Project Management Consultant (PMC) for the cathodic protection system of the 550km 36” gas pipeline from Mtwara to Dar Es Salaam and two gas processing facilities in Tanzania. The Impressed Current Cathodic Protection System (ICCP) was installed to protect the USD10 billion gas pipelines and processing facilities designed according to ASME 31.8 and ASME 31.3 for Tanzania Petroleum Development Corporation.
Client
TPDC (WorleyParsons)
Location
Mtwara – Dar Es Salam
Project Value
R10 billion
Date
2012-2015
Contract
Project Management Consultant