See below a typical preliminary pipeline route connecting an SPM to an LPG facility for illustration purposes.

Figure 5: Typical Process Flow Diagram for a Pipeline System

Figure 6: Preliminary Pipeline Route for Illustration
LPG is transported by steel pipe materials mostly used are the API 5L materials. A pipe grade should be selected, further utilized for preliminary wall thickness calculation. It is important to perform the wall thickness calculation because it is a key input to the cost estimate. Also, the process department requires internal diameter to perform and optimize flow analysis.
Preliminary electrical designs are performed at this stage. The most important task performed is to estimate the preliminary power requirement for the facilities. Below is a summary of tasks performed during the conceptual design/feasibility studies.
A preliminary control system for the facilities and ancillaries is developed. For effective monitoring, operation and control of the LPG Process, there is a need for an Integrated Control System which may have the following or more:
The Integrated Control System is located in a control room, and the control system interface or communicate with field Instruments located in different position across the LPG plant. All these should be defined and elaborated further as the project progresses.
Civil/structural design at the preliminary stage is not detailed. At this stage, it is imperative to identify the major civil structures for further detailing in future stages of the project. The most important tasks performed are:
At the end of the feasibility studies or conceptual design, a class 4 cost estimate is developed to give an insight into the cost of executing the project. Note this estimate is for decision-making. As the project progresses, more detailed cost estimates are prepared.
At the end of the conceptual design, a list of deliverables to be prepared during front-end engineering design is prepared. There might be inclusion and exclusion from the list when the FEED commences.
Front End Engineering Design (FEED) is performed to bridge the gap between Conceptual Design and Detailed Engineering Design. The preliminary designs from the conceptual design are elaborated at this stage by all departments to have a more detailed design. Process simulations are revised based on better available information, datasheets for all major equipment are prepared, piping layouts are developed, civil designs for major buildings and structures are performed.
Relevant permits are secured during this stage of the project, and the facility location is firmed up for procurement immediately.
A more detailed cost estimate is performed.
Detailed Engineering Design (DED) commences when there is approval to progress the project to the EPC phase. The FEED deliverables are elaborated with new documents included in the deliverables at this stage. All specifications, datasheets and drawings are developed. Detailed designed documents are issued to vendors to procure equipment and items required for construction and installation. Inputs from vendors are implemented in the design as may be required to update the design.
The construction phase is the most prominent phase of the project; it entails the physical execution of the project. A contractor is mobilized to the site to commence construction works. The earliest tasks performed are the civil foundations and structures, followed by equipment installations. Electrical installation and instrumentation hook-up to equipment are performed after mechanical equipment has been performed

Figure 7: Spherical Storage Vessel Construction
At this stage of the project, the facility is brought into operation. After the mechanical completion, products are received into the facility during commissioning, and operation commences.
NFPA list of Codes and Standards: https://www.nfpa.org/Codes-and-Standards/All-Codes-and-Standards/List-of-Codes-and-Standards)
NFPA 58: Liquefied Petroleum Gas Code